Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 32

ABC Regular principals

Project phases
1. Surveying 2. Investigate 3. Pre-grouting

4. Drilling 5. Charging 6. Blasting&Ventilation


Project phases

7. Loading 8. Scaling 9. Rock reinforcement


Project

X (North) Z
Our tunnel (End) (Height)
x=35 000, Y=-150, Z=75

Our tunnel (Start)


x=25000, Y=-200, Z=50

Our tunnel
Stockholm
x=0, Y=0, Z=0

Y (East)

Reference point
Stockholm
X=0 Y=0 Z=0
Preparations
1. Creation 2. Input data into TM 3. Output from TM

Detailed Tunnel line


tunnel Laser line
data Drill plan

4. Transfer data to rig


Planning tunnel line

Section 500

Section 5000

Section 9000

Section 12 000
Tunnel line in table format

X= North/South distance from reference point


Y= East/West distance from reference point
Z= Height from reference point
Tunnel line in graphic format

X= Distance from reference point


Y= East/West coordinates
Z= Height
Laser line/Tunnel line

Laser line =

Tunnel line = Section 4

Section 3

Section 2

Laser line Tunnel line

Section 1
Drillplans
Drillplan (Simplified)
Origo
(Tunnel line)

Contour holes
Easer

Reaming
holes

Cut hole

X Bottom holes
Drillplan table
Transferring data to/from rig

 Tunnelline (*.tl8)
 Laserline (*.las)
 Drillplan (*.dpc)
loading to a PC-card

 Roundlogs (*.log)
saving on a PC-card
Settings

.tl8/.tli
File
.las extensions
.dpc
Load file / Read tunnel line

Tunnel lines
on the PC Card
Load file / Read laser line

Laser lines
on the PC Card
Settings / Read drill plan

Drill plans
on the PC Card
Edit laser
Load file / Read drill plan
Settings / Choose section number
Settings / Choose section number
Settings / Navigate
Settings / Navigate Method A
Settings / Navigate Method C
Drill Plan Designer - DPD
Different coordinate systems

Y (up)
North

X (right)
East Z (in)
Up
Coordinates from drill
plan
Map
coordinates

Coordinates from rig


F4 - Drill plan

Atlas Copco
Atlas Copco 27 27
F2 - Settings
Hole depth reference (ABC R/T)

Ref.plan/Drill plan
Rock/Menu Rock/Drill plan Ref.plan/Menu

A A A C
C C A C

R
R R
R
1250 0146 45
Drilling depth “Drill plan”

Required hole
depth 4,00 m
Cut from drill plan
Cut with new reference

You might also like