NLAGC – QA & QC BRIEF for Aug & Sep 2022
Site Quality Lab is operational since 30 Aug 2022
Total 4 quality staff from OCEAN and 3 quality staff from Hightech Lab present at site
Quality lab is operational in both shifts
No of Quality non-conformities in field tests – nil (details in upcoming slides)
No of Quality non-conformity in re-bar steel – nil (details in upcoming slides)
Third party test results of materials used at site – passed
Total number of trial mixes conducted – 19 nos (till 30 Sep 2022)
All inhouse equipment calibration – Done
TRAIL MIX DETAILS
I TRAIL MIX
Sl. No BRAND OF CEMENT DATE OF TRAIL GRADE RATIO VENDOR PROPORTIONS REMARKS
1Ultratech (OPC 53) 07-09-2022M50 70;30 Ratio Ultratech plant Ultratech mix Proportions
2Dalmia (OPC53) 16-09-2022M30 50;50 Ratio Sun x Plant Pile
3Dalmia (OPC53) 16-09-2022M50 70;30 Ratio Sun x Plant Client mix Proportions
4Dalmia (OPC53) 16-09-2022M40 70;30 Ratio Sun x Plant Client mix Proportions
5Dalmia (OPC53) 20-09-2022M30 70;30 Ratio Sun x Plant Client mix Proportions
6Dalmia (OPC53) 20-09-2022M25 70;30 Ratio Sun x Plant Client mix Proportions
7Dalmia (OPC53) 20-09-2022M20 70;30 Ratio Sun x Plant Client mix Proportions
8Dalmia (OPC53) 20-09-2022M10 70;30 Ratio Sun x Plant Client mix Proportions
9Zuari (OPC 53) 26-09-2022M40 70;30 Ratio Sun x Plant Client mix Proportions
10Zuari (OPC 53) 26-09-2022M50 70;30 Ratio Sun x Plant Client mix Proportions
11Ultratech(OPC 53) 28-09-2022M40 70;30 Ratio Ultratech mix Proportions
12Dalmia (OPC53) 29-09-2022M40 70;30 Sun x Plant sunx mix proportions
13Dalmia (OPC53) 29-09-2022M50 70;30 Sun x Plant sunx mix proportions
14Zuari (OPC 53) 29-09-2022M40 70;30 Ratio Sun x Plant sunx mix proportions
15Zuari (OPC 53) 29-09-2022M50 70;30 Ratio Sun x Plant sunx mix proportions
16Ultratech(OPC 53) 30-09-2022M40 70;30 Ratio Sun x Plant sunx mix proportions
17Ultratech(OPC 53) 30-09-2022M50 70;30 Ratio Sun x Plant sunx mix proportions
18Dalmia (OPC53) 30-09-2022M30 70;30 Sun x Plant Pile
19Dalmia (OPC53) 30-09-2022M30 70;30 Sun x Plant Client mix Proportions
TRAIL MIX COMPRESSION STRENGTH RESULT
TRIAL MIX Details
ACT 7 DAYS 28 DAYS
Maximoplast PC 17-09-2022 23-09-2022 14-10-2022
300-Asian
1Sun X (Dalmia OPC 53) Chemicals M30 280 120 640 461 788 165 0.52% 2.080 0.41370:30 16-09-202242.24 map 32.75 map Sun X Pile
Maximoplast PC 17-09-2022 23-09-2022 14-10-2022
300-Asian Clint
2Sun X (Dalmia OPC 53) Chemicals M50 335 140 617 444 775 160 0.52% 2.470 0.33770:30 16-09-202258.62 map 39.18 map Sun X Requrement
Maximoplast PC 17-09-2022 23-09-2022 14-10-2022
300-Asian
3Sun X (Dalmia OPC 53) Chemicals M40 310 130 649 467 751 160 0.52% 2.288 0.36470:30 16-09-202240.68 map 30.70 map Sun X
Maximoplast PC 21-09-2022 27-09-2022 18-10-2022
300-Asian
4Sun X (Dalmia OPC 53) Chemicals M30 240 100 646 465 845 160 0.55% 1.870 0.47170:30 20-09-202235.51 Map 30.07 Map Sun X
Frush proputy
Maximoplast PC 21-09-2022 27-09-2022 18-10-2022 failed even
300-Asian
Sun X after
initial
5Sun X (Dalmia OPC 53) Chemicals M25 210 90 646 465 880 160 0.55% 1.650 0.53370:30 20-09-202233.08 Map 24.47 Map collapsa with
Maximoplast PC 21-09-2022 27-09-2022 18-10-2022 bluding .
