Professional Documents
Culture Documents
Six Sigma Green Belt.8169983.powerpoint
Six Sigma Green Belt.8169983.powerpoint
Six Sigma Green Belt.8169983.powerpoint
1 10/15/2022
Project Progress Overview Overview
Key Deliverables:
• List of Customer(s) and • QFD / CTQ Tree • Baseline of Current • List of Vital Few Xs • MSA Results on Xs
Project CTQs • Operational definition, Process Performance • Transfer Function(s) • Post Improvement
• Team Charter Specification limits, • Normality Test • Optimal Settings for Capability
• High Level Process Map target, defect definition • Statistical Goal Xs • Statistical Confirmation
(COPIS) for Project Y(s) Statement for Project • Confirmation of Improvements
• CAP Plan (Optional) • Data Collection Plan • List of Statistically Runs/Results • Process Control Plan
• Preliminary CBA, if • Measurement System Significant Xs • Tolerances on Vital • Process Owner Signoff
applicable Analysis Few Xs • Final CBA, if applicable
Tools: Survey Data Collection Plan Basic Statistics DOE Continuous Gauge R&R
Focus Groups Continuous Gage R&R Histogram Pugh Matrix Discrete Gauge R&R
Interviews Attribute Gage R&R Dot Plots New Process Mapping Control Charts
ARMI, Stakeholder Sample Size Calculator Box and Whisker Plots FMEA on new process Hypothesis Testing
Analysis Other ______________ Run Charts Process Modeling / CAP Plan
In/Out of Frame Normality Testing Simulation Control Plan
Threat vs. Opportunity Continuous/Discrete Zst, Zlt Other ______________ Other ______________
Matrix Benchmarking
Other ______________ Detailed Process Mapping
Moments of Truth
Nature of Work
Flow of Work
Fishbone
Hypothesis Testing
Regression Analysis
Other ______________
2 10/15/2022
Define
1. Blank
2. Project Charter
3. Terms and Acronyms Used
4. ARMI & Communication Plan/Why not RASIC
5. SIPOC
6. Process Map
3 10/15/2022
Define
Maheh kumar we are facing our CD manufacturing cycle time Reduce cycle time .
Ajay Kumar choudhari Customer not received product on time . Reduce cycle time.
General manager
ABC Ltd.
Customer
4 10/15/2022
Project Charter Define
5 10/15/2022
Terms and Acronyms Used Define
Definitions:
Indicators Definition
6 10/15/2022
ARMI & Communication Plan Define
ARMI Worksheet
Key Stakeholders Define Measure Analyze Improve Control
Stakeholders-CEO
I I I I I
Sponsor-VP
A A I A A
Hod of production
I i I I I
Quality head
I R I I I
BB
I A M/A M M
Team Members
I R R I I
Communication Plan
Message Audience Media Who When
Project Status
Leadership E Mail BB Weekily
Tollgate Review VP,BB,HOD PROD.,HOD E mail conference calls
BB As per project plan
QUALITY, meetings
Project Deliverables or E mail conference calls
Activities
MEMBERS meetings BB/MEMBER WEEKILY
ABC Ltd. Disc dryer Dry the disc in the production production
dryer
8 10/15/2022
Measure
9 10/15/2022
Data Collection Plan Measure
To reduce Disc cycle time More then 300 300 sec. Usl (300 sec.) weekly
cycle time. should not be c/s per disc.
more than 300
seconds.
10 10/15/2022
Measurement System Analysis Measure
Minitab Descriptive Stats
Gage R&R
Rule Rule Description Acceptable Result
%Contribution
Source VarComp (of VarComp)
Total Gage R&R 0.2 0.00
Repeatability 0.2 0.00 R&R % of
A 0.25% ok
Reproducibility 0.0 0.00 Tolerance
oper 0.0 0.00
Part-To-Part 25932.1 100.00
Total Variation 25932.3 100.00
11 10/15/2022
Measurement System Analysis
Measure
12 10/15/2022
Process Capability Measure
13 10/15/2022
Measure
14 10/15/2022
Analyse
15 10/15/2022
Identify Potential Xs Analyse
Normality Study
Since p -value is less than 0.05, hence the data is not normal.
17 10/15/2022
Interesting, right?
This is just a sneak preview of the full presentation. We hope you like it!
To see the rest of it, just click here to view it in full on PowerShow.com.
Then, if you’d like, you can also log in to PowerShow.com to download
the entire presentation for free.
18 10/15/2022