CIVIL & STRUCTURES

SCOPE SUMMARY
• Base oil Tank farm
• Additive Tank farm

7/14/22 Strictly Confidential 1


CIVIL & STRUCTURES
WEIGHING SCALE PIPE RACKS
• 1 No. of Pit type Weigh Scale of Size 10m (L) x 4m (W) with ramp on both • No. of Pipe racks – 10 Nos (Total Length = 711m)
sides shall be provided • PR-01 - 140m (L) x 2m (W) x 4m (H) - inside Finished product tank farm
• Weighing Scale shall be supported on Shallow foundation. • PR-02 - 27m (L) x 3m (W) x 8m (H) - inside Additive tank farm
• PR-03- 132m (L) x 3m (W) x 7.1m (H) - inside Additive tank farm
• PR-04 - 9m (L) x 5m (W) x 5.9m (H) - inside Additive tank farm
• PR-05 - 79m (L) x 3m (W) x 10m (H) - to filling unit from Tepong
PLATFORMS AND CROSSOVERS • PR-06 - 83m (L) x 3m (W) x 6m (H) - inside base oil tank farm
• PR-07 – 95.5m (L) x 4m (W) x 6m (H) - inside filling and packing unit
• Operating Platform for valve • PR-08 – 16m (L) x 4m (W) x 6m (H) - inside Base oil tank farm
• Pipe Cross over platforms • PR-09 – 23.5m (L) x 5m (W) x 10m (H) - inside Blending unit
• All Platforms shall be supported on Shallow Foundation • PR-10– 104.6m (L) x 6m (W) x 7.1m (H) - inside Blending unit
• All Pipe rack shall be supported on Pile Foundation.

PIPE BRIDGES
• No. of Pipe Bridges – 7 Nos (Total Length = 85m)
PB-01 - 11.5m (L) x 5m (W) x 10m (H) – Below Additive TF /Hot Oil
PIPE SLEEPERS AND PIPE SUPPORTS

• PB-02 - 9m (L) x 4m (W) x 6m (H) – Above Base oil TF
• PB-03 - 10m (L) x 6m (W) x 7.1m (H)- Near Blending unit to B11 • Pipe Sleepers and pipe supports for Product Pipelines shall be supported
• PB-04 - 27m (L) x 3m (W) x 8m (H) – Above Additive TF on Shallow Foundation
• PB-05 - 10m (L) x 3m (W) x 8m (H) – Below Additive TF • Pipe Sleepers for Truck Loading Pipelines from VM and Utility Pipes shall
• PB-06 - 9m (L) x 3m (W) x 6m (H) – outside Base oil TF be supported on Shallow Foundation
• PB-07 - 9m (L) x 3m (W) x 6m (H) – outside Base oil TF • Pipe Sleepers for Fire Water Pipe shall be supported on Shallow
• All Pipe Bridge shall be supported on Pile Foundation Foundation

7/14/22 Strictly Confidential 2


CIVIL & STRUCTURES – NEW PRE ENGINEERED BUILDING-
PLAN VIEW

7/14/22 Strictly Confidential 3


CIVIL & STRUCTURES – NEW PRE ENGINEERED BUILDING-
SECTION VIEW

7/14/22 Strictly Confidential 4