AEON MALL DELTAMAS PROJECT

Kota Deltamas, Cikarang Bekasi, Indonesia

PILING WORK REPORT


- Wing A

Proposed by Approved by
PILING WORK REPORT - WING A AEON MALL DELTAMAS PROJECT
Kota Deltamas, Cikarang Bekasi, Indonesia

TP40
HUME (C+C) 100 TON
18/12/2021
TENSION TEST
PILING WORK REPORT - WING A AEON MALL DELTAMAS PROJECT
Kota Deltamas, Cikarang Bekasi, Indonesia

Summery Of Test Pile Report


Method Heigh of Hammer Final Set Eccentricity PDA TEST Axial Test Tension Test Laterlal Test
Result
Date of Material / Ra Design Ra refer Temporary
PILE Machine Pile No Pile Driving Calendaring Total Time depth from GL S PCE Temporary Temporary Temporary
Piling Supplier (ton) Type Hiley Cheliss % Result (X) mm (Y) mm Plan Result Remarks Plan Remarks Plan Remarks Plan Remarks
d = 1~ 26 (m) d>26 (m) Blow Duration d (m) (mm) e<75mm Result Result Result
1961 (Ton) (RMX)

3-Dec-21 TP-1 Hume 100 A Normal 1,5 834 120 26,5 3 170,24 170,2% OK 72 73 OK - - - 200 Ton < 25mm 8,05 OK - - - - -
3-Dec-21 TP-3 Hume 100 B 1,75 1,75 1267 120 27 5 185,54 185,5% OK 21 11 OK - - - 200 Ton < 25mm 6,44 OK - - - - -
4-Dec-21 TP-19 Hume 100 C 2 2 1398 100 27,7 2 235,26 235,3% OK 10 35 OK 200 252 OK - - - - - - - -
6-Dec-21 TP-22 Hume 100 D Normal 1,75 1245 100 27 5 185,54 185,5% OK 32 3 OK 200 230 OK - - - - - - - -
6-Dec-21 TP-5 Hume 100 E Normal 2 1337 100 27 5 212,05 212,1% OK 8 6 OK - - - 200 Ton < 25mm - - - - -
8-Dec-21 TP-25 Hume 100 E Normal 2 1412 120 27,5 6 205,29 205,3% OK 37 10 OK 200 - - - - - - - -
8-Dec-21 TP-29 Hume 100 E Normal 2 1637 100 27,5 4 219,26 219,3% OK 12 0 OK 200 - - - - - - - -
9-Dec-21 TP-31 Hume 100 E Normal 2 1111 90 27 2 235,26 235,3% OK 49 17 OK 200 - - - - - - - -
9-Dec-21 TP-9 Hume 100 E Normal 2 1135 130 27,25 4 219,26 219,3% OK 31 22 OK - - - 200 Ton < 25mm - - - - -
10-Dec-21 TP-33 Hume 100 E Normal 2 1230 120 27 5 212,05 212,1% OK 14 34 OK 200 - - - - - - - -
10-Dec-21 TP-36 Hume 100 E Normal 2 1118 110 27,5 8 193,00 193,0% OK 39 57 OK 200 - - - - - - - -
11-Dec-21 TP-35 Hume 100 E Normal 2 1035 90 25 4 219,26 219,3% OK 45 16 OK 200 - - - - - - - -
11-Dec-21 TP-32 Hume 100 E Normal 2 913 100 26,25 4 219,26 219,3% OK 6 45 OK 200 - - - - - - - -
Machine 1
12-Dec-21 TP-7 Hume 100 E Normal 2 1124 100 27,5 6 205,29 205,3% OK 37 46 OK - - - 200 Ton < 25mm - - - - -
12-Dec-21 TP-28 Hume 100 E Normal 2 1073 100 27,25 4 219,26 219,3% OK 3 51 OK 200 - - - - - - - -
13-Dec-21 TP-27 Hume 100 E Normal 2 1134 110 27 5 212,05 212,1% OK 8 0 OK 200 - - - - - - - -
13-Dec-21 TP-24 Hume 100 E Normal 2 1202 90 27 4 219,26 219,3% OK 23 10 OK 200 - - - - - - - -
15-Dec-21 TP-23 Hume 100 E Normal 2 1025 95 26 4 219,26 219,3% OK 43 22 OK 200 - - - - - - - -
15-Dec-21 TP-20 Hume 100 E Normal 2 1133 90 27 2 235,26 235,3% OK 1 30 OK 200 - - - - - - - -
16-Dec-21 TP-18 Kobe 100 E Normal 2 1105 100 25,8 - - - - 1 50 OK 200 - - - - - - - -
16-Dec-21 TP-4 Kobe 100 C 2 2 1468 120 29 37 - - NG 29 8 OK - - - 200 Ton < 25mm - - - 8 Ton < 25mm
17-Dec-21 TP-16 Kobe 100 C 2 2 1061 100 24 5 212,05 212,1% OK 47 43 OK 200 - - - - - - - -
17-Dec-21 TP-15 Kobe 100 C 2 2 1043 90 24 8 193,00 193,0% OK 28 15 OK 200 - - - - - - - -
18-Dec-21 TP-12 Hume 100 E Normal 2 OK 29 19 OK 200 - - - - - - - -
18-Dec-21 TP-40 Hume 100 E Normal 2 1280 90 27 2 235,26 235,3% OK 6 45 OK - - - - - - 120 Ton < 25mm - -
29-Dec-21 TP13 Hume 100 E Normal 2 1234 90 28 5 212,05 212,1% OK OK 200 - - - - - - - -
Method Heigh of Hammer Final Set Eccentricity PDA TEST Axial Test Tension Test Lateral Test
Result
Date of Material / Ra Design Ra refer Temporary
PILE Machine Pile No Pile Driving Calendaring Total Time depth from GL S PCE Temporary Temporary Temporary
Piling Supplier (ton) Type Hiley Cheliss % Result (X) mm (Y) mm Plan Result Remarks Plan Remarks Plan Remarks Plan Remarks
d = 1~ 26 (m) d>26 (m) Blow Duration d (m) (mm) e<75mm Result Result Result
1961 (Ton) (RMX)

