Tutorial On Setting Up
Tutorial On Setting Up
Tutorial On Setting Up
• -30
• +30
PROCESS
1. SET UP TRIPOD
2. LEVEL LOWER BRANCH OF TOTAL STATION
3. LEVEL THE INSTRUMENT
4. CALLIBRATION OF INSTRUMENT BY:
A. Backsight by angle
B. Backsight by coordinate
C. Resection (triangulation)
5. OPERATION
1. OBSERVATION(GATHER DATA)
2. STAKE OUT DATA
1. POINTS DATA
2. POINT ON THE LINE AND OFFSET FROM THE LINE
Backsight by angle:
• must know instrument coordinates and have a
landmark/target at a known azimuthBacksight
by coordinate:
• must know instrument coordinates and have
mirror target set on a position of known
coordinates
Resection (triangulation):
• must have 3 or more mirror targets
established at known 3D coordinate
SURVEY DATA FOR STAKE OUT
A. ROADS
B. BUILDING
C. BRIDGE
ROAD PLAN & FLOOD CONTROL
• ROAD PLAN
–ALIGNMENT
–DESIGN PROFILE
ROAD PLAN – ALIGNMENT
ROAD PLAN-PROFILE
BUILDING PLAN
• HORIZONTAL
–FOUNDATION PLAN
• FOOTING
• COLUMN
• VERTICAL ELEVATIONS
–SECTION PLAN
HORIZONTAL DATA
VERTICAL DATA
BRIDGE PLAN
• HORIZONTAL
–FOOTING
• TOP VIEW PLAN
• ALIGNMENT
• VERTICAL ELEVATIONS
–SECTION VIEW
• BOTTOM OF FOTTING
• TOP OF FOOTING
• BOTTOM OF GIRDER
• ETC.
BRIDGE
HORIZONTAL & VERTICAL PLAN