PROCESS SAFETY WORKSHOP-Leak Test
PROCESS SAFETY WORKSHOP-Leak Test
construction – commission
•GOC: gasket / flange / piping material and schedule / correct bolting
technique / alignment.
• No stress
• Test pressure
• Temperature
operation
Vibration / thermal cycling / critical joints identified
Maintenance: SIRP / COW / leak test
In service inspection (leak searching PM)
Guidance of
Bolted Joint Bolted Joints
leak Reduction
To
P: 110% MAWP
90% PSV
Temp: ambient/service
media
GAS LEAK MANAGEMENT (EMERGENCY)
•Statistic to cover dynamic (110% MAWP for piping and 90% PSV setting)
•Why N2:
•No possibility for explosion to occur if flange joints failed
•Available in market for long time (simple technique)
•Ability to represent service fluid (gas) in behavior
•Can represent liquid.