VISION
To become center of excellence for engineering, construction, and project
management, achieving extraordinary result by incorporating lean philosophy and
state-of-the-art technology
MISSION
Our mission is to build and organize infrastructure and industrial plant to enhance
the future.
“
Collaboration for Excellence
”
R
I N F R A S T R U K T U R
A
HOW WE DELIVER OUR VALUES
PROJECT OWNER
PROJECT
OWNER
PMC
EPC CONTRACTOR
PROJECT
I N T E G R AT O R
VENDOR SPECIALIST
CONTRACTOR
VENDOR SUB-CONTRACTOR
C O N V E N T I O N A L I N T E G R A T E D
FOR EXAMPLE…
Conventional Integrated
Project Scheme Project Delivery
(in million USD) (in million USD)
SUGAR
FA C T O R Y
SECTOR
EXPERTISE
WAT E R
T R E AT M E N T
QUALITY ASSURANCE
LEGALITIES
LEGALITIES
CERTIFICATE
CERTIFICATE
PROJECT MANAGEMENT SERVICES
OUR project management system to optimize organizational functions, cutting through unnecessary bureaucracy
to boost productivity and reduce costs.
SERVICES
Hazard and Operability Study (HAZOP)
We put heavy concern on safety and operability of our result of work. We provide extensive study on the
hazard and operability before project execution. Our team consists of a range of multi-disciplinary member
and a number of highly-experienced leaders.
OPERATIONAL & MAINTENANCE SERVICES
Effective Operational & Maintenance practice is the best method to promote reliability,
safety, and energy efficiency in our client’s operating plant. Energy losses from steam,
water and air leaks, uninsulated lines, and other losses from poor maintenance are often
ignored since operational activities functions just fine.
OUR
PRE-COMMISSIONING, COMMISSIONING & START-
SERVICES
UP
Highly multi-disciplined, systematic, and professional methodology is critical to escort
our client’s facility to their operational phase. It is important for us to manage this phase
with the highest regard of safety, technical efficiency, schedule, and budget.
OUR
PROJECT STUDY, ENGINEERING, and EVALUATION
SERVICES
Development stages such as project study, engineering phase, and research evaluation must be perfected to ensure
flawless construction & operational phase. To ensure the quality delivered to our clients, we provide our expertise for
in-house engineering work.
We always achieve on-time delivery and outstanding quality on our engineering and research works. Providing study
results about technical, design, and commercial service for our client to support either preliminary study or
construction activity.
PROJECT PORTFOLIOS
ENERCO RPO TDAE PROCESSING PLANT
(PMT) PERTAMINA RDMP CRUDE OIL TANK COMPLEX - PMT
Project Owner : PT Enerco RPO International PERTAMINA RDMP RU V WATER TREATMENT PLANT – PMT
Main Contractor : RDMP JO
Project Value : USD 1,500,000 LOCAL PARTNER FOR FOREIGN SUPPLIER COMPANY
Project Value : USD 8,000,000
Service Period : May 2018 – Jun 2021 Main Contractor : RDMP JO
Schedule : Mar 2019 – Jun 2021
Project Value : USD 18,500,000
ENERCO RPO TDAE PROCESSING PLANT Service Period : Febr 2020 – Dec 2021
(O&M)
Project Owner : PT Enerco RPO International
Project Value : USD 300,000
Service Period : Jan 2020 – Jun 2021
USD 18,500,000 3,500 MTPH February 2020 – July 2021 Balikpapan, Indonesia
Scope Stakeholder
Rapid assists the project owner to acquire an improved capacity and quality PT Pertamina
for their desalination plant with a better price. This is achievable by
Owner
engineering and designing the suitable technology and process to comply
