SK - Aashiq-9918014013 (Newly Constructing Residential House)
SK - Aashiq-9918014013 (Newly Constructing Residential House)
Aashiqrasool.MATERIAL)
(CONSTRUCTION SK
9918014013
CONTEXT:
source:(Author) source:(Author)
PURPOSE OF THE STUDY:
• The most fundamental requirements of the users were
incorporated in the construction.
source:(Author)
EXCAVATION:
• A layer of concrete is put inside the pit to provide a level and hard
surface to the foundation work
• The ratio of the mix is usually 1:5 10 or 1:4:8 .
• The thickness should be minimum 4" Mixing of the PCC is
generally a manual process.
source:(www.yellowstonegreenhomes.com)
QUANTITY OF MATERIALS FOR P.C.C
source:(www.yellowstonegreenhomes.com)
CHECKING CEMENT NEEDED:
• Colour of the cement should be uniform and grey.
• Cement should feel smooth when touched or rubbed in between the fingers.
• If you insert your hand in the bag of the cement, it should feel cool.
STRUCTURAL DESIGN:
Width and depth of the foundations
Location and number of columns
Sizes of different columns and their footings
Sizes of all the beams
Diameter and number of steel bars in columns, beams and roof slab
• Thickness and desired strength of the concrete etc..
LAYOUT FRAMED STRUCTURE
` `
BEFORE AFTER
source:(Author) source:(Author)
CONCLUSION: