Professional Documents
Culture Documents
GROUP 1 Risk and Hazard Assessment
GROUP 1 Risk and Hazard Assessment
Preventive measure:
-Tree planting
-Proper waste
segregation
-Report necessary
violation/ problems that
may affect or contribute
to flood
-Coordinate with
barangay official about
the clogged drainage
Hazard Probable Probability Effect Suggestions for Preventive
Cause Rate Actions
Leptospirosis
-Avoid swimming From lakes,
rivers, flood waters or swamp
-avoid water or soil that are
contaminated with animal
urine
-Boil water as much as
possible
-demonstrate proper hand
hygiene and hygiene.
-sanitize areas that are
contaminated
-
Hazard Probable Cause Probability Effect Suggestions for
Rate Preventive Actions