ENHANCING THE FUTURE

VISION
To become center of excellence for engineering, construction, and project
management, achieving extraordinary result by incorporating lean philosophy and
state-of-the-art technology

MISSION
Our mission is to build and organize infrastructure and industrial plant to enhance
the future.


Collaboration for Excellence

R

I N F R A S T R U K T U R
A
HOW WE DELIVER OUR VALUES

PROJECT OWNER
PROJECT
OWNER

PMC

EPC CONTRACTOR
PROJECT
I N T E G R AT O R

VENDOR SPECIALIST
CONTRACTOR

VENDOR SUB-CONTRACTOR

C O N V E N T I O N A L I N T E G R A T E D
FOR EXAMPLE…

Conventional Integrated
Project Scheme Project Delivery
  (in million USD) (in million USD)

MPC  2   Using Integrated Project Delivery System enable


EPC     significant improvement which cannot be implemented
  Engineering 5 5 using the Conventional Project Scheme. We are able to
  Procurement 55 55 minimize the vertical management chain and ‘flatten’ the
  Construction 15 15 organization chart. With the right leadership, this will
  Project Management 10 10 improve the response time and agility of the project
  Contingency 2 0 delivery team, also less time and effort for plan-do-
  Profit 10 0 check-action iterative cycle.
  PPh 3 0
Subtotal 102 85
Contingency 10 27 Profit sharing
TOTAL 112 112

“Integrated project scheme will be 15% more


efficient than conventional project scheme”
POOPW
EE RRAT I O N A N D PETROCHEMICAL OIL AND
GMEANIENRTAT
E NI A
O NC E GAS

SUGAR
FA C T O R Y

SECTOR
EXPERTISE
WAT E R
T R E AT M E N T
QUALITY ASSURANCE
LEGALITIES
LEGALITIES
CERTIFICATE
CERTIFICATE
PROJECT MANAGEMENT SERVICES

Project Management Consultancy 


Rapid emerge as a disruptive idea in the middle of a stagnant industry, granting alternative approach of

OUR project management system to optimize organizational functions, cutting through unnecessary bureaucracy
to boost productivity and reduce costs.

SERVICES
Hazard and Operability Study (HAZOP)
We put heavy concern on safety and operability of our result of work. We provide extensive study on the
hazard and operability before project execution. Our team consists of a range of multi-disciplinary member
and a number of highly-experienced leaders.
OPERATIONAL & MAINTENANCE SERVICES
Effective Operational & Maintenance practice is the best method to promote reliability,
safety, and energy efficiency in our client’s operating plant. Energy losses from steam,
water and air leaks, uninsulated lines, and other losses from poor maintenance are often
ignored since operational activities functions just fine.
OUR
PRE-COMMISSIONING, COMMISSIONING & START-
SERVICES
UP
Highly multi-disciplined, systematic, and professional methodology is critical to escort
our client’s facility to their operational phase. It is important for us to manage this phase
with the highest regard of safety, technical efficiency, schedule, and budget.
OUR
PROJECT STUDY, ENGINEERING, and EVALUATION
SERVICES
Development stages such as project study, engineering phase, and research evaluation must be perfected to ensure
flawless construction & operational phase. To ensure the quality delivered to our clients, we provide our expertise for
in-house engineering work.

We always achieve on-time delivery and outstanding quality on our engineering and research works. Providing study
results about technical, design, and commercial service for our client to support either preliminary study or
construction activity.
PROJECT PORTFOLIOS
ENERCO RPO TDAE PROCESSING PLANT
(PMT) PERTAMINA RDMP CRUDE OIL TANK COMPLEX - PMT
Project Owner : PT Enerco RPO International PERTAMINA RDMP RU V WATER TREATMENT PLANT – PMT
Main Contractor : RDMP JO
Project Value : USD 1,500,000 LOCAL PARTNER FOR FOREIGN SUPPLIER COMPANY
Project Value : USD 8,000,000
Service Period : May 2018 – Jun 2021 Main Contractor : RDMP JO
Schedule : Mar 2019 – Jun 2021
Project Value : USD 18,500,000
ENERCO RPO TDAE PROCESSING PLANT Service Period : Febr 2020 – Dec 2021
(O&M)
Project Owner : PT Enerco RPO International
Project Value : USD 300,000
Service Period : Jan 2020 – Jun 2021