6-Dec-21 TP-2 Hume 100 A Normal 1,5 1387 120 25,8 4 164,44 164,4% OK 25 30 OK - - - 200 Ton < 25mm 5,52 OK - - - - - -
6-Dec-21 TP-14 Hume 100 B 1,75 1,75 1329 105 25,5 2 205,86 205,9% OK 88 13 Not OK 200 225 OK - - - - - - - - -
8-Dec-21 TP-17 Hume 100 C 2 2 1175 146 24,5 3 226,98 227,0% OK 47 11 OK 200 - - - - - - - - -
8-Dec-21 TP-21 Hume 100 D Normal 1,75 1120 95 25,8 2 205,86 205,9% OK 39 76 OK 200 - - - - - - - - -
9-Dec-21 TP-6 Hume 100 E Normal 2 1231 100 25 4 219,26 219,3% OK 10 61 OK - - - 200 Ton < 25mm - - - - - -
9-Dec-21 TP-26 Hume 100 E Normal 2 1291 100 25 5 212,05 212,1% OK 14 25 OK 200 - - - - - - - - -
10-Dec-21 TP-30 Hume 100 E Normal 2 1332 95 25,3 2 235,26 235,3% OK 25 32 OK 200 - - - - - - - - -
Machine 2
10-Dec-21 TP-8 Hume 100 E Normal 2 1305 90 27,5 4 219,26 219,3% OK 28 40 OK - - - 200 Ton < 25mm - - - - - -
11-Dec-21 TP-34 Hume 100 E Normal 2 1382 90 26 4 219,26 219,3% OK 46 35 OK 200 - - - - - - - - -
11-Dec-21 TP-10 Hume 100 E Normal 2 1460 100 22 3 226,98 227,0% OK 14 2 OK - - - 200 Ton < 25mm - - - - - -
28-Dec-21 TP-39 Hume 100 E Normal 2 1409 100 23,75 3 226,98 227,0% OK 9 58 OK 200 - - - - - - - - -
28-Dec-21 TP-11 Hume 100 E Normal 2 1326 100 24,75 3 226,98 227,0% OK 30 17 OK 200 200 Ton < 25mm - - - - - -
29-Dec-21 TP-38 Hume 100 E Normal 2 1315 100 24 6 205,29 227,0% OK 15 13 OK 200 - - - - - - - - -
29-Dec-21 TP-37 Hume 100 E Normal 2 1459 100 23,75 4 219,26 227,0% OK 11 3 OK 200 - - - - - - - - -
PILING WORK REPORT - WING A AEON MALL DELTAMAS PROJECT
Kota Deltamas, Cikarang Bekasi, Indonesia

