Professional Documents
Culture Documents
Quality Control & Quality Assurance in National Highways
Quality Control & Quality Assurance in National Highways
Quality Control & Quality Assurance in National Highways
Assurance in Road
Construction
Performed by Contractor
❖ Quality Assurance
• Performed by Owner
5
Quality Control vs. Quality Assurance
Preparatory
Phase Start-up
Phase Production
Phase
7
3 Phases of Contractor Quality Control
What is involved?
Production Phase
• Ensure Contract Compliance
• Conduct intermittent or continuous inspections to identify and
correct deficiencies
• Inspect completed phases before scheduled Government acceptance
• Ensure Testing reports are submitted
• Ensure rework is completed
8
❖ CONSTRUCTION PHASE-Quality
Control
9
❖ Requirements
• Ensure Quality
10
❖ Advantages
• Improved Quality
• Uniformity
½ to 1% of Construction Cost
11
❖ Pre-requisites
12
❖ Quality Control In Road
Construction
• Control of Materials
• Test Procedure
• Frequency and Extent of Testing
• Acceptance Criteria
• Equipment Type & its Calibration
• Recording of Test Results
• Training for QC 13
❖ Quality Control Test
• Individual Materials
O Soil, Gravel, Aggregate, Binder
• Mixes
O Gradation of Aggregates, Mix Proportion, Mixed Design
Properties
O Spreading
O Segregation
O Temperature – Mixing, Laying, Rolling
14
❖ Quality Control Test
• Test on Compacted Layer
O Mixed Proportion (Unbound Layers)
O Density
O Mix proportion and Gradation (bound layers after extraction)
O Longitudinal Profile
O Transverse Profile
O Texture
15
❖ Tests On Borrow Materials Of embankment/subgrade
17
❖ Compaction Requirements For Embankment
And Subgrade
Expansive Clays:
Subgrade and 500 mm Not Allowed
portion just below
the subgrade
Remaining Portion of Not Less than 90
Embankment
18
❖ Frequency of Compaction Tests
Degree of compaction
(b) Subgrade and shoulders At least one test per 500 m2 for each
layer
19
❖ Location Of Density Test Points For Earth
Work
20
❖ Acceptance Criteria
Control should be based on the mean value of a set
of 5-10 density measurement.
21
❖ Granular Sub-base
Gradation One test per 200 m3
CBR As Required
22
❖ Lime/ Cement Stabilised Soil Sub-base
Test Requirements
25
❖ Wet Mix Macadam
26
❖ Prime Coat / Tack Coat
27
❖ Surface Dressing
FI and EI - do -
of
Aggregates 3 specimens per source
Stripping
Water
value Absorption - do -
of Aggregates
Test Requirement
Los Angeles Abrasion 40 % Max.
Value
FI and EI 30 % Max.
Coating and Stripping of 30 % Max.
Bitumen Aggregate
Mixtures
Soundness 12 % Max.
Water Absorption 2 % Max.
30
❖ Bituminous
Macadam
Quality of Binder Two Samples per lot to be
subjected to all or some tests as
directed by the Engineer
Aggregate Impact One Test per 50 m 3 of Aggregate
Value
FI and EI of - do -
Aggregates
Stripping Value 3 specimens per source
Water Absorption - do -
of Aggregates
Water Sensitivity of mix As Required for BC
34
❖ Requirements Of Bituminous Concrete Mix
36
❖ Aggregate Gradation
■ SAMPLING
• STOCK PILE
• COLD FEEDER BELT
HOT BINS
EXTRACTED ASPHALT MIXTURE (END
PRODUCT)
37
❖ Trouble Shooting
■ Sampling stock pile
■ Check gradation of new material added
■ Segregation in feeder belt
Improper loading of cold bins
Improper setting of individual bins
38
❖ Asphalt Content
39
❖ Temperature
40
❖ Temperature
41
❖ Compaction
■ Commence From Edges And Progress
Towards Centre
■ Initial Breakdown Rolling – 8 To 10 T
Smooth Wheel Roller
■ Intermediate Rolling – 8-10 T Dead Wt. Or
Vibratory Roller.Pneumatic Tyred Roller –12-15
T Wt. 5.6 Kg/Sq.Cm Pr.
■ Finished Rolling – 6-8 T Smooth Wheel
Tandem Roller
42
❖ Compaction
■ Roller Speed Not More Than 5 Kmph
■ Do Not Permit Rollers To Stand On
Pavement
■ Prevent Oil Drop
Keep Wheels Just Moist Enough
43
Suggested Frequency And Amplitude For Vibratory
Compaction
Nature of Frequency Amplitude Thickness of
Soil/ (CPM) (mm) Compaction,
Materials mm
ROUGH
SMOOTH
FINISH
FINISH
HIGHER SPEED
LOWER SPEED
LOW
HIGH
DENSITY
DENSITY
OPERATION
SPEED
45
Relationship Between Compactability &
Temperature
46
47
48
❖ TACK COATING BY SPRAYER
49
❖ Tack Coat Without Crack Sealing
50
❖ Overlay Over Severely
Cracked
Surface
51
❖ Inadequate Compaction And Excess
Binding Material
52
❖ WBM Surface Without Key Aggregates And Excess
Binding Material
53
❖ Shoulders At Higher
Elevation
54
❖ Poorly Widened Carriageway
WBM
55
❖ POORLY WIDENED WBM
CARRIAGEWAY
56
❖ Depressed Carriageway
57
❖ Tack Coat Surfaced WBM
Layer
58
Modern Equipment For
Quality Control Tests In
Highways
Construction
59
Asphalt Content Guage
60
❖ Portable Pendulum Type Skid Resistance
Tester
61
❖ Dynamic Skid Resistance
Tester
62
❖ Portable Asphalt Core Cutter
63
Non Nuclear Density Gauge
64
❖ Benkelmen Beam
65
❖ Fifth Wheel Bump Integrator (Roughometer)
66
❖ Nuclear Density Meter
67
Asphalt Content Guage
68
69
70
71
❖ Falling Weight Deflectometer
72
73