PROJECT LOGISTICS

OUT LOOK
Project Cargo Flow
Infrastructure Construction
Unloading works
Site Location
Land Transportation
Logistic Services Sea Transportation
Material
Local Port Handling
Warehouse & Storage
Discharging Port Import Customs Clearance

Ocean Freight
Air Freight

Loading Port Port Handling


Warehouse & Storage
Export Customs Clearance
Material
Import Land Transport
Loading Works
Project Cargo Flow

Factory
Construction site
Project Logistics Service

Customs Clearance Formalities


Export and/or Import.

Port Handling: Loading and Discharging Work; by Roll On/Off System, etc.
Project Logistics Service

Land Transportation: General Cargo Transportation & Heavy and Over Dimension Cargo.

Sea Transportation: by Container Vessel and Bulk/Heavy Lift Vessel.


Project Logistics Service

Sea Transportation: by Tug & Barge and LCT (Landing Craft Tank).

Loading and/or Unloading Work: by Crane, Forklift and by Jacking & Sliding System.
Customer
• Car manufacturer
Industrial • Chemical plants
• Industrial gas plants

• Road and bridge construction


Civil • Railway construction
Infrastructure • Buildings and public facility constructions

• Power plants constructions


Electrical • Substations
• Electric equipment manufacturer

• Gas refinery plants


Gas & Mining • Mining equipment transport
• Offshore platform transport
Business Flow

Customer Operation Negotiatio Work


Survey Pricing Contract Monitoring Invoicing
RFQ Planning n Execution
Business Flow
Project Phase Business Stage Department
Customer RFQ •Commercial

Survey •Operation
•Vendor Management

Pre Award Stage (Bidding) Operation Planning •Operation


•Vendor Management

Pricing •Commercial
•Vendor Management
Negotiation •Commercial
Award Stage Contract •Commercial

Work Execution •Operation


•Vendor Management
Execution Stage
Work Monitoring •Commercial
•Finance
•Finance
Completion Stage Invoicing •Commercial
•Operation
Request for Quotation (RFQ)

• Volumes
Cargo • Dimensions
Specifications • Weight

• Loading and/or unloading works


Scope of • Customs clearance
Works • Transportation (ocean freight, land transport, etc.)
• Port handling

• Shipment schedule
Shipment • Project duration
Information • Cargo volume per shipment
Survey

• Volumes
Cargo • Dimensions
• Weight

• Land: road conditions & width; bridges conditions


& strength; obstacles (over high, over wide)
Routes • Ocean: loading & unloading location; port facility;
port/river draft; wharf/jetty capacity; current

• Unloading point / storage yard


• Access inside site location
Site Location • Site working hours
• Other permit / social condition
Operation Planning

• Handling scheme / flow


Cargo • Obstacle handling plan
Handling • Time frame

• Use normal flatbed, low bed or modular trailers


Equipment • Use tug & barge, LCT, bulk vessel or container
Choice vessel; stowage plan
• Use cranes, forklift or jack / slide mode

• Lashing method on trailer and/or barge


Securing & • Safety equipment for worker
Safety Method • Escorting plan
Pricing

• Match with scope of works requested


• As much as possible no changes in time of project
Qualification executions
• High flexibility to anticipate deviation between
planning and execution

• Level of risk; site conditions and location, road access, etc.


• Equipment resources
• Documentation correctness
Factors • Cargo or shipment volume
• Working duration
• Customer relation / chances
• Competition
Operation Work Flow
Project Phase Operation Team
Pre Award Stage • Team allocation
• Survey report evaluation
(Bidding) • Preliminary engineering evaluation
• Technical documentation requirement
Award Stage confirmation
• Detailed technical document roll out
(Pre Project Execution) • Team placement confirmation
• Attend technical meeting
• Technical documentation requirement
confirmation for sub contractor
Pres Site Execution Review • Detailed technical document roll out by sub
contractor
• Sub contractor team placement confirmation
• Attend technical meeting
Site Execution • Technical attendance & supervision
(for critical operations only)
Work Completion • Technical report
(Handover) • Work acceptance confirmation