Professional Documents
Culture Documents
BS-200E Service Training - EN V1.0
BS-200E Service Training - EN V1.0
Service Training
• Analyzing unit
• Operation unit
• Output unit
Preparation
Unpacking
Adjustment
• Reagent disk
( ) Positions: 40
20ml or 40ml Mindray bottles
• Sample disk
( ) positions 40
Micro sample cup, Centrifugal tube,
Collection tube, and Plastic tube.
10 cuvettes/segment
Cuvettes are different
from BS200
8 segments
Total: 10 X 8
H-direction home
position sensor
H-direction motor
V-direction motor
Home position
sensor
Code Sensor
Home Position
Sensor
Position sensors
Power Drive Board
Sensors in tanks
Pump/Valve Drive
Auto Wash Temperature
Board
Collection Board Main
Board
Reaction Disk Temperature Refrigeration Board
Collection Board
PC
Mindray - A global partner you can rely on
Main Board-Jumper
Service Policy → Mechanical Structure → Hardware system → Temperature system → Liquid system → Optical system → Test results → Software → Maintenance
Main Board
12V&5V Board
Pumps/Valves 12V
Reagent
DC motor
preheater
12/5V
4 Reaction 2 Peltiers
disks fans
Refrigeration Refrigeration
Lamp fan
board Temp. Sensor
Board Fan
2 Peltier Fan
Main board
Reaction fan feedback
Fog proof of
barcode
• Functions:
Reagent Refrigeration: Power for 2 peltiers; 2 peltier fans;
Power for Fans: 4 reaction disk fans; lamp fan; drive board fan;
Fans feedback from reaction disk to main board.
Barcode Fog-proof.
Description
Meaning Marker Color
On Off
12V goes
12VLED Green 12V supply normally
wrong
Power supply
12VFAN supply 12VFAN
12VFAN_LED Green
normally supply wrong
Peltiers supply Peltiers supply
Peltiers PELTIER_LED Green
normally go wrong
FAN1_LED Red
Corresponding
Reaction Disk FAN2_LED Red Corresponding fan
fan works
4 fans FAN3_LED Red goes wrong
normally
FAN4_LED Red
Refrigeration Refrigeration
GREEN_LED Green temperature is temperature is
within 0-15℃ beyond 0-15℃
Refrigeration Refrigeration
Refrigeration
YELLOW_LED Yellow temperature is temperature is
temperature
below 0℃ above 0℃
Refrigeration Refrigeration
RED_LED Red temperature is temperature is
above 15℃ below 15℃
• AC Input
• -110V/220V AC
• -50/60±3Hz
• Output
• -Main board (12/5V)
• -Power drive board (24/12/5V)
• -Refrigeration board (12V)
• -ISE power board (Optional) (12V)
• -Reaction disk heaters (AC110/220V)
• -Lamp (12V)
• -Fan(s) (12V)
24V PFC 12V&5V
BOARD BOARD BOARD
Lamp A12V
390V
PFC Board AC Input
VDD VDD
Input
AC
390v
12V&5V Board C12v/5v
Signal
24V Board
C12V/5V
B12V 12VFAN
24V
B12V
Input
Power Drive
AC
ISE Power
board Board signal
Heater of
Refrigeration board
Signal
Signal
reaction tray
Input
Pump/Valve
AC
Signal
drive board
Signal Main Board
Wash Solution/Water
Heater Operation
Mindray - A global partner you can rely on Software
PFC Board
Service Policy → Mechanical Structure → Hardware system → Temperature system → Liquid system → Optical system → Test results → Software → Maintenance
P1 AC input
P4
390V output P6 Lamp control signal
P2 VDD P5 Output for lamp
• AC/DC conversion, supplying the +390V and VDD voltage to 24V board and 12V&5V board;
• Supplying stable 12V(4.5A) voltage for the ( );
• Lampunit switch.
Control the C12V, 5V and 24V outputs through the analyzing
• AC output?
P404 AC input
P301 390V
input
P302 VDD
input
Caution: Working Voltage for LLD is 3.8V, the LED “ADJ” is always on after startup.
Note: 1. Click Reset manually only after probe or LLD Board replacement.
2. Compatible with old version.
A
C
d
Reagent
Auto wash
12/5V board
B12V
B12V
Refrigeration board Temp Signal
25℃ :
5KΩ
Temp signal
24V
25℃ : 1K ohm
Preheat heater
Overheat protector 24V Temp Transducer
Control signal
Reaction DiskTemp
AC 24V Board Sampling Board
(Transmit the AC
220V/110V without conversion)
AC 220V/110V
Overheat Temp.
Switch
Heater Temp Sensor
Temp
Protector
Fan
Control signal
AC 220V/110V
Overheat Temp.
Switch
Heater Temp Sensor
Collect temp signals from the preheater/environment, and then converts them
into digital signals
Transmit the signal to Main Board
Phase 1:detergent
Phase 2:detergent
Phase 3:
Phase 4:
Water
Phase 5:
Phase 6:
Phase 7:
Phase 8: Dry out
Phase 1 Phase 8
Short tube
Long tube
Main Board
PDA module
(Pre-amprefication Board)
Cuvette
Fibre
Lamp
A/D Board:
Adjust electric signals and convert to digital signal
Transmit digital data to Main board.
PC
TP1
GND
Sampling signal
Voltage
B: Indicate the
time of Data
sampling.
A: Photoelectric By Oscilloscope
signal of a certain
wavelength.
Main Unit
Control software
Analyzer
• Click the button “Setup”, and then input bs200 in the blank of popup
window, you can access advanced interface
• Functional Unit
Main Unit
Mixing Unit
Reagent Unit/ Sample Unit
Temperature control Unit
Reaction Unit
Clean Unit
• Upgrade
Check connection of tubes Check if tubes are twisted, bent, or any leakage?
Irregular
Remove bubble in syringe
Jack
1.0 William 10/8/2010
Thomas