HYDROPOWER PROJECTS
By
V. K. KAPOOR
GENERAL MANAGER
NHPC
CANAL FALL
IRIGATION CANAL
INTAKE
TAIL RACE
CHANNEL
POWER HOUSE
FIGURE-1
DIVERSION STUCTURE
POWER INTAKE
ER
I V
R
POWER CHANNEL
FOREBAY PENSTOCK
FALL
POWER HOUSE
TAIL RACE
POOL
ER
I V
R
HEAD RACE
TUNNEL
FALL
RIVE
SPILLWAY
R
POWER
HOUSE
TAIL RACE
CHANNEL
DAM TOE DEVELOPMENT
FIGURE-4
ACCESS SHAFT
DAM
RIVER
SURGE CHAMBER
DAM
ACCESS
PRESSURE TUNNEL GALLERY
PRESSURE SHAFT
ACCESS
VALVE GALLERY TUNNEL
UNDERGROUND
MACHINE HALL
TAILRACE TUNNEL
SURGE TANK
SURGE CHAMBER
TAIL RACE
UNDERGROUND MACHINE HALL TUNNEL
STEEL PENSTOCK
DIAGONAL TUNNEL ALIGNMENT WITH
AIR-CUSHION SURGE TANK
(NORWEGIAN SOLUTION) FIGURE-8
SURGE TANK
MAIN INLET
INTAKE PRESSURE TUNNEL VALVE
TAILRACE
PRESSURE SHAFT
TURBINE
HYDROSTATIC LEVEL
DOWNSTREAM
STEADY STATE LEVEL SURGE SHAFT
RESER-
VOIR PRESSURE SHAFT AIR VENT
LOW PRESSURE
CONDUIT
TAILRACE TUNNEL
UNDERGROUND POWER HOUSE
(MIN 1 TON CAPACITY AND RADIUS 10 M) AIR VENT PIPE 300 DIA
(SUPPLY BY HM CONTRACTOR)
RANDOM BACKFILL
TOP EL 210.00
MWL 208.25
FRL 205.00
TRASH RACK
RCC BEAMS
EL 169.50
EL 160.00
EL 157.25
DRILLING JUMBO
TUNNEL BORING MACHINE
TUNNEL INSIDE AT BIFURCATION
ROCK BOLTING
SHOTCRETING
SEEPAGE INSIDE TUNNEL
POWERHOUSE L-SECTION
SPIRAL CASING
PI-SHI_HANG AQUEDUCT
RIVER DIVERSION-TEHRI
FISH LADDER-URI BARRAGE
HEAD RACE TUNNEL
NATHPA JHAKRI H.EPROJECT
IDUKKI ARCH DAM
CFRD UNDER CONSTRUCTION
DHAULIGANGA H.E. PROJECT
INTAKE STRUCTURE
TEHRI HEP
KENGKOU RCC DAM-CHINA
MOZITAN BUTRESS DAM CHINA
POWER HOUSE TURBO GENERATORS-
METTUR DAM
POWERHOUSE MACHINE HALL-URI HE
PROJECT
POWERHOUSE MACHINE HALL
KENGKOU HEP
SPILLWAY RADIAL GATES
TEHRI H.E PROJECT
POWER HOUSE ROTOR INSTALLATION
BAISHAM HEP - CHINA
POWER HOUSE STATOR INSTALLATION
BAISHAM HEP - CHINA
SANGTAO EARTH DAM CHINA
CANAL HEAD POWER HOUSE SARDAR
SAROVAR HEP
SHIMEN DOUBLE CURVATURE ARCH DAM
CHINA
SHIZITAN ROCKFILL DAM
CHINA
PENSTOCKS
LOKTAK HEP-MANIPUR
SURPLUS SLUICES-METTUR DAM
UNDERGROUND POWERHOUSE
TEHRI HEP
TURBO GENERATORS
INSTALLATION - UG POWERHOUSE
TEHRI HEP
TAILRACE OUTLET PORTAL
URI H.E.PROJECT
SPIRAL CASING UG POWERHOUSE
TEHRI HEP
BARRAGE – URI HE PROJECT
DESILTING BASIN-URI HEP
COMPONENTS OF HYDRO
POWER PROJECT
CIVIL COMPONENTS
ESSENTIAL NON-ESSENTIAL
ESSENTIAL CIVIL COMPONENTS
DIVERSION STRUCTURES
WATER CONDUCTOR SYSTEM
POWERHOUSE
TAILRACE SYSTEM
DIVERSION STRUCTURES
• DAM
Concrete
Rock fill
Earthen
Arch
Buttress
CFRD(Concrete Faced Rock fill Dam)
RCC Dam(Roller Compacted Concrete Dam)
DIVERSION STRUCTURES
• SPILLWAY
Ogee
Chute
Side Channel
Morning glory
Tunnel
Under sluices
DIVERSION STRUCTURES
• ENERGY DISSIPATION ARRANGEMENTS
Stilling Basins
Ski-jump buckets ( with or without plunge pools)
Roller buckets
• TEMEPORARY DIVERSION STRUCTURES
Diversion Channels
Diversion tunnels
Coffer Dams
DIVERSION STRUCTURES
• BARRAGES
• WEIRS
Broad crested weir
Trench weir
WATER CONDUCTOR SYSTEM
• INTAKE
• HEAD REGULATORS
• DESILTING BASIN ( In open system)
• DESILTING CHAMBERS(In underground system)
• POWER CHANNEL
WATER CONDUCTOR SYSTEM
• SURFACE
• UNDERGROUND
• SEMI-UNDERGROUND
• SHAFT
TAIL RACE SYSTEM