Professional Documents
Culture Documents
Milk Run Operations
Milk Run Operations
Milk Run Operations
02 Definition
07 Case Study
08 Future Improvement
09 Conclusion
INTRODUCTION
Just-in-time delivery
2
possible
Cargo collection
The parts supplier loads the parts based on a stowage plan.
Transport responsibility
It is natural to think that the responsibility belongs to the parts
supplier before loading the goods onto the truck, and the
responsibility shifts to TMT once they are loaded onto the truck