ENERCO RPO TDAE PROCESSING PLANT


(Pipeline)
Project Owner : PT Enerco RPO International BP TANGGUH LNG PLANT
Project Value : USD 3,200,000 Project Owner : BP p.l.c.
Service Period : May 2018 – Dec 2018 Project Value : USD 15,000,000
Schedule : Nov 2019 – Dec 2022
BATAM PMT for:
- Piping

BALIKPAPAN Direct work for:


BINTUNI - Structure
TANJUNG - Borescope
PRE-FEASIBILITY STUDY ON METHANOL PROJECT
CARAT - Bolt Torque
- Preservation
GRISSIK CORRIDOR FOR RUKUN RAHARJA, TBK - Commissioning
Client : Rukun Raharja
Service Period : July 2020 – Sept 2020
CILEGON
BOJONEGORO
VESSEL AND TANK FABRICATION PMT
Client : PT TIMAS
Project Value : USD 160,000 SUMBA
Schedule : Jun 2021 – Dec 2021

PERTAMINA JTB INSTRUMENT, ELECTRICAL,


PERTAMINA JTB EVAPORATOR & CRYSTALISATION UNIT - DJARUM GROUP
MECHANICAL AND GATHERING PIPELINE WORK
PMT MURIA MANIS SUGAR PLANT – PMT
PACKAGE
Main Contractor : Rekind-JGC JO Project Owner : PT Muria Sumba Manis
Main Contractor : Rekind-JGC JO
Project Value : USD 2,500,000 Project Value : USD 4,200,000
Project Value : USD 3,000,000
Schedule : Nov 2019 – Nov 2020 Schedule : Feb 2020 – Dec 2021
Schedule : Jan 2021 – Sept 2021
OUR
P R O J E C T M A N A G E M E N T S E RV I C E S
P O RT F O L I O S
PERTAMINA RDMP RU V WATER TREATMENT PLANT
LOCAL PARTNER FOR FOREIGN SUPPLIER COMPANY (slide 1/2)
Project Value Capacity Schedule Location

USD 18,500,000 3,500 MTPH February 2020 – July 2021 Balikpapan, Indonesia
Scope Stakeholder
Rapid assists the project owner to acquire an improved capacity and quality PT Pertamina
for their desalination plant with a better price. This is achievable by
Owner
engineering and designing the suitable technology and process to comply
with the standard of our client. We then assist the project owner until the
delivery of the technology on-site to ensure perfect delivery and quality to RDMP JO
our client. Main Contractor
Scope:
• Fabricate and supply Sea Water Desalination, Reverse Osmosis, De- Aquatech SA – Rapid Infrastruktur Indonesia JO
mineralization and Re-mineralization system Engineering, Fabrication, and Supply Vendor
• Specialized in carbon steel, super duplex stainless steel, glass reinforced
epoxy (GRE), and fiber-reinforced plastic materials
• Project schedule control Subcontractors
• Technical assist in project execution design phase
PERTAMINA RDMP RU V WATER TREATMENT PLANT
LOCAL PARTNER FOR FOREIGN SUPPLIER COMPANY (slide 2/2)

FABRICATED ITEMS

PIPE RACK GLASS


SWRO, BWRO, DOSING PACKAGE
FABRICATION REINFORCED
ERD • Consists of 48 skid package
EPOXY
• 12 hypo dosing and poly dosing
Sea Water Desalination, units, including pumps Fabricating and installing frame,
Brackish Water Reverse • 7 CS- SS Vessels weighing 12.4 rack, and piping for the skids This facility’s piping system
Osmosis, De-mineralization Tonnes, using SA 516 Gr 70 and SA and the whole system, also its also using GRE pipe due to its
and Re-mineralization System, 240 Gr. 316 instruments such as valves. Also properties that can withstand
and Energy Recovery Device • Remineralization Vessel weighing uses special grade corrosive high temperature, excellent
using the most current and 43.3 Tonnes using SA 240 Gr. 316 resistance Super Duplex chemical and corrosion
reliable technology. • Sludge Thickener Stainless Steel resistance, also able to handle
seawater.
PERTAMINA RDMP RU V CRUDE OIL TANK COMPLEX -
PMT
Project Value Capacity Schedule Location

