Kaizen Idea Sheet: Countermeasure

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 1

Activity KK JH QM PM SH OTPM DM ET

Kaizen Idea Sheet Result Area


Defect Type
P Q C D S M

Plant: M/C: Supporting table for Projection W/M KZ No:

Kaizen Theme: Reduce Man-power,cycle time. Kaizen Idea: Productivity ,Quality , Cost.

Problem/Present Status: Countermeasure: . Bench Mark Easy Operation

BEFORE AFTER Target Reduce


Manpower cost

Kaizen Start 12/2/20

Kaizen Finish 18/2/20

Team Members:

Benefits: 1)Productivity & Quality


is Improved. 2)Less Manpower
is required.
Analysis: Result:
1)At least four persons are required for 1)One person is able to perform the
the projection welding operation. operation. Scope and Plan for HD
2)Less stability. 2)More stability due to movable stand.
3)More time is required.
3)Saving in time. No M/C T/date Res. Status

Format Noun/MR/FR/09;Rev:00

You might also like