VALVE

PUMP

PIG

BLOCKER

AIR
PROXIMITY SWITCH

OPEN / ACTIVE

CLOSED / INACTIVE
AIR/WATER

PRODUCT

Client:
DRAIN Location:
Project:

PASO 0: SISTEMA LISTO I&J


Las tuberías se limpian y secan. Al. JUAN IGLESIAS
01-034 ESPAÑA
Advertencia: Este no es un análisis funcional detallado, sino
una descripción simple de los pasos básicos de un sistema de Drawn by: Date: Drawing Number: Revision:

pigging. JIP A
05/06/2022
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client:
DRAIN Location:
Project:

I&J
PASO 1: PRODUCCIÓN Al. JUAN IGLESIAS
01-031 ESPAÑA
El producto es bombeado al tanque de
almacenamiento. Drawn by: Drawing Number: Revision:

Date: A
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
JIP

05/06/2022
AIR

AIR/WATER

PRODUCT

Client:
DRAIN Location:
Project:

I&J
Al. JUAN IGLESIAS
STEP 2: FIN DE LA PRODUCCION 01-034 ESPAÑA
Se introduce el torpedo en la Drawn by: Date: Drawing Number: Revision:
tubería
JIP 05/06/2022 A
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client:
DRAIN Location:
Project:

I&J
STEP 3: PIGGING Al. JUAN IGLESIAS
El Torpedo es empujado en la 01-034 ESPAÑA

tubería. Drawn by: Date: Drawing Number: Revision:

JIP 05/06/2022 A
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client:
DRAIN Location:
Project:

I&J
STEP 4: FIN DEL PIGGING Al. JUAN IGLESIAS
01-034 ESPAÑA
El torpedo llega a la estación de
recepción. Drawn by: Date: Drawing Number: Revision:

JIP 05/06/2022 A
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client:
DRAIN Location:
Project:

I&J
STEP 5: DEVOLUCIÓN DEL TORPEDO Al. JUAN IGLESIAS
El torpedo es empujado de regreso a la 01-034 ESPAÑA

estación de lanzamiento. Drawn by: Date: Drawing Number: Revision:

JIP 05/03/2022 A
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client:
DRAIN Location:
Project:

I&J
STEP 6: VUELTA TORPEDO Al. JUAN IGLESIAS
01-034 ESPAÑA
El torpedo llega a la estación de lanzamiento.
Sistema listo para CIP/Saneamiento/Esterilización si es Drawn by: Date: Drawing Number: Revision:
necesario JIP 05/06/2022 A
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.