This document describes two methods for estimating quantities in construction:
1. The long wall-short wall method which involves calculating centerline lengths of walls and adding half widths to determine overall lengths. Quantities are calculated by multiplying lengths by depths and breadths.
2. The centerline method where measurements are taken to the center of walls and thicknesses are added to determine centerline lengths. Quantities are estimated based on centerline lengths and item dimensions.
The document provides an example calculation using the long wall-short wall method to estimate brickwork quantities for a building foundation with varying wall thicknesses. Total estimated brickwork quantity is 13.488 cubic meters.
This document describes two methods for estimating quantities in construction:
1. The long wall-short wall method which involves calculating centerline lengths of walls and adding half widths to determine overall lengths. Quantities are calculated by multiplying lengths by depths and breadths.
2. The centerline method where measurements are taken to the center of walls and thicknesses are added to determine centerline lengths. Quantities are estimated based on centerline lengths and item dimensions.
The document provides an example calculation using the long wall-short wall method to estimate brickwork quantities for a building foundation with varying wall thicknesses. Total estimated brickwork quantity is 13.488 cubic meters.
This document describes two methods for estimating quantities in construction:
1. The long wall-short wall method which involves calculating centerline lengths of walls and adding half widths to determine overall lengths. Quantities are calculated by multiplying lengths by depths and breadths.
2. The centerline method where measurements are taken to the center of walls and thicknesses are added to determine centerline lengths. Quantities are estimated based on centerline lengths and item dimensions.
The document provides an example calculation using the long wall-short wall method to estimate brickwork quantities for a building foundation with varying wall thicknesses. Total estimated brickwork quantity is 13.488 cubic meters.
IN LONG WALL –THE LENGTH OF THE ROOM IS INTENDED TO BE LONG WALL AND THE WALL PERP. TO THE LONG WALL IS STATED TO BE A SHORT WALL. CALCULATE FIRST THE CENTERLINE LENGTHS OF THE WALLS. LENGTH OF THE LONG WALL, (OUT TO OUT) = CENTRE LINE LENGTH + HALF BREADTH AT EACH END TO ITS CENTERLINE LENGTH. LENGTH OF SHORT WALL = CENTRE LINE LENTH - HALF BREADTH FROM EACH END THE LENGTH OF THE SHORT WALL USUALLY INCREASES FROM EARTHWORK TO BRICKWORK IN SUPERSTRUCTURE WHILE THE LONG WALL DECREASES. LENGTHS ARE MULTIPLIED BY DEPTH AND BREADTH TO GET QUANTITIES. ADD QUANTITIES FOR EACH VARYING DIMENSION AND SUM UP ALL TO GET TOTAL QUANTITY. 2 . CENTER LINE METHOD. IN CENTER LINE METHOD OF ESTIMATION, MEASUREMENTS OF THE WALL ARE TAKEN UP-TO CENTER. INTERNAL MEASUREMENTS ARE GENERALLY TAKEN. THE THICKNESS OF HALF WALL FROM ONE SIDE AND THICKNESS OF HALF WALL FROM ANOTHER SIDE IN INTERNAL MEASUREMENTS ARE ADDED IN ORDER TO DETERMINE THE LENGTH OF CENTER LINE OF ROOM WALLS. IF ALL OF THE STEPS ARE SYMMETRICAL IN CROSS-SECTION OF THE WALL, THEN THE TOTAL LENGTH OF THE CENTER LINE WILL BE UNIFORM FOR ALL ITEMS OF THE WALL. IF THESE STEPS ARE NOT SYMMETRICAL, THEN THE LENGTH WILL BE DETERMINED SEPARATELY FOR EACH STEP. DESPITE, IF THE DESIGN OF WALLS IS SAME THROUGHOUT IN BUILDING THEN IT IS QUITE EASY TO FIND THE LENGTH OF CENTER LINE. CENTER LINE METHOD IS EMPLOYED EASILY IN CIRCULAR AND POLYGONAL SHAPED BUILDINGS. DESPITE, THIS METHOD IS ALSO SUITABLE TO USE IN SMALL BUILDINGS WITH FEW ROOMS. STEP-1 : CALCULATE CENTRELINE DISTANCE OF WALLS ; A- CENTRE LINE DISTANCE OF LONG WALL FROM DRAWINGS; 5.00 M + 0.23 M = 5.23 M B- CENTRELINE DISTANCE OF SHORT WALL ; 4.00 M + 0.23 M= 4.23 M STEP-2 : CALCULATE THE LENGTH OF SHORT AND LONG WALLS ; A. LENGTH OF LONG WALL = CENTRE LINE DISTANCE OF LONG WALL + ½ OF WIDTH ON ONE SIDE + ½ OF WIDTH ON THE OTHER SIDE = 5.230 M + 0.115 m + 0.115 m = 5.46 m B. LENGTH OF SHORT WALL = CENTRE TO CENTRE LINE OF SHORT WALL – ½ OF WIDTH OF WALL ON ONE SIDE – ½ OF WIDTH OF WALL ON THE OTHER SIDE = 4.23- 0.230/2 – 0.230/2 = 4.00 M STEP-3 : MULTIPLY LENGTHS WITH DEPTH AND BREADTH OF ITEMS OF WORK ; 1. CALCULATION 0F QUANTITY FOR BRICKWORK IN FOUNDATION :
(I) 230 MM THICK BRICK WORK :
WIDTH = 0.230 M , DEPTH = 0.45 M QUATITY OF BRICKWORK = 2(5.46 + 4.00) X .45X0.23 = 1.958 CU M (II) 345 MM BRICK WORK : LONG WALL ; LENGTH = 5.23 + 0.345 =5.575 M ; WIDTH = .345 M ; DEPTH = 0.45 M; SHORT WALL ; LENGTH = 4.23 -0.345 =3.885 M ; WIDTH = 0.345 M ; DEPTH = 0.45 M; QUANTITY OF BRICK WORK = 2( 5.575 + 3.885) X 0.450 X 0.345 = 2.94 CU M (III) 460 MM BRICK WORK : LENGTH OF LONG WALL = 5.23 + 0.46 = 5.69 M LENGTH OF SHORTWALL= 4.23-0.46=3.77 M WIDTH= 0.46 M ; DEPTH = 0.45 M QUANTITY OF BRICKWORK = 2( 5.69 + 3.77) X 0.450 X0.460 = 3.813 CU M (IV) 575 MM BRICKWORK : QUANTITY OF BRICKWORK =2 ( 5.805 + 3.655 ) X 0.45 X 0.575 = 4.78 CU M; TOTAL QUANTITY OF BW IN FOUNDATION = 1.958 + 2.94 + 3.813 + 4.777 = 13.488 CU M