Professional Documents
Culture Documents
01 ABC R Principals v4
01 ABC R Principals v4
Project phases
1. Surveying 2. Investigate 3. Pre-grouting
X (North) Z
Our tunnel (End) (Height)
x=35 000, Y=-150, Z=75
Our tunnel
Stockholm
x=0, Y=0, Z=0
Y (East)
Reference point
Stockholm
X=0 Y=0 Z=0
Preparations
1. Creation 2. Input data into TM 3. Output from TM
Section 500
Section 5000
Section 9000
Section 12 000
Tunnel line in table format
Laser line =
Section 3
Section 2
Section 1
Drillplans
Drillplan (Simplified)
Origo
(Tunnel line)
Contour holes
Easer
Reaming
holes
Cut hole
X Bottom holes
Drillplan table
Transferring data to/from rig
Tunnelline (*.tl8)
Laserline (*.las)
Drillplan (*.dpc)
loading to a PC-card
Roundlogs (*.log)
saving on a PC-card
Settings
.tl8/.tli
File
.las extensions
.dpc
Load file / Read tunnel line
Tunnel lines
on the PC Card
Load file / Read laser line
Laser lines
on the PC Card
Settings / Read drill plan
Drill plans
on the PC Card
Edit laser
Load file / Read drill plan
Settings / Choose section number
Settings / Choose section number
Settings / Navigate
Settings / Navigate Method A
Settings / Navigate Method C
Drill Plan Designer - DPD
Different coordinate systems
Y (up)
North
X (right)
East Z (in)
Up
Coordinates from drill
plan
Map
coordinates
Atlas Copco
Atlas Copco 27 27
F2 - Settings
Hole depth reference (ABC R/T)
Ref.plan/Drill plan
Rock/Menu Rock/Drill plan Ref.plan/Menu
A A A C
C C A C
R
R R
R
1250 0146 45
Drilling depth “Drill plan”
Required hole
depth 4,00 m
Cut from drill plan
Cut with new reference