with the standard of our client. We then assist the project owner until the
delivery of the technology on-site to ensure perfect delivery and quality to RDMP JO
our client. Main Contractor
Scope:
• Fabricate and supply Sea Water Desalination, Reverse Osmosis, De- Aquatech SA – Rapid Infrastruktur Indonesia JO
mineralization and Re-mineralization system Engineering, Fabrication, and Supply Vendor
• Specialized in carbon steel, super duplex stainless steel, glass reinforced
epoxy (GRE), and fiber-reinforced plastic materials
• Project schedule control Subcontractors
• Technical assist in project execution design phase
PERTAMINA RDMP RU V WATER TREATMENT PLANT
LOCAL PARTNER FOR FOREIGN SUPPLIER COMPANY (slide 2/2)
FABRICATED ITEMS
USD 8,000,000 15,000 MT (3 tanks) March 2019 – June 2021 Balikpapan, Indonesia
Scope Stakeholder
Rapid provides consulting service to our client starting from proposal onto project PT Pertamina (Persero) RU V
execution phase. We provide technical and commercial assistance to ensure the project
runs without any issue on technical execution and project cashflow. Owner
We help top level management in decision making to avoid delays in project execution,
since the pandemic hit our project site in the middle of our working schedule. RDMP JO
Main Contractor
Scope:
• Project management for 3882 Tonnes of crude oil tank construction
• Plan project execution for additional complementary scope such as; insulation
clip support, walkway and platform, painting, and hydrotest PT Cahaya Hidup Primakarya
• Cost and project schedule control Contractor
USD 4,000,000 6,000 TCD Feb 2020 – Dec 2021 Sumba, Indonesia
Scope Stakeholder
Developing one of the major investments from our client which is 6000-12000 TCD sugar milling and
refining plant. This project is in need for a high-performing management team. Therefore, Rapid
collaborate with Muria Sumba Manis team to lead, manage, review, rearrange agreements and scope PT Muria Sumba Manis
of works between sub-contractors, vendors, and technology licensor. We function as project integrator
across discipline and stakeholders. Owner
We achieved 200% construction progress after the implementation of our project management system, PT Rapid Infrastruktur Indonesia
bringing the project closer to achieve the targeted schedule. Project Integrator
Project Management Services
• Project status and progress evaluation
• Commissioning and Start-up assist
• Contract settlement process Subcontractors
• Crash program design to speed up the project • PT Swadaya Graha
• Refinery sugar is available to be processed from sugar cane and raw sugar • PT Tatamulia Nusanra indah
• PT Weltes Energi Nusantara
• Construct and commissioning boiler STG powered with bagasse and coal
• PT Syamsir Karya Pertama
• Design, construct and commissioning coal handling system, raw sugar handling system, and • Statec Binder GmbH.
bagging system
Engineering and Procurement Vendor
• Isgec Heavy Engineering Ltd.
PROCESS EQUIPMENTS VESSELS AND PIPING
USD 1,500,000 180,000 MTPY May 2018 – June 2021 Batam, Indonesia
USD 2,500,000 52,000 MTPY Nov 2019 - Nov 2020 Bojonegoro, Indonesia
Scope Stakeholder
PT Pertamina EP Cepu
Rapid assists our clients to provide a solution to semi-solid waste
treatment in Pertamina JTB Gas Processing Plant. Owner
Using the technology provided & engineered by Rapid, our client could
easily dispose their waste in dry-solid form, complying with national
regulation.