USD 8,000,000 15,000 MT (3 tanks) March 2019 – June 2021 Balikpapan, Indonesia
Scope Stakeholder

Rapid provides consulting service to our client starting from proposal onto project PT Pertamina (Persero) RU V
execution phase. We provide technical and commercial assistance to ensure the project
runs without any issue on technical execution and project cashflow. Owner

We help top level management in decision making to avoid delays in project execution,
since the pandemic hit our project site in the middle of our working schedule. RDMP JO
Main Contractor
Scope:
• Project management for 3882 Tonnes of crude oil tank construction
• Plan project execution for additional complementary scope such as; insulation
clip support, walkway and platform, painting, and hydrotest PT Cahaya Hidup Primakarya
• Cost and project schedule control Contractor

PT Rapid Infrastruktur Indonesia


Contractor
OUTSIDE VIEW OF CRUDE OIL TANK INSIDE VIEW OF CRUDE OIL TANK
DJARUM GROUP MURIA SUMBA MANIS SUGAR PLANT -
PMT Project Value Capacity Schedule Location

USD 4,000,000 6,000 TCD Feb 2020 – Dec 2021 Sumba, Indonesia
Scope Stakeholder
Developing one of the major investments from our client which is 6000-12000 TCD sugar milling and
refining plant. This project is in need for a high-performing management team. Therefore, Rapid
collaborate with Muria Sumba Manis team to lead, manage, review, rearrange agreements and scope PT Muria Sumba Manis
of works between sub-contractors, vendors, and technology licensor. We function as project integrator
across discipline and stakeholders. Owner

We achieved 200% construction progress after the implementation of our project management system, PT Rapid Infrastruktur Indonesia
bringing the project closer to achieve the targeted schedule. Project Integrator
Project Management Services
• Project status and progress evaluation
• Commissioning and Start-up assist
• Contract settlement process Subcontractors
• Crash program design to speed up the project • PT Swadaya Graha
• Refinery sugar is available to be processed from sugar cane and raw sugar • PT Tatamulia Nusanra indah
• PT Weltes Energi Nusantara
• Construct and commissioning boiler STG powered with bagasse and coal
• PT Syamsir Karya Pertama
• Design, construct and commissioning coal handling system, raw sugar handling system, and • Statec Binder GmbH.
bagging system
Engineering and Procurement Vendor
• Isgec Heavy Engineering Ltd.
PROCESS EQUIPMENTS VESSELS AND PIPING

POWER PLANT AREA WATER TREATMENT PROCESS BOILER PIPING


POND
ENERCO RPO TDAE PROCESSING PLANT - PMT
Project Capitalization Capacity Schedule Location

USD 1,500,000 180,000 MTPY May 2018 – June 2021 Batam, Indonesia

Scope Challenges Stakeholder


Enerco is the pioneer of TDAE plant in Indonesia
with its own unique technology. This brings • Initial schedule from October 2017 - April 2019
additional challenge as we have no predecessor in PT Enerco RPO International
(18M)
constructing the TDAE Plant.
• Status as per April 2018: progress 26% (lag Owner
We managed to complete the construction of the 16%)
plant on-time, on-budget, and proudly exceeds the • Dispute with sub-contractors in term of scope of PT Rapid Infrastruktur Indonesia
designed performance. work and budget. Contractor
• Assisting CESCO for chemical cleaning
Project Management and Consultancy
Services Result of hard-work PT Energy Management Indonesia
• Status and progress project evaluation Contractor
• Bidding process
• Commissioning and start-up phase assist • LTI Zero
• Technical marketing assist • Mechanical Completion achieved on end March
• Regular maintenance lead 2019
PT Timas
Subcontractor
BIRD EYE VIEW OF ENERCO RPO PLANT TOPSIDE VIEW OF ENERCO RPO PLANT
PIPE PAINTING CLOSER VIEW OF THE PLANT
PERTAMINA JTB EVAPORATOR & CRYSTALISATION UNIT
PMT
Project Value Capacity Schedule Location

