Professional Documents
Culture Documents
Tenaris Presentation Sinopec Nov 2019 - Rev2
Tenaris Presentation Sinopec Nov 2019 - Rev2
Techint Group
Worldwide (2018)
3.6 million 13 million
Ton of SMLS and WLD Ton of steel* products shipped
pipes shipped
57,100
Permanent staff 1.6 billion 124 thousand
Dollars of anual sales equivalent barrels of oil
produced per day
23.5
billions dollars
annual revenue 1.2 billion 927,000
Dollars in backlog Hospital admissions
First work:
Santos-São Paulo pipeline started
a series of projects in Brazil in 1950.
Since 1947, when Italian businessman Agostino Rocca Techint Group has as a priority the safety of its
began Techint's activities in Brazil, Argentina and Mexico, employees, the care of the environment and the
Techint Group companies share a long-term philosophy of continuous investment in its human resources, its
industrial development, commitment to the communities in industrial facilities and the development of new
which they operate, integrity and a passion for quality. technologies.
Revenue Employees
R$ million direct
Tenova 18.6 28
R$ 11.6 bi 7,005
R$ 10 Bi Revenue*
490 MW of energy generated from the use of steam and gas generated by
the production
*2018 Results
14
Natural gas
processing plants
4 mining assets
10 million
ton of steel / year
Cubatão
550
kton/year of pipe
1.000.000 1.149
Man Hour/year Employees
Confab Equipamentos Other Plants
O&G / Petrochemical Coating: Anticorrosive, Flowcoat,
Pulp & Paper Thermal Insulation & Concrete
Mining & Steelmaking Rods
Energy
Services
Patio & Harbor Machines
Assembly & Services
R&D Center
Nuclear Power
OCTG
Participation in 500+ offshore wells
450.000 ton onshore and offshore
17+ years of LTA contracts with Petrobras
Supply to all major oil bompanies
Total Inspection
Entry Platform
Sales by Region
100% 22
Africa
10% North Sea
Russia 24%
10%
Products Available Manufacturing
Europe &
Facilities Caspian
2.3/8” – 42” 12%
All Grades 12 in Tenaris Plants North America
OD: 12 ¾” - 48”
• SAWL UOE WT: 0.250” - 1.575”
• 400 kton/year
OD: 5 ½” - 20”
• ERW • 120 kton/year
WT: 0.156” - 0.545”
Special requirements: Sour Service (X65, X70, X80), Dimensional, High toughness,
offshore (DNV), High Collapse (Fab = 1)
Video
EXTERNAL:
INTERNAL:
• Epoxy
• Anti-abrasives
Steel Pipe
Adhesive
Primer (FBE)
PE / PP
Steel Pipe
Coating Application
Cement
Iron Ore/Sand & Grit
Concrete and
Reinforcement
Application
Entry Platform
MOBILE
PLANT
Cutback &
Weighting
Anodes
Instalation &
Repair
Cement
Cutback
Weighting
Anodes Installation
& Repair
Solid PP
Adhesive
Primer (FBE)
Solid/Syntactic PP
Solid PP
Steel Pipe
Extruder
Infrared Oven
Pipe Washer
Thickness
Inspection
Finishing/
Cutback
Final
Inspection
Brazil
TenarisConfab
City: Pindamonhangaba/SP
Area: 1.400.000 m²
Capacity: 550 kton/year coated pipe
Confab Equipamentos
City: Pindamonhangaba/SP
Area: 904.000 m²
Capacity: 1.200 Th MH/year equipment
Brazil
800 km
500 km
270 km Itaguaí
Brazil
300 km
230 km
180 km
São Sebastião
RIO DE JANEIRO:
12 berths / 24h operation
OCTG Products
Joint type Weld-on connector Weld-on connector Threaded & coupled Threaded & coupled
Comes with
Dopeless® Tech. Under development Under development Dopeless® Tech. Available
Testing API RP 5C5 CAL I API RP 5C5 (Series B) API RP 5C5 CAL I -
Note: Tenaris LOD offer includes some integral connections -threaded on the pipe body- from the recognized Wedge Series 500 as follows:
Wedge 511® 18” and 18 ⅝”, Wedge 513® 18” and Wedge 521® 18” and 18 ⅝”. All available with Dopeless ® Technology.
Integrated
+ +
Mills and
Quality
Manageme
nt System
Ratings:
• 85-100% - Pipe Body Tension, Compression and Bending Capacity
Onshore
typical well
Casing
strings
always
protected
inside the
well bore
NOT
EXPOSED
Production zone
REGULAR CASING
REQUIREMENTS
Structural Loads
Shallow Water:
Jack-up or Platform
Sea surface
Casing
strings up
to the
surface
EXPOSED
Seabed
Casing
strings
inside the
well bore
RISER FUNCTION
Production zone
No demanding
sea conditions
BOX
Hook Effect
Video
Video
Video
Ratings:
• 100% - Pipe Body Tension, Compression and Bending Capacity
Connector´s
Designs
• LR: Low pipe wt range.
• HR: Heavy pipe wt range.
Fatigue Application
• Enhanced thread profile
• Improved Girth Weld
• WPS
• Weld grinding
Rig motion
and bending
loads
Long
Production
Life
Increasing
fatigue risk
Critical Loads
Fatigue and Bending
– M&B validation
– Sealability tests – Conductor casing
– Sealability tests – Surface casing
– Fatigue
– Driving Assessment
Summary
• More than +200 operations, with field experience constantly being increased. (from 20” up to 36”)
• BlueDock® connectors run in different water conditions & Installations methods (Shallow, Deep and Ultra-Deep water).
• Location
– Pindamonhangaba, Brazil
• Process
– Pipe (UOE)
– Connector
– Welding and Final Conditioning
Blank
- Seamless pipe Machining cone and bevel Threading, finishing and gauging
- Forging