CONSTRUCTION MATERIALS
MANAGEMENT
(COTM 5202)
06/25/2022
1. Introduction
3
Definition of Materials
Materials can be defined as the physical materials that are
purchased and used to produce the final product. In other
words, materials are the parts used to produce the final product.
Classification of Materials
Construction materials can be classified into different
categories depending on their fabrication and in the way that
they can be handled on site.
06/25/2022
Cont…
4
06/25/2022
Example on Classification of Materials
6
06/25/2022
Cont…
8
cables.
ABC Analysis/Clasification
Is a basic analytical management tool
It enables management to place efforts where the
results will be greatest.
This technique tries to analyze the distribution of any
characteristic by money value of importance in order
to determine its priority.
06/25/2022
Cont…
10
Applications of this
technique
Inspection
Inventory Control
Store-keeping
Criticality of items Verification of bills.
Obsolete stock control
Purchase orders
Receipt of materials
06/25/2022
Steps for classifying the items into A,B,C
categories.
12
06/25/2022
Cont…
14
06/25/2022
Cont..
15
A‟ ITEMS
Small in number, but consume
large amount of resources
B‟ ITEMs
Intermediate
C‟ ITEMS
Larger in number, but consume
lesser amount of resources
06/25/2022
F-S-N Classification
16
06/25/2022
What is Materials Management ?
17
06/25/2022
Cont…
18
06/25/2022
Cont…
19
06/25/2022
Definition of Materials Management
20
06/25/2022
Cont…
21
06/25/2022
Planning
22
06/25/2022
Procurement
23
06/25/2022
Cont.
24
06/25/2022
Logistics
25
06/25/2022
Handling
26
06/25/2022
Cont.
27
06/25/2022
Stock and Waste Control
28
06/25/2022
Benefit of Materials Management
30
CONTENTS
1. What is MRP?
2. Example on MRP
4. MRP Report
06/25/2022
Planning (Reminder from previous lecture)
32
06/25/2022
Cont.
35
06/25/2022
2. Example of MRP Logic and Product Structure Tree
36
06/25/2022
37
Day: 1 2 3 4 5 6 7 8 9 10
A Required 50
Order Placement 50
LT = 1 day
06/25/2022
Next, we need to start scheduling the components that make up “A”. In
the case of component “B” we need 4 B’s for each A. Since we need 50
A’s, that means 200 B’s. And again, we back the schedule up for the
necessary 2 days of lead time.
Day: 1 2 3 4 5 6 7 8 9 10
A Required 50
Order Placement 50
B Required 20 200
Order Placement 20 200
LT = 2 Spares
A 4x50=200
B(4) C(2)
Finally, repeating the process for all components, we have the final
materials requirements plan:
Day: 1 2 3 4 5 6 7 8 9 10
A Required 50
LT=1 Order Placement 50
B Required 20 200
LT=2 Order Placement 20 200
C Required 100
LT=1 Order Placement 100
D Required 55 400 300
LT=3 Order Placement 55 400 300
E Required 20 200
LT=4 Order Placement 20 200
Part D: Day 6
40 + 15 spares
40 06/25/2022
3. Reorder Point Planning
41
06/25/2022
43
06/25/2022
45
06/25/2022
46