USD 2,500,000 52,000 MTPY Nov 2019 - Nov 2020 Bojonegoro, Indonesia
Scope Stakeholder

PT Pertamina EP Cepu
Rapid assists our clients to provide a solution to semi-solid waste
treatment in Pertamina JTB Gas Processing Plant. Owner

Using the technology provided & engineered by Rapid, our client could
easily dispose their waste in dry-solid form, complying with national
regulation.
PT Rapid Infrastruktur Indonesia
Contractor
Project Management and Consultancy Services
• Technical and commercial assist for vendor in since bidding phase PT Energy Management Indonesia
• Risk matrix analysis Contractor
• Cost control
• Provide a cutting-edge engineering solution
• Project schedule control
• Technical assist in project execution design phase Alfa Laval Corporation
Fabricator
OUR
CONSTRUCTION
P O RT F O L I O S
ENERCO RPO TDAE PROCESSING PLANT - Construction
Project Value Pipeline Constructed Schedule Location

12 km
USD 3,200,000 May 2018 – Dec 2018 Batam, Indonesia
17,432 DI
Scope Pipeline Details Stakeholder

Pipeline Construction
• Constructing 17.432 Dia-inch carbon steel pipeline from Rubber
Processing Plant to Jetty
PT Enerco RPO International
• Working on Horizontal Directional Drilling (HDD) on the
underground pipeline Owner
• Installing pipe sleeper on the surface pipeline • 12“ Pipeline DAE 3 km PT Rapid Infrastruktur Indonesia
Mechanical Works • 12” Pipeline TDAE 3 km Contractor
• Installation of 4,000 T of tanks and equipment
• Construction of 9,268 T of Steel Structures • 12” Pipeline HACE 3 km
• 12” Pipeline Fire Water 3 km
Piping Works
• 150,500 Dia-in of CS, SS, duplex, P22 pipe materials

PT Citra Tubindo Engineering


Electrical Works Subcontractor
• Installation of 567 points of i/o
PIPELINE TO JETTY PIPELINE PIPELINE

ENERCO JETTY ANOTHER LOOK OF ENERCO JETTY FIRE WATER, DAE, TDAE, AND HACE
JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE (slide
1/3)
Project Value Work Volume Schedule Location

6.79 Km
USD 3,000,000 January 2021 – September 2021 Bojonegoro, Indonesia
9,397 DI
Scope Stakeholder
Rapid is responsible to manage pipeline works, starting from site PT Pertamina EP Cepu
preparation onto commissioning. We employ high-performing project
management team to tackle any technical and social issue which may arise Owner
in executing this project.

We deliver by collaborating with our partners on electrical and


instrumentation works, ensuring perfect quality of works to project owner. Rekind-JGC JO
Main Contractor
Scope:
• Site Preparation and Civil Work
• Pipeline Works
• River & Road Crossing Works
• Pre-commissioning & Testing PT Bojonegoro Bangun Sarana
• Mechanical Installation Contractor
• Electrical & Instrument Works
PT Rapid Infrastruktur Indonesia
Contractor
JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE (slide
2/3)

We’re working on this project from Gathering Pipeline consists of


site preparation 1.53 km 20” Pipeline
until
5.26 km 18” Pipeline
With total
pre-commissioning 9,397 DI

SPECIFICATION HIGHLIGHTS
Coated with
3-Layer Using rare material

Polypropylene INCOLOY 825 Welded with both


That’s easier to fabricate, and more
Coating corrosion resistant and heat resistant GTAW and SMAW
than carbon steel
easier to fabricate, and more corrosion
resistant and heat resistant than carbon
steel
JTB INSTRUMENT, ELECTRICAL, MECHANICAL AND GATHERING PIPELINE WORK PACKAGE (slide
3/3)

Electrical Works Mechanical Works


• 17,60 km FO Cable size 48C • 47 pcs Spool Bolting
• 9,20 km Power Cable 3C-95 mm2 • 525 EA of Valves (Gate, Ball,
• 5,12 km Power Cable 3C-70 mm2 Globe, Check, DBB, Control
• Cathodic Protection installed on Valves) sizes ranging from ½” up
the pipeline to prevent rust and to 18”
corrotions • 3 Pig signal
PIPE NEAR THE FACILITY

PIPE STRINGING PIPE LINEUP PIPE LOWERING


WELD RESULTS

WELDING PREP

PIPE WELDING WELD INSPECTION GTAW WELD


BP TANGGUH LNG PLANT- Piping
Project Value Work Volume Schedule Location

USD 900,000 15,000 DI 15 November 2019 - 31 May 2020 Papua, Indonesia

Scope of Work Stakeholder


Rapid was given the responsibility to lead the project
management on LNG cold section piping work, to BP P.L.C
evaluate monthly progress and speed up the
Owner
construction to achieve targeted schedule.

