Masonry Works
Estimating Materials & Labor for Masonry Activities
estimating plastering activities 150x200x400 12.5 1.575 1.050 0.788 0.656 0.088
600 1.72 1.83
800 1.30 1.42
for walls including the finishing 200x200x400 12.5 3.544 2.363 1.772 1.477 0.197
1000 1.05 1.17
works in terms of equivalent
bags of cement and volume of Picture: CHB
sand materials
Table 2: Masonry Plastering
Table 3: Shows masonry Plaster Bags of Cement per Volume of Sand per
Class
requirement for steel Mixture Square Meter Square Meter
A6
A2
A1
A7
A8
A9 A12
Area Computation for CHB: Area Computation for Plastering: Subtract door
A8 = 0.80 (4.0 ) = 3.20 (2) = 6.40 sq. m Apr = (6.941 + 8.50 ) 9.4/2 openings
A9 = 0.85 (4.0) = 3.40 (2) = 6.80 sq. m = 72.57 (2) = 145.14
A10 = (2.095 + 3.032) 5.65/2 = 14.48 (2) = 28.96 sq. m = - 4.30 (4.0) 2 = -34.4
A11 = (3.090 + 3.571) 2.90/2 = 9.66 (2) = 19.32 sq. m Apr = = 110.74
A12 = 2.90 (4.0) = 11.6 (2) = 23.2 sq. m = 110.74 (2.0) = 221.48 sq. m
Consider Table 3 using 6” CHB with Class C Table 2: Masonry Plastering Thickness 10-15mm
Mixture Plaster Bags of Cement per Volume of Sand per
Class
Mixture Square Meter Square Meter
QCHB = 751.75 sq. m (12.5) CHB / sq. m A 1.:2 0.176 0.030
QCHB = 9396.875 pcs B 1:3 0.132 0.045
C 1:4 0.106 0.060
D 1:5 0.088 0.075
Add 3-5% breakage for contingency during
delivery, hauling and installation
Aplastering = Apls + Aprs + Apf + Apr
QCHB = 9396.875 + 3% (9396.875) Aplastering = 684.08 + 684.08 + 221.48 + 290.29
QCHB = 9678.79 ~ 9679 pcs Aplastering = 1879.93 sq. meter
QCEMENT = 751.75 sq. m (0.788) Bags of Cement / sq. m QSAND = 1879.93 sq. m (0.06) cu. m of sand / sq. m
QCEMENT = 592.37 ~ 593bags of Cement for Mortar QSAND = 112.79~ 113 cu. meter of sand
QSAND = 751.75 sq. m (0.088) cu. m of sand / sq. m QCEMENT = 1879.93 sq. m (0.106) bags of Cement / sq. m
QSAND = 63.15 ~ 64 cu. meter of sand for Mortar QCEMENT = 199.27~ 200 bags of Cement
Table 3: Masonry Reinforcement
Q10Øv = 751.75 sq. m (1.05 lm of bars/sq. m) = 789.33 lm
Vertical Horizontal
Q10Øh = 751.75 sq. m (1.42 lm of bars/sq. m) = 1067.48 lm Spacing
Reinforcement Reinforcement
Qwire = 1856.81 lm (0.616 kg/lm) 20 kgwire = 22.87 kg of wire 1000 1.05 1.17
Rate of Activity
Item Unit Quantity No. days Rate / day Amount
Sq. meter / day
1 2 3 4 5 6 7
CHB Laying sq. m 751.75 10 75.18 1225.00 92,089.38
Plastering sq. m 1879.93 16 117.49 1225.00 143,932.14
Cost of Labor Php 236,021.52
Note:
Column 3 - are computed quantity/s for CHB laying or Area of CHB
- plastering quantity was doubled because of plaster area are two faces inside plater and outside
plaster activities
Column 4 - rate of accomplishment per day of 1-skilled mason and 1 labor or helper
Column 5 - number of days to complete the activities consider 1 pair of workers only; 3 / 4 = 5
Column 6 - rate of 1-skilled mason P700/day plus 1-labor of P525.00/day equals P 1225.00 per day
Column 7 - amount to complete the quantity of activities in column 3
Unit Cost
Item Activity Unit Quantity Amount
Material Labor This is a standard form of
4.1 CHB Laying sq. m 751.75 584.84 122.5 531,742.85 presenting commercial
4.2 Plastering sq. m 1879.93 113.75 76.56 357,769.48 proposal in terms of bill of
quantities
Sub-Total 889,521.52