A Products Code A-104

B Network solution & S/W Date 2014-01-14

TECHNICAL
C Installation materials
D Marketing materials Publisher SAC Cycle Logic Team
E PDB E-mail brian.yoon@lge.com

BULLETIN
F Manual(SVC,Install,Owners)
Product Multi V Sync4
G Competitors & products
H Installation&Field engineering 1 PM,SE 2 MKT
J Regulation & Standard Distribute
3 CAC Team 4 R&D
K Others

Setting Zoning Control and Master Indoor Unit for Multi V 4 Heat Recovery
Applied Date 2014-01-11 ~

Summary

This bulletin describes how to set Zoning Control and set up Master Indoor Unit
for Multi V 4 Heat Recovery.

Information

■ Zoning Control installation for Multi V 4 Heat recovery


- When installing zoning, operation mode of zoning indoor units will be followed by the former
indoor unit mode.
ex) At first time, Indoor unit #2 turns on to cooling mode and then turn on Indoor unit #3 .
Indoor unit #3 will be operated in cooling mode.
1
Zoning
HR 2

Box
1 2

■ Setting Zoning Control Master indoor unit


- After installing zoning and determining Master indoor unit, operation mode of all indoor units
in the same zone will be followed by Master indoor unit.
ex) If Indoor unit #2 is designated as Master indoor unit, operation mode of Indoor unit #3 will
be followed by unit #2.
- To apply Zoning control Master Indoor unit, check the program version of the outdoor unit.
It requires version 9.0 or higher.

■ Applied Version
- Ver.9 : “ySync4_main_SAA36524809_Ver9.0_B50C_140107.mot”
• Appendix : Setting Master Indoor Unit at the HR Unit PCB

Cover page of installation manual

Page of assigning the Master Indoor Unit at the


HR Unit PCB (English page 88)
• Appendix : Setting the Master Indoor Unit at the Outdoor Unit PCB
Step 1) Stop system operation by using the ‘OFF’ button of the remote controller of the indoor unit.
Step 2) Turn on DIP switch #5 like below Fig. 1 to start option setting mode.
Step 3) Push ‘◀’ button and ‘▶’ button to display ‘Idu’ on the 7-segment and then confirm with red button.
Step 4) Push ‘◀’ button and ‘▶’ button to display ‘Id7’ on the 7-segment and then confirm with red button.
Step 5) Assign HR Unit number and Pipe number like below :
• 7-Segment Display : [ x ] [ y ] [ _ ] [ _ ]
where [ _ ] : empty , [ x ] : HR Unit number , [ y ] : Pipe number
• To change HR Unit number : Push ‘◀ ‘ button.
-Note 1 : Range of display number is from 1 to detect number of HR Unit.
-Note 2 : Two-digit HR Unit number is displayed as A(=10th HR Unit), B(=11st HR Unit),
C(=12nd HR Unit), … , F(=15th HR Unit), G(=16th HR Unit)
• To change Pipe Number : Push ‘▶’ button.
- Note : Range of display number is from 1 to assigned number by the HR Unit DIP
switch
Step 6) To confirm and go to next step, push ‘●’ button.
Step 7) Assign the Master Indoor Unit number like below :
• 7-Segment Display : [ _ ] [ _ ] [ x ] [ y ]
where [ _ ] : empty , [ x ] : Second digit of the Indoor Unit number, [ y ] : First digit of the
Indoor Uni number
• To change Indoor Unit number : Push ‘◀’ button and ‘▶’ button.
-Note : Displayed Indoor Unit numbers are connected to the Pipe ot the HR Unit which
is assigned from Step 5.
Step 8) To confirm and go to next step, push ‘●’ button.
Step 9) Final decision which is determined on the Step 8 is displayed. Now reset the system.

Fig. 1
DIP switch and Button on the
Outdoor Unit PCB
1.Main PCB OnBoarding

1.1 Onboarding equipment 1.2 Procedure for Onboarding


1. Computer 1. PC  USB To RS232 Cable  JIG Box 
2. USB 2.0 To R232 Cable Connect Cable  Connect in order
3. Jig Box
4. Main Controller Connect Cable
5. Short key

Onboarding port

2. Connect the Short Key


3. Click the Reset button and Check that LED
is off
4. Execute Onboarding program
5. Remove the Short key after finishing
Onboarding
6. Click the Reset button and Check that LED
flashes
1.3 Setup file for Onboarding

There are two files for Onboarding as below

- setup_fdf4.9.exe
Setup file for Onboarding program
If this file does not setup, Onboarding is impossible

- Cycle.fpf4
Exe file for Cycle PCB Onboarding S/W
If setup_fdt4.9.exe file does not setup, it is unable to use.

1.4 How to setup and operate the program

1.4.1 FDT 4.90 setup


1.5 Setup file for LGMV7

There are two files for LGMV7 as below


1.6 Setup PRCTIL0(IH0)
1.7 Execute the Onboarding program
3. Connect the LGMV7 and Setting the Multi V Ⅳ

2. Check the Device R5F564112 and Set the


port connected

4. Check Comm. Ok and Close the LGMV7


5. Set the Onboarding file(.mot) 1.8 Corrective measure for failing in Onboarding

1. In case of Boot failed

Check connection of
Onboarding Cable
Check connection of the
Short key and LED is off
Check connection of the
power

6. Program Flash click


2. In case of Verification Failed

Check Device(cycle PCB :


R5F64112)
Execute cycle.fpf4 and Execute
Onboarding

7. Onboarding is finishing 3. In case of Error while


(Check ‘CRC Check OK’) opening the port

In case of COM Port is


using in other programs

4. In case LED is off after Onboarding


Press the Reset button after removing short
key

5. In case LED is off after removing the Short key


Retry Onboarding