South Slide Chaquicocha

Pit
14 - August - 2022
INSPECTED AREAS.
OUSIDE MINE.
Chaquicocha Pit ( side south and north)
Chaquicocha Pit slide south
Victoria platform and warehouse
Zone of Reutech Radar in Victoria Platform
Huascar Platform and level 3750 platform
Overlook Victoria and CH.

INSIDE MINE 
No works in inside mine.
The works inside mine continues stopped until the return of the ARM staff

2
South Slide Mitigation CHQUG

South Slide Mitigation First stage - 3990 to 3960


• The mitigation work in the bench
level 3990 has been completed to
100%.
• At present, is being worked on the
benches:
 3980 with progress of 59%
 3970 with progress of 23%
 3960 with progress of 4%

• The mitigation work in the south


slide of the Chaquicocha Pit
ongoing.

• The Geotechnical monitoring


continues in the Chaquicocha Pit.
South Slope Mitigation
South Slide  3990 is completed.
Mitigation  3980 with progress of 59%
 3970 with progress of 23%
Ongoing  3960 with progress of 4%

Work in 3990 completed Works in 3980 Works in 3970 and


3960

4
South Slide Mitigation CHQUG

South Slide Mitigation


First stage - 3990 to 3960

3990
3980
3970
3960
Near Term Water Management

Verónica Pond 4115 Surface Drainage System


• Sump CHQ 3620: 06 flyth pumps
operational. Pumping flow 230 l/s.

• Pond UG 3750: 03 turbine pumps


operational.
Mancora Pond 3942
• TK TR5 3888: 03 turbine pumps
operational.
3
W-2
CHP

Sump CHQ 3620 • The works the new pumping line of


CH pond to TR5 is completed.

Poza UG 3750
• The Chaquicocha pit sump level
Tk TR5 3888
with tendency to go down. At
present level is 3635.94
Sump Level CHUG
• 12 – 07 – 2022: The level
Sump level was 3637.51
CHUG
• 14 – 08 – 2022: At present
level is 3635.94

Sump Level in the date At present At present


12-07-2022

-160 cm