COMPANY PROFILE
IP Rings was born out of the technical collaboration between India Pistons Limited and Nippon Piston Ring Company Ltd., Japan - a world class leader in Ring Technology.
IP Rings is the only Company in India, which has under got one roof, facilities for : Chromium Plating Moly flame spray Plasma spray Gas Nitriding Nifflex Cell
Entire spectrum of the automobile industry from two-wheelers to Heavy Commercial Vehicles and Tractors are catered by us.
CLIENTS
OBJECTIVE PRODUCTIVITY IMPROVEMENT IN GAS NITRIDING CELL THROUGH: Improvement in throughput time Improvement in operator efficiency Improvement in operator utilization
THE PROBLEM
There was no particular sequence being followed by the operator, except at the start of the operations. At the start of the operations first the degreasing process is started. Once the first rod is degreased and the operations progress the rest of the operations are carried out as convenient. NO PROPER SEQUENCE OF OPERATION.
RESEARCH METHODOLOGY
Research Design: Descriptive research Data Collection: Primary data through observation Sampling Method: Judgemental non-Random Sampling
FORMULAS TO BE USED 1. Normal time = Av. Cycle time X Performance rating 2. Standard time = Normal time X Allowance factor
DEGREASING
1. Loading first rod 2. Degreasing 3. Loading rod II 4. Degreasing 5. Unloading and loading
Time for loading first rod 7.82 7.66 8.1 7.59 7.9
7.814
Cycle time for degreasing 200.07 199.07 197.06 198.27 198.55 199.11 198.76 198.21 196 199.31 198.28 198.21 197.33 198.28 196.96 198.03 199.76 198.25 197.88 198.18 197.2785
Unloading & loading 22.5 17.3 18.41 18.33 21.21 16.53 20.28 22.76 19.66 18.61 17.89 23.41 18.22 17.39 19.91 20.29 21.12 21.89 16.39 18.86 19.548
13.276
S no. 1 2 3 4 5
Operations Loading rod Degreasing Loading rod II Degreasing Unloading and loading Standard time for degreasing
DRY HONING
1. Mandrel loading 51.5 seconds 2. Loading to DH machine 11.4 seconds 3. Dry honing 197.2 seconds Mandrel loading 51.5 seconds Unloading from mandrel 45 seconds Loading to GN basket 17 seconds 4. Unloading and loading 18.3 seconds
Mandrel loading 58.8 33.21 50 47.77 39.28 41.11 53.21 48.96 47.94 38.81 43.23 50.01 57.44 48.25 45.48 45.71 41.28 36.71 40.49 56.26 46.1975
Loading to dry honing machine 10.84 10.51 9.76 10.11 10.25 11.03 10.45 8.61 10.18 10.77 9.39 10.49 11.23 9.88 10.31 8.49 11.99 10.18 10.83 9.97 10.2635
Unloading from mandrel 41.39 38.43 37.89 37.36 38.43 39.88 52.51 39.94 40.40 38.70 40.4
Loading to GN basket 16.18 14.21 14.33 17.23 15.03 14.83 15.56 14.88 16.01 15.49 15.3
Dry honing 196.27 197.26 196.18 196.33 200.02 197.21 196.77 198.10 196.88 197.13 196.81 196.21 197 198.18 196.96 199.21 196.69 196.8 198.31 197.57 197.2945
Unloading loading 16.12 24.4 15.81 14.13 17.22 13.21 16.81 15.25 16.13 16.8 17.03 14.99 17.22 15.03 16.13 15.09 16.18 14.29 21.4 16.02 16.463
S no. 1 2 3 4 5 6 7
Operation Mandrel loading Loading to dry honing machine Dry honing Mandrel loading II Unloading and loading Unloading from mandrel Loading to GN basket Standard time for dry honing
Average cycle time 46.1 10.2 197.2 46.1 16.4 40.4 15.3
SEQUENCE SUGGESTED
1. DEGREASING 2. DRY HONING
DEGREASING CHART
REFINED SEQUENCE
DEGREASING 1. Loading rod 8.7 seconds 2. Degreasing 197.7 seconds 3. Loading rod II 14.8 seconds 4. Degreasing 197.7 seconds 5. Unloading and loading rod 21.8 seconds DRY HONING 6. Mandrel loading 51.5 seconds 7. Loading to DH machine 11.4 seconds 8. Dry honing 197.2 seconds Mandrel loading 51.5 seconds Unloading from mandrel 45 seconds Loading to GN basket 17 seconds 9. Unloading and loading 18.3 seconds
1 2 3 4 5 4 6 7 8 5 4 9 8 5 4 9 8 5 - 4 . so on