Process Improvement: Tuesday, March 29, 20 22 1
Process Improvement: Tuesday, March 29, 20 22 1
Process Improvement: Tuesday, March 29, 20 22 1
IMPROVEMENT
Gangway
Bin Lift
Assembly
Tailgate
Shearing Area
Line
Tailgate LH/RH LH/RH Welding Finishing
Hinge fixture Fixture
Assembly Assembly W
Assy I
P
Gangway
Assembly 6 Series
6 Series
Tailgate Tailgate Full
Assembly
Welding &
Bin Lift
Ejector Assy 17
Series Series Fixture Finishing
Bin Lift
WIP
Subassy
WIP WIP B/C Class -WIP B/C Class -WIP B/C Class -WIP B/C Class -WIP
Benefits
1. Zigzag Material flow avoided
2. Single Piece flow of material
3. Less material handling
4. Space Optimization
5. Optimized space will be utilized for
a. Tipper Tailgate Welding (Proposed New fixture)
b. Tipper Headboard welding (Proposed New fixture)
c. Mahendra Sideboard Welding Station (Need to Check Space feasibility)
hyva.com
hyva.com Tuesday, March 29, © Copyright HYVA Anand Bokade 4
2022
COSMETIC AREA IMPROVEMENT
2. 3M tape application to be
done after final touchup
Benefits:-
1. WIP storage Space Optimization
2. Space can be utilized for processed
parts storage
3. 5’s improvement
Benefits:-
1. Unsafe area
2. 5’s NOK
Benefits :- Engraving of 71
Engraving time reduced from 35sec to 6 parts in Nesting
sec-
29 sec reduction in cycle time /
engraving
Further- Pravin Chopade working to identify such parts and modifying nesting
hyva.com Tuesday, March 29, 20
hyva.com 22 © Copyright HYVA Anand Bokade 9