VALVE

PUMP

PIG

BLOCKER

AIR
PROXIMITY SWITCH

OPEN / ACTIVE

CLOSED / INACTIVE
AIR/WATER

PRODUCT

Client: Standard
DRAIN Location:
Project: Standard
Basic FA
I&J for
STEP 0: SYSTEM READY Al. Jana Pawla pigging
61
01-031 Warsaw, Poland
system
Pipes are cleaned and dry
Warning: This is not a detailed Functional Analysis but a simple Drawn by: Date: Drawing Number: Revision:

description of the basic steps of a pigging system JLC 05/03/2014 FA-Standard-00 A


This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client: Standard
DRAIN Location:
Project: Standard
Basic FA
I&J for
Al. Jana Pawla pigging
61
STEP 1: PRODUCTION 01-031 Warsaw, Poland
system
The product is pumped to the storage tank Drawn by: Date: Drawing Number: Revision:

JLC 05/03/2014 FA-Standard-01 A


This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client: Standard
DRAIN Location:
Project: Standard
Basic FA
I&J for
Al. Jana Pawla pigging
61
STEP 2: END OF PRODUCTION 01-031 Warsaw, Poland
system
The pig is introduced in the pipe Drawn by: Date: Drawing Number: Revision:

JLC 05/03/2014 FA-Standard-02 A


This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client: Standard
DRAIN Location:
Project: Standard
Basic FA
I&J for
Al. Jana Pawla pigging
61
STEP 3: PIGGING 01-031 Warsaw, Poland
system
The pig is pushed in the pipe Drawn by: Date: Drawing Number: Revision:

JLC 05/03/2014 FA-Standard-03 A


This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client: Standard
DRAIN Location:
Project: Standard
Basic FA
I&J for
Al. Jana Pawla pigging
61
STEP 4: END OF PIGGING 01-031 Warsaw, Poland
system
The pig reaches receiving station Drawn by: Date: Drawing Number: Revision:

JLC 05/03/2014 FA-Standard-04 A


This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client: Standard
DRAIN Location:
Project: Standard
Basic FA
I&J for
Al. Jana Pawla pigging
61
STEP 5: PIG RETURN 01-031 Warsaw, Poland
system
The pig is pushed back to launching station Drawn by: Date: Drawing Number: Revision:

JLC 05/03/2014 FA-Standard-05 A


This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.
AIR

AIR/WATER

PRODUCT

Client: Standard
DRAIN Location:
Project: Standard
Basic FA
I&J for
Al. Jana Pawla pigging
61
STEP 6: PIG BACK 01-031 Warsaw, Poland
system
The pig reaches launching station Drawn by: Date: Drawing Number: Revision:
System ready for CIP/Sanitation/Sterilisation if required
JLC 05/03/2014 FA-Standard-06 A
This drawing is our exclusive property and may not without our consent be reproduced or communicated to a third party.