PT Rapid Infrastruktur Indonesia
Contractor
Project Management and Consultancy Services
• Technical and commercial assist for vendor in since bidding phase PT Energy Management Indonesia
• Risk matrix analysis Contractor
• Cost control
• Provide a cutting-edge engineering solution
• Project schedule control
• Technical assist in project execution design phase Alfa Laval Corporation
Fabricator
OUR
CONSTRUCTION
P O RT F O L I O S
ENERCO RPO TDAE PROCESSING PLANT - Construction
Project Value Pipeline Constructed Schedule Location
12 km
USD 3,200,000 May 2018 – Dec 2018 Batam, Indonesia
17,432 DI
Scope Pipeline Details Stakeholder
Pipeline Construction
• Constructing 17.432 Dia-inch carbon steel pipeline from Rubber
Processing Plant to Jetty
PT Enerco RPO International
• Working on Horizontal Directional Drilling (HDD) on the
underground pipeline Owner
• Installing pipe sleeper on the surface pipeline • 12“ Pipeline DAE 3 km PT Rapid Infrastruktur Indonesia
Mechanical Works • 12” Pipeline TDAE 3 km Contractor
• Installation of 4,000 T of tanks and equipment
• Construction of 9,268 T of Steel Structures • 12” Pipeline HACE 3 km
• 12” Pipeline Fire Water 3 km
Piping Works
• 150,500 Dia-in of CS, SS, duplex, P22 pipe materials
ENERCO JETTY ANOTHER LOOK OF ENERCO JETTY FIRE WATER, DAE, TDAE, AND HACE
JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE (slide
1/3)
Project Value Work Volume Schedule Location
6.79 Km
USD 3,000,000 January 2021 – September 2021 Bojonegoro, Indonesia
9,397 DI
Scope Stakeholder
Rapid is responsible to manage pipeline works, starting from site PT Pertamina EP Cepu
preparation onto commissioning. We employ high-performing project
management team to tackle any technical and social issue which may arise Owner
in executing this project.
SPECIFICATION HIGHLIGHTS
Coated with
3-Layer Using rare material
WELDING PREP
USD 300,000 180,000 MTPY January 2020 – June 2021 Batam, Indonesia
Scope Stakeholder
Rapid supports Enerco TDAE Plant even further after the completion of the
plant,
Supporting operational and maintenance activity to ensure every aspect of
engineered process and mechanical performance runs without any crucial PT Enerco RPO International
issue. Owner
Scope:
• Upgrading and provide improvement for convenience plant operation and
maintenance PT Rapid Infrastruktur Indonesia
• Network of manufacturing facilities and service centers, which provides Contractor
support for operation and maintenance activities
• 24/7 services manpower support to run the plant safely and finish every
job incident free
• Confined space maintenance work
PREPARATION FOR CLEANING COLUMN
HEAT EXCHANGER CLEANING
(CONFINED SPACE)
HEAT EXCHANGER DISASSAMBLING PULLING OUT HE TUBING
HEAT EXCHANGER (HE) WORKERS USING HAZMAT SUIT HEAT EXCHANGER TUBING
DISASSAMBLING TO CLEAN THE HE LIFTED
DJARUM GROUP MURIA SUMBA MANIS SUGAR PLANT
OPERATION AND MAINTENANCE
Scope Stakeholder
After the plant has been commissioned and ready to operates, Rapid
Infrastruktur Indonesia ensuring the plat operates optimally by providing
Operation and Maintenance service. We provides engineers and technicians PT Muria Sumba Manis
integrated to client’s operation team on Processing Plant, Power Plant, and Owner
other utility area to assists and to provide professional suggestions for
maintenance to maximize production rate. PT Rapid Infrastruktur Indonesia
Operation and Maintenance Team
Scope:
• Providing experienced engineers to assist client’s daily operation
• Troubleshooting and performing reparation on-site to ensuring production rate
• Standing by 24/7 Preventing production loss and reducing downtime
BOILER SOFT FIRING MONITORING FROM DISTRIBUTED CONTROL SYSTEM
USD 200,000 6,000 TCD June 2020 – December 2020 Jakarta, Indonesia
Scope Stakeholder
Rapid collaborates with Institut Teknologi Bandung to conduct an PT Enerco RPO International
evaluation of design capacity of the TDAE Plant in several operational Owner
scenarios.
Phone:
+62 21-27819899
Address:
Jl T.B. Simatupang No. 23, RT.3/RW.1, Cilandak Barat,
DKI Jakarta 12430
Website:
www.rapidinfrastruktur.com