DRILL STEM TEST
Definition:

A DST is a temporary well completion Where


drillpipe/tubing in combination with downhole tools is used.
The formation is then allowed to flow under control. up a
test string,  filling the string "it could be tubing or drill
pipe" with formation fluid. The fluid is then diverted at
surface and constantly checked. 
OBEJECTIVES OF DST

• Determine types and characteristics of products fluids


• Determine well potential ( production )
• Determine characteristics of reservoir
-Permeability
-Capacity of reservoir
-pressure and temperature
-Skin
1. S = 0 ; normal flow
2. S> 0 ; reservoir is damaged
3. S< 0 ; reservoir stimulated
TYPES OF DST
EQUIPMENTS USED
Bottom equipments
Surface equipments
FLOW HEAD

Lifting sub

Swab valve

Kill line valve actuator

Kill line Flow line

swivel

Master valve
EMERGENCY SHUT DOWN
CHOCK MANIFOLD
STORAGE TANK SEPARATOR
Typical DST sequences:

The typical drill stem test will be split into :

1- Run in hole DST string, make up and test all surface equipment.
2- Opening of down hole tester valve for PRE-FLOW.
3- Initial shut-in and recording of the initial reservoir pressure.
4- Opening the tester valve for second flow period (Main flow).
5- Final shut in and recording of pressure.
6- kill the well again by hydrostatic pressure of Mud.
7- Unset Packer, lay down surface equipment and Pull out of the hole.
8- Retrieve Recorders and interpretation of data.
Typical DST sequences

Annulus pressure (Ph) DP or Tubing

Cushion pressure (Pc)

Formation pressure (Pf)

Pc
P c < P f < Ph Tester Valve
Ph
Packer

Pf

13
RIH DST & Setting Packer

Pressure & Temp Recorder

14
Open tester valve

15
Well Flowing

16
well Shut-in & record of pressure build-up

17
Opening reverse circulation valve

T Reversing Valve

18
Reverse Circulation

19
Unset Packer

20
POOH DST Equipment

21
A typical pressure response measured during a DST

C K L
B
G
I J

F
H
A E M

22
An Example pressure response measured during a DST

OMLZ 872 TP 199 Branchement le 25/04/07 a 13H32


5000 120

4000 100

3000 80

2000 60

1000 40

psig 0 20
deg C
0 50 100 150
Hours