Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 1

KJ-P1-UC1.

1 Supplier Materials Delivery by e-Kanban [Status: Draft] OTO / MET

Data Input / Output Human-Machine


Interface
Data Input Conceptual System Architecture
• Material ID HMI Input device
• QR/Bar Code • Tablet for operator
• Location • LED Monitor
(touchscreen)
Storage Strategy
• Local Cloud Database HMI Output device
• Local Server • Tablet for operator
• LED Monitor 24” to
Datacenter show the system in-
• Central Traceability operations animation
Server System in real-time and
analytics

Showcase Objectives
Source: MDPI

• To demonstrate the
Source:Sewio
use case showing e-
kanban works
• Participant
understand how to
Software Related Devices Related Equipment Manpower required to operate
use, algorithm
process, and
• TEC-IT QR/Bar Code Generator Software • QR/Barcode display • Tray • 1 x Operators
benefits/impact of the
• Iks software • Barcode Reader • Inventory Box use case
• Server software • Touch Screen Monitor
• Gateway
• PC Intel i7 16GB 1Mbps

Use Case Description Problem can be solved Typical benefits or impacts Technology Providers

In this use case, will show how digital tool for This system could makes short lead • Reduce manual-entry errors
supply chain management works. This tool is • Gain full real-time visibility of processes
time and it creates environments of
capable of controlling material consumption in real • Fewer employees needed to cover the
visibility and transparency and operation
time, permitting optimization of the flow of stimulates the collaboration of the • Precise inventory flow (no excess, no
information and materials between ‘customers’
supply chain. shortage)
and suppliers. At the same time,
1 1

You might also like