Attachment Machine 1

27m

2mm

26m

20mm

Final Record Final Settlement

Pile No : TP-40
PILING WORK REPORT - WING A AEON MALL DELTAMAS PROJECT
Kota Deltamas, Cikarang Bekasi, Indonesia

Ilustration of Penetration Depth


(Machine -1)

3m
GFL ± 0 (IL+ 46.500)
15 m IL + 46.000
(Actual)
Joint Welding

27 m 15 m
27,5 m

IL + 19.000

Illustration for Pile No : TP - 40


PILING WORK REPORT - ECCENTRICITY P30A AEON MALL DELTAMAS PROJECT
Kota Deltamas, Cikarang Bekasi, Indonesia

ECCENTRICITY (Machine 1)

TP - 40

6 mm
45 mm

Pile No TP - 16 TP - 15 TP-12 TP-40


Coordinate x 742799.597 742795.488 742765.665 742765.737
Plan y 9297201.542 9297221.243 9297245.402 9297250.968
Coordinate x 742799.550 742795.516 742765.636 742765.743
Actual y 9297201.499 9297221.228 9297245.383 9297251.013
x 47 mm 28 mm 29 mm 6 mm

y 43 mm 15 mm 19 mm 45 mm
PILING WORK REPORT - ECCENTRICITY P30A AEON MALL DELTAMAS PROJECT
Kota Deltamas, Cikarang Bekasi, Indonesia

Pile Position
Location Type No Pile Plan Actual ∆ Remaks
d
X Y X Y X Y
CL. A1/AH-AI P30A 100 -675 6750 -955 6750 -280 0 280,00
99 675 6750 479 6750 -196 0 196,00
101 -1845 6075 -2155 6075 -310 0 310,00
98 1845 6075 1710 6075 -135 0 135,00
95 -675 5400 -840 5400 -165 0 165,00
96 675 5400 529 5400 -146 0 146,00
94 -1845 4725 -2175 4725 -330 0 330,00
97 1845 4725 1715 4725 -130 0 130,00
93 -675 4050 -975 4050 -300 0 300,00
92 675 4050 475 4050 -200 0 200,00
90 -675 2700 -905 2700 -230 0 230,00
91 675 2700 460 2700 -215 0 215,00
89 -675 1350 -925 1350 -250 0 250,00
88 675 1350 455 1350 -220 0 220,00
86 -675 0 -1145 0 -470 0 470,00
87 675 0 245 0 -430 0 430,00
85 -675 -1350 -863 -1350 -188 0 188,00
84 675 -1350 475 -1350 -200 0 200,00
82 -675 -2700 -930 -2700 -255 0 255,00
83 675 -2700 465 -2700 -210 0 210,00
81 -675 -4050 -985 -4050 -310 0 310,00
80 675 -4050 425 -4050 -250 0 250,00
76 -1845 -4725 -2105 -4725 -260 0 260,00
79 1845 -4725 1595 -4725 -250 0 250,00
77 -675 -5400 -845 -5400 -170 0 170,00
78 675 -5400 305 -5400 -370 0 370,00
75 -1845 -6075 -2065 -6075 -220 0 220,00
72 1845 -6075 1595 -6075 -250 0 250,00
74 -675 -6750 -895 -6750 -220 0 220,00
73 675 -6750 485 -6750 -190 0 190,00