Project Scheduling: Networks, Duration Estimation, and Critical Path
Project Scheduling: Networks, Duration Estimation, and Critical Path
NETWORKS, DURATION
ESTIMATION, AND CRITICAL PATH
Chapter 9
C
Copyright ©2016 Pearson Education, Ltd. 9-12
NODE LABELS
(FIGURE 9.3)
When the nature of the work allows for more than one
activity to be accomplished at the same time, these activities
are called concurrent, and parallel project paths are
constructed through the network.
Copyright ©2016 Pearson Education, Ltd. 9-15
MERGE ACTIVITY
(FIGURE 9.7)
Experience
Expert opinion
Mathematical derivation – Beta distribution
Most likely (m) 2
2 ba
Most pessimistic (b) Activity Variance =s
Most optimistic (a) 6
a 4m b
Activity Duration = TE
6
9-19
Copyright ©2016 Pearson Education, Ltd. 20
SYMMETRICAL (NORMAL)
DISTRIBUTION FOR ACTIVITY
DURATION ESTIMATION
(FIGURE 9.14)
A Contract signing 3 4 11
B Questionnaire design 2 5 8
C Target market ID 3 6 9
D Survey sample 8 12 20
E Develop presentation 3 5 12
F Analyze results 2 4 7
G Demographic analysis 6 9 14
H Presentation to client 1 2 4
Aktivite Öncüller
a -
b -
c a
d b
e b
f c,d
ÖRNEK BİR NETWORK ÇİZİMİ
AON
Node Notation:
İLERİYE DEVRETME (FORWARD
PASS)
GERİYE DEVRETME
(BACKWARD PASS)
Ağ üzerindeki tüm etkinliklerin tamamlanmamış olanları için geç
bitiş ve geç başlangıç tarihlerinin hesaplanması. Projenin
tamamlanma tarihinden başlayıp ağ üzerinde geriye doğru
gidilerek belirlenir.
En geç süreleri hesaplar (LST ve LFT)
LFT Kuralı:
Bir öncül yalnızca bir aktivitenin öncülüyse
LFT = Ardılın LST
Bir aktivite birden fazla aktivitenin öncülüyse
LFT = Minimum(tüm ardılların LST)
LST Kuralı:
LST = LFT – aktivite süresi
Geriye Devretme (Backward Pass)