We review and rearrange project execution plan for


direct and indirect manpower to increase productivity Chiyoda-Saipem-Tripatra-Suluh Ardhi
and achieve on-time delivery. Engineering JO
Main Contractor
Scope:
• Progress management
• Material controlling
• Construction supervision PT Rapid Infrastruktur Indonesia
• Manpower supply Contractor
OUR
O P E R AT I O N & M A I N T E N A N C E
P O RT F O L I O S
ENERCO RPO TDAE PROCESSING PLANT
OPERATION & MAINTENANCE

Project Value Capacity Schedule Location

USD 300,000 180,000 MTPY January 2020 – June 2021 Batam, Indonesia
Scope Stakeholder
Rapid supports Enerco TDAE Plant even further after the completion of the
plant,
Supporting operational and maintenance activity to ensure every aspect of
engineered process and mechanical performance runs without any crucial PT Enerco RPO International
issue. Owner

Scope:
• Upgrading and provide improvement for convenience plant operation and
maintenance PT Rapid Infrastruktur Indonesia
• Network of manufacturing facilities and service centers, which provides Contractor
support for operation and maintenance activities
• 24/7 services manpower support to run the plant safely and finish every
job incident free
• Confined space maintenance work
PREPARATION FOR CLEANING COLUMN
HEAT EXCHANGER CLEANING
(CONFINED SPACE)
HEAT EXCHANGER DISASSAMBLING PULLING OUT HE TUBING

HEAT EXCHANGER (HE) WORKERS USING HAZMAT SUIT HEAT EXCHANGER TUBING
DISASSAMBLING TO CLEAN THE HE LIFTED
DJARUM GROUP MURIA SUMBA MANIS SUGAR PLANT
OPERATION AND MAINTENANCE

Capacity Schedule Location

6,000 TCD Feb 2021 – Feb 2022 Sumba, Indonesia

Scope Stakeholder

After the plant has been commissioned and ready to operates, Rapid
Infrastruktur Indonesia ensuring the plat operates optimally by providing
Operation and Maintenance service. We provides engineers and technicians PT Muria Sumba Manis
integrated to client’s operation team on Processing Plant, Power Plant, and Owner
other utility area to assists and to provide professional suggestions for
maintenance to maximize production rate. PT Rapid Infrastruktur Indonesia
Operation and Maintenance Team
Scope:
• Providing experienced engineers to assist client’s daily operation
• Troubleshooting and performing reparation on-site to ensuring production rate
• Standing by 24/7 Preventing production loss and reducing downtime
BOILER SOFT FIRING MONITORING FROM DISTRIBUTED CONTROL SYSTEM

SUGAR CANE MILL MOTORS BOILER 22MW STEAM TURBINE


BP TANGGUH LNG PLANT (slide 1/2)
Project Value Schedule Location

USD 15,000,000 Nov 2019 – present Papua, Indonesia


Scope of Work Stakeholder

BP Tangguh LNG Expansion Project was located in a BP P.L.C


very remote area which makes logistics becomes one Owner
of the main determining factors for the project
success. Therefore, it is essential to avoid re-work and
preserve equipment integrity.
Chiyoda-Saipem-Tripatra-Suluh Ardhi
Engineering JO
Rapid brings additional value by delivering precise
work on our maintenance and support for our client’s Main Contractor
facilities, ensuring no issue will rise once the plant is
fully operational. borescope inspection & bolt
tightening service are some examples of our PT Rapid Infrastruktur Indonesia
supporting services, delivering excellence on our Contractor
client’s assets commissioning phase.
BP TANGGUH LNG PLANT (slide 2/2)

