TIcs Telecom Infrastructure Solution Providers
Group
2

Building, Managing and Sharing Site for Telecom Sector


TIcs Company Profile
Group
3

 Established in 1994, TICS is a Consultancy Group offering Site


Management Services for all Infrastructural activities related to Site
Build Up & Operations and Maintenance for Telecom Sector.


“Mr Ardaman Singh”.

 CEO – TIcs Infrastructure
 Consultancy Pvt Ltd.
TIcs
 What they Do
Group
4

Project Management Solutions

 Site Survey & Site Planning

 Soil Survey for Ground based Antenna Carriers

 Checking structural feasibility for Roof Top based Antenna

 Foundation Design for Antenna Carriers


TIcs
Group
5

 Site Specific Drawings & Documentation


 Site Specifications

 Bill of Material & Site Cost Budget

 Supervision of Civil Works, Tower Erection and Electrical

 Installation

 Quality Assurance plan


TIcs
Group Step 2 – Soil Survey for Ground Based Antenna.
6

 Step 1 – Site Survey.


TIcs
Group
 Step 4 – Bills of Material and Site Cost Budgeting.
7

 TIcs Step -5 Tower Erection and Installation
Group
8

TIcs Step 3 – CAD Design for the Structure.
Group
9
 Final Outcome – Tower is ready

10
Hierarchy Level followed in Engineering Support
and Operations and Maintenance Departments.
11

From Top to Bottom

1. Project Manager. ( Exp. 10 – 15 Years)

2. Deputy Project Manager ( Exp. 5 – 10 Years )

3. Project Coordinator ( Exp. 3 – 5 Years )


12

3. Project Coordinator ( Exp. 3 – 5 Years )

4. Engineers ( Experience 2 – 3 Years )

5. Junior Engineer ( Minimum Experience 1 year)

6. Trainee Engineers ( Fresher's )


DEPARTMENTS
13

ASP Shashi Bhushan


ARP-1 Rajiv

ARP-2 Vivek

Problems faced by the middle
managers
14

 Which type of antenna should be used by the


company?
 What should be the range area for the tower?
 Checking soil condition?
 Selection of workers for a particular site?
15

HUMAN RESOURCE FUNCTION


MAN POWER PLANNING

16

Total No of Employees - 900.

Engineering Support - 228

Operation & Maintenance - 592

Regular Staff – 80 ( Admin, Accounts, HR,


CAD, Front office)
RECRUITMENT & SELECTION

17

Minimum Qualification Required

Diploma in Electronics, Computer or Infrastructure ( Civil )

OR Degree Equivalent from any Recognized University.

Diploma with 2 year is equivalent to Fresher Engineer.


Supply Side
18

Various sources from where manpower is hired.

1. Job Advertisement.
2. Consultants
3. Walk in
4. Recommendations
5. Campus Interviews.

Most preferred source is Recommendations and least preferred is


Consultants.
Supply Side Divided.

19

Reference Group Campus


10% 25%

Advertisement
40%

Consultants
25%
20

After doing the initial Screening matching the profile with job
specification and telephonic interviews – short listing is done.

One HR Person from Ericsson and one from the company together take
the call for selection process.

One Specialized person is there who’s main job is to travel across the
India and do the Short listing.
PAYROLL
21

 Timings 10 to 6 pm
 Overtime incentives applicable.

Accounts finance department

HR(ericsson) will prepare Pay rolls

Mailing
Orientation and Induction

22

Two to three days are kept for Orientation programme and followed by
7 to 10 days for Training . [ on the job training ].

Another week time is given to candidate for travelling and


Accommodation. So in all one month time is there before a person can
actually start contributing and assigned any work.
Probation and Final Placements.

23

1. Fresher's - this period is about 6 months.

2. Experienced - One year.

Transfer Policy - Any candidate can be located anywhere in India.

[ Most important aspect , before giving appointment letter consent of


prospective candidate is taken that he can be posted any where ,
however in most cases a candidate from south India will be posted in
somewhere south India only ]
24

Operation & Maintenance


Department Function
Functions

25

1. Keep the Site Alive.

[ Site cannot be shut down for any of the reason like :


Electricity Problem , Fuel , Raw material or Manpower . ]

2. First level of Electronic Equipment Installed Maintenance.

[ If for any reason any Electronic Equipment go down or stop


functioning properly it will inform Project Manager of Equipment
Supplier & he will rectify the Problem ]
Engineer Support Function

26

1. Site build up Activity :

 a) Site Survey & Site Planning


 b) Soil Survey for Ground based Antenna Carriers
 c) Checking structural feasibility for Roof Top based Antenna
 d) Foundation Design for Antenna Carriers
 e) Site Specific Drawings & Documentation
 f) Installation.
Demand Forecasting

27

Their Main client is Ericsson , From which they


get maximum work.

1. How much work is Assigned by Ericsson to


Tics Pvt ltd. is depend on how much work is
Ericsson is getting from major Players in
Indian Telecom Industry.
Purpose Of Forecasting
28

 Planning & scheduling production(towers)

 Acquiring inputs (labour, raw material and capital)

 Making provision for finances


Growth Pattern.

29

According to all studies it is known that in this financial year nearly


30,000 sites will be installed throughout India. ( 2010 – 11 )
[ this figure is reached by taking care into account previous data,
growth projected by TRAI. ]

Note : Ericsson will have 20 % of the share of this entire market.


Means 20 % of 30,000 = 6000 Sites.
Other players in this sector are : Nokia , Siemens , Alcatel and
one Chinese player Huawai & Zteck.
30

Tics will have around 35 to 40 % of Ericsson share.


[ Past experience , good relations with company , reliable sources. ]

Based on this information work load analysis is done. How much


manpower will be required to carry out this work.

[ An increase of around 10 to 15 % in Manpower requirement ]

As if now Tics is handling Operation & Maintenance of around


10,000 sites with the help of 592 employees.
31

Once any project is assigned by Ericsson , any where in India ,


company is given an average of 4 weeks of time to complete the task

For the completion of project old & experienced staff is selected


by the department heads.

Manpower is selected is such a way that work in pipeline is not


affected at all.
Major Players in Telecom Industry.

32

1. BSNL
2. VSNL
3. Bharti Airtel.
4. Vodafone.
5. Tata Tele Services
6. Reliance Info comm.
7. Aircel.
8. Idea Cellular.
9 Spice.
10 Alcatel
Flow of information
33

Tics employee

Shashi bhushan

ericsson
Promotion Policy :

34

Form Trainee Engineer to Engineer it takes around 3 years.

From Engineer to Project Manager [ Selection policy , confidential ]


Continuous Training

35

1. If there is introduction on any new equipments , new technology or


any kind of new innovations or any new process in introduced than
company sends its employees for technical training.

[ Basically a place is chosen for training purpose , all the trainee than
called upon and one expert technical person impart the knowledge
which is on the job training only. ]
TIcs
Group

36

Thank you

You might also like