LCLS Conventional

Facilities

Dick McDonald
Deputy Systems Manager
April 20, 2006 Dick McDonald
1
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Tunnel Safety & Logistics

Site Layout

Tunnel & Cavern X-Sections

Tunnel Safety

Tunnel Utilities

April 20, 2006 Dick McDonald


2
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Overall Site Plan

April 20, 2006 Dick McDonald


3
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Tunnel Layout

NORTH Access Tunnel


Length = 324’
Min cover = 20’
Max cover = 100’

RSY

UH Tunnel X-Ray Tunnel FEH Cavern


Length = 575.5’ Length = 645.4’ Length = 227’
Min cover = 20’ Min cover = 40’ Min cover = 80’
Max cover = 60’ Max cover = 80’ Max cover = 100’

April 20, 2006 Dick McDonald


4
Tunneling Safety & Logistics dickmac@slac.stanford.edu
FEH Cavern X-Section

16’ Rock dowels

Excavation Sequence #

Lattice Girder &


12” Shotcrete

FEH Cavern
48.5’ Wide
32.8’ High

April 20, 2006 Dick McDonald


5
Tunneling Safety & Logistics dickmac@slac.stanford.edu
UH Tunnel X-Section

2’ thick + concave
section to increase
floor rigidity

Concave invert
designed to
resist uplifting UH Tunnel 21’ Wide 18.5’ High
April 20, 2006 Dick McDonald
6
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Sequential Excavation & Support Cycle

1. Excavate with road header


2. Scale & prepare surface for shotcrete
3. Apply 3” shotcrete
4. Install girder section
5. Install rock dowels as required
6. Apply 3” shotcrete
7. Start next cycle

April 20, 2006 Dick McDonald


7
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Top Heading & portal Support

Top heading with lattice girders

Portal support
Rock dowels
Lattice girders
Shotcrete

Utilities

April 20, 2006 Dick McDonald


8
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Road Header at Work

50 ton Road Header

April 20, 2006 Dick McDonald


9
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Load, Haul and Dump (LHD)

April 20, 2006 Dick McDonald


10
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Shotcrete Pump

Pump can be
at surface or
underground

April 20, 2006 Dick McDonald


11
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Construction Safety Items
•Tunnel Safety
–Usual Safety Items

•Hard Hats

•Eye & Ear Protection

•Steel Toe Boots

•Above items are standard issue to employees & visitors entering construction
areas.

April 20, 2006 Dick McDonald


12
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Tunnel Safety Items
Tunnel Required PPE are issued to
employees and visitors going underground

MSHA Approved Light


MSHA = Mine Safety & Health Administration

Self Rescuer
Converts carbon monoxide to carbon dioxide

April 20, 2006 Dick McDonald


13
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Tunnel Additional Required PPE

Self rescuer Cap lamp Rescuer and cap lamp in use

April 20, 2006 Dick McDonald


14
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Tunnel Safety
Typical Tunnel Hazards
Tight working spaces, low light
Uneven working & walking surfaces
Wet and muddy
Working in close proximity to large equipment
Falling rocks, earth and shotcrete
Utility supply lines
Lack of ventilation
Noise
Methane gas

April 20, 2006 Dick McDonald


15
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Tunnel Classification

Tunnels are Classified as Gassy, Potential


Gassy or Non gassy
Madera sandstone can have small isolated
pockets of methane gas so our tunnels are
potential gassy
Equipment and electrical have to be MSHA
approved for potential gassy
We are not overly concerned about gas, but are
taking the next step to be safe
April 20, 2006 Dick McDonald
16
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Tunnel Utilities
Compressed air – for pneumatic tools
Water – for tool use and dust control
Electrical power – for equipment & lighting
Ventilation – for fresh clean air
Communication & Data
Discharge water – excess water used in
construction

April 20, 2006 Dick McDonald


17
Tunneling Safety & Logistics dickmac@slac.stanford.edu
15’ Tunnel

Typical tunnel utilities


Power & lights

Ventilation

Com. & Data

Water
Air
Discharge

April 20, 2006 Dick McDonald


18
Tunneling Safety & Logistics dickmac@slac.stanford.edu
Typical Vent Fan and Lights

Vent fan & light stringer