PRESERVATION COMMISSIONING BORESCOPE BOLT TORQUEING


1 January 2020 – 31 January 2021 1 July 2020 – 30 June 2021 7 December 2019 – 31 August 2021 15 November 2019 – 30 November 2020

Scope of Work Scope of Work Scope of Work Scope of Work


• Condition monitoring for valve, • Pipe visual inspection • Pipe inner layer camera-assisted • Flange Management based in
pipe, and instrument devices • Repair recommendation inspection torque standard
• Steel structure erection for Train • Assistance for • Making report of the pipe • Pre-checking flange, bolt, and
3 and brownfield area commissioning activity inspection gasket condition
• Flange Management based in • Recommending action plan • Tightening bolt in a sequence
torque standard based on the inspection using a minimum of three
torquing passes and the
maximum bolt stress as defined
in the reference documents
BORESCOPE MONITORING SETTING UP BORESCOPE MONITOR
BP PLC TANGGUH SITE BORESCOPE PREPARATION
SAFETY AWARD FOR RAPID INSPECTING PIPE THROUGH
INFRASTRUKTUR WORKERS MONITOR USING FLEXIBLE
FROM CSTS JO BORESCOPE
OUR
P R O J E C T S T U D Y, E N G I N E E R I N G ,
A N D E VA L U AT I O N
P O RT F O L I O S
ENGINEERING SERVICES FOR SUGAR FACTORY 6000 TCD
Project Value Capacity Schedule Location

USD 200,000 6,000 TCD June 2020 – December 2020 Jakarta, Indonesia
Scope Stakeholder

• Detailed engineering design in regards of procurement and PT Muria Sumba Manis


construction phase for process, piping, mechanical, civil, Owner
structure, electrical, instrument and valve criticality
construction
• Design engineering in regards of balance of plant to support
sugar processing plant, such as coal handling, raw sugar
handling, automatic bagging system, and automatic fuel PT Rapid Infrastruktur Indonesia
distribution Engineering Consultant
EVALUATION OF ENERCO TDAE PLANT FEASIBILITY
AT 170,000 MTPY CAPACITY
Project Capitalization Capacity Schedule Location

USD 80,000 180,000 MTPY March 2020 – present Batam, Indonesia


Scope Stakeholder

Rapid collaborates with Institut Teknologi Bandung to conduct an PT Enerco RPO International
evaluation of design capacity of the TDAE Plant in several operational Owner
scenarios.

Our study proves through calculated simulation that an additional


capacity is available for utilization and added value to our client
PT Rapid Infrastruktur Indonesia
Scope: Consultant
Evaluating plant current condition to perform at 170,000 MTPY
Capacity. The evaluation had been done by simulation with process
software such as HYSYS and HTRI. The result of the simulation was PT LAPI ITB
compiled into a comprehensive report Consultant
PRE-FEASIBILITY STUDY ON METHANOL PROJECT IN GRISSIK
CORRIDOR FOR RUKUN RAHARJA Tbk.
Schedule Location

July 2020 - September 2020 Tanjung Carat, Indonesia


Scope Stakeholder
Rapid collaborates with Institut Teknologi Bandung to evaluate the feasibility of a high-
capacity methanol plant business plan prepared by Rukun Raharja Tbk.

We provided detailed technical opinion on preferred plant capacity, compatible technology,


suitable project location, and appropriate methods to improve project economics.
Rukun Raharja Tbk.
Scope: Owner
• Condition and Petrochemical Industry Mapping Study in Indonesia
• Study of raw material
• Market and factory capacity study
• Technology review PT Rapid Infrastruktur Indonesia
• Data study, analysis, and calculation
• Methanol transportation and storage study
Consultant
• Risk analysis and study business models
• Regulatory and policy review
CONTACT US
E-mail:
geraldo.sirait@rapidinfrastruktur.com
marketing@rapidinfrastruktur.com

Phone:
+62 21-27819899

Talavera Office Park,


Lt. 8 (Marketing)
Lt. 12 (Operation)

Address:
Jl T.B. Simatupang No. 23, RT.3/RW.1, Cilandak Barat,
DKI Jakarta 12430

Website:
www.rapidinfrastruktur.com
THANK YOU