PLTU 1 NTB 2x10 MW - BIMA

SUMMARY KONTRAKTUAL
No Description
1 Name of Project Penyelesaian Kelanjutan Proyek PLTU 1 NTB - Bima (2x10 MW)
2 Number of Contract TBA
3 Bid Proposal xx
4 Payment of Method 2 method :
 Down Payment : T/T (20%) from Work Values
 Progress : L / C from Work Values
 COD = 5% from Work Values
 FAC = 5% from Work Values
5 Duration Unit #1 = xx months dan Unit #2 = xx months
6 Scope of Work Engineering, Procurement and Construction (EPC) :
Design for Mechanical, Electrical and I & C, Manufactures, Inspection and Testing at
manufacture’s facility, packing for export, shipment, insurance, customs clearance,
delivery to site, unloading, storing, and handling to site, completion of erection,
mandatory and recommended spare part, operation and maintenance during testing and
commissioning, warranty and inspection prior to final acceptance of complete plant
7 Bid Bond 10% from Work Values and will submit with 4 weeks counting from Bid Document receive
from PT Rekadaya Elektrika
Next Step
A. If scope of work SUMEC will be engineering, procurement and construction,
SUMEC will provide :
 Master schedule of material supply, levering of material, custom clearance,
delivery to site 20 May 2022 or 21 May 2022
 According to Assessment Activity : Completeness of detail design until
approval from the Owner
 Provide construction method
 According to Cleaning and Preservation will do Erection and Commissioning
 According to Cleaning and Preservation will do First Inspection : 1 month
before end of warranty period Unit Power Plant
B. Priority : Installation Over Head Crane, Mechanical Works, Electrical Works
ACTUAL CONDITION : PROGRESS PROJECT
Engineering Progress

Construction Progress
Dokumentasi (Site Visit Pemaketan Pekerjaan Mechanical, Electrical dan I&C)

CHINA ENERGY ENGINEERING GROUP (Anhui Electric Power Design


1 Institue Co., Ltd.)

2 PT HYPEC INTERNATIONAL
CHINA ENERGY ENGINEERING GROUP GUANGDONG POWER
3
ENGINEERING Co., Ltd (GPEC)

4 POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INSTITUTE


Co., Ltd
5 PT POESER INDONESIA

6 SEPCOIII ELECTRIC POWER CONSTRUCTION CO., LTD

KSO XIAN ELECTRIC ENGINEERING CO., LTD. - PT COVENANT


7 ENGINEERING

8 SUMEC COMPLETE EQUIPMENT & ENGINEERING CO., LTD

6
Dokumentasi
LOWER CASING STEAM TURBINE

7
Dokumentasi
UPPER CASING STEAM TURBINE

8
Dokumentasi
ROTOR STEAM TURBINE

9
Dokumentasi
BOILER FEED PUMP 6,3 KV

10
Dokumentasi
BOILER FEED PUMP 380 V

11
Dokumentasi
DUCTING & FAN

12
Dokumentasi
STEEL CHIMNEY

13
Dokumentasi
ESP

14
Dokumentasi
BLOW DOWN TANK

15
Dokumentasi
FD FAN DAN SA FAN

16
Dokumentasi
AIR HEATER

17
Dokumentasi
DRAINAGE TANK

18
Dokumentasi
GIRDER OVER HEAD CRANE

19
Dokumentasi
WATER TREATMENT PLANT

20
Dokumentasi
Kunjungan UIP NUSRA 04 Desember 2021
Dokumentasi