300-Asian
Sun X Hence
cube
6Sun X (Dalmia OPC 53) Chemicals M20 190 80 643 463 912 160 0.55% 1.485 0.59370:30 20-09-202226.97 Map 20.14 Map not casted
Maximoplast PC 21-09-2022 27-09-2022 18-10-2022
300-Asian
7Sun X (Dalmia OPC 53) Chemicals M10 140 60 626 441 1012 160 0.75% 1.500 0.80070:30 20-09-2022 Sun X
Sika 348X-Sika 03-10-2022 24-10-2022 Clint
8Sun X (Zuari OPC 53) Chemicals M40 285 120 638 459 801 160 0.80% 3.240 0.39570:30 26-09-2022 27-09-2022 Sun X Requrement
Sika 348X-Sika 03-10-2022 24-10-2022 Clint
9Sun X (Zuari OPC 53) Chemicals M50 335 140 617 444 775 160 0.80% 3.800 0.33770:30 26-09-2022 27-09-2022 Sun X Requrement
Ultratec 29-07-2022 04-08-2022 25-08-2022Ultrtec
10 ADMSPLAST M40 300 130 655 436 811 155 0.46% 1.978 0.36070:30 28-07-2022 36.92 mpa h
Maximoplast PC 06-10-2022 27-10-2022
Sun X (Dalmia OPC 53) 300-Asian
11 Chemicals M40 310 130 649 467 751 160 0.52% 2.288 0.36470:30 29-09-2022 38.35mpa Sun X
Maximoplast PC 06-10-2022 27-10-2022
Sun X (Dalmia OPC 53) 300-Asian
12 Chemicals M50 380 160 645 464 657 165 0.51% 2.754 0.30670:30 29-09-2022 45.91mpa Sun X
Maximoplast PC 06-10-2022 27-10-2022
Sun X (Zuari OPC 53) 300-Asian
13 Chemicals M40 310 130 649 467 751 160 0.55% 2.420 0.36470:30 29-09-2022 41.25mpa Sun X
TRAIL MIX COMPRESSION STRENGTH RESULT
TRIAL MIX Details
ACT 7 DAYS 28 DAYS
Maximoplast PC 07-01-1900 28-01-1900
Sun X (Zuari OPC 53) 300-Asian
14 Chemicals M50 380 160 645 464 657 165 0.58% 3.132 0.30670:30 Sun X
Maximoplast PC 08-10-2022 29-10-2022
Sun X (Ultratech OPC 53) 300-Asian
15 Chemicals M40 310 130 649 467 751 160 0.62% 2.728 0.36470:30 01-10-2022 28.61 mpa Sun X
Maximoplast PC 07-10-2022 28-10-2022
Sun X (Ultratech OPC 53) 300-Asian
16 Chemicals M50 380 160 645 464 657 165 0.55% 2.970 0.30670:30 30-09-2022 39.82mpa Sun X
Maximoplast PC 07-10-2022 28-10-2022
Sun X (Ultratech OPC 53) 300-Asian M30
17 Chemicals pile 280 120 640 461 788 165 0.55% 2.200 0.41370:30 30-09-2022 31.39mpa Sun X
07-10-2022 28-10-2022
Sun X (Ultratech OPC 53) Sika 348X-Sika
18 Chemicals M30 280 120 640 461 788 165 0.55% 2.200 0.41370:30 30-09-2022 25.71mpa Sun X Pile
CONCRETE COMPRESSION STRENGTH (internal test)
CONCRETE COMPRESSION STRENGTH (internal test)
II
GRADE OF
Sl. No CONCRETE DATE OF TEST PILE NUMBER 7 days 14 days 28 days SLUMP(mm) REMARKS
1M30 PILE 01-09-2022
2M30 PILE 02-09-2022P11,P6 32.29 39.99 43 160
3M30 PILE 03-09-2022
4M30 PILE 04-09-2022
5M30 PILE 05-09-2022P7,10 33.92 43.44 49 170
6M30 PILE 06-09-2022P5,8 33,32 42,40 44,46 170
7M30 PILE 07-09-2022P49,12 34,30 43,37 48,45 180,165
8M30 PILE 08-09-2022P9,46 34,35 36,39 40,46 160,160
9M30 PILE 09-09-2022P13,48 32,36 41,38 46,46 170,170
10M30 PILE 10-09-2022P4,44 31,30 41,35 175,180
11M30 PILE 11-09-2022
12M30 PILE 12-09-2022P43 28 35 155
13M30 PILE 13-09-2022P14 31 36 150,150
14M30 PILE 14-09-2022P47,41 25,30 30,33 140,160,
15M30 PILE 15-09-2022P3,36,31 32,31,27 37,38,32 160,170,160
42,36,34,3
16M30 PILE 16-09-2022P1,45,37,33 4 42,42,41,42 175,180,160,180
17M30 PILE 17-09-2022
18M30 PILE 18-09-2022
19M30 PILE 19-09-2022P2,15 32,39 41,46 15,1800
36,27,27,3
20M30 PILE 20-09-2022P22,40,28,16,42 3,34, 43,35,35,37,41 160,180,175,155,160
33,33,33,3 39,39,37,39,40,4
21M30 PILE 21-09-2022P30,32,35,18,27,39 3,33,33, 0 180,165,175,180,160,155
22M30 PILE 22-09-2022P17,TP2A,38 37,35,43 44,39,43 160,170,170,
31,36,34,3
23M30 PILE 23-09-2022P25,20&25,20,29,34 4,35 45,39,42,44,47 150,170,155,175,170
31,36,34,3
23M30 PILE 23-09-2022P25,20&25,20,29,34 4,35 45,39,42,44,47 150,170,155,175,170
24M30 PILE 24-09-2022P26 33 170
25M30 PILE 25-09-2022P24,DP 32,27 170,180
26M30 PILE 26-09-2022
27M30 PILE 27-09-2022
28M30 PILE 28-09-2022P23 33 170
29M30 PILE 29-09-2022P21 35 150
30M30 PILE 30-09-2022P19 34 150
31M30 PILE 01-10-2022
32M30 PILE 0
ON SITE TESTS
IV SITE INSPECTION
Sl. No DESCRIPTION Date of inspection TEST PILE
MATERIAL TESTING
V
Sl. No DESCRIPTION MATERIAL INSPECTION DATE REPORTS TEST REMARKS
1 Soil (MDD) 01-10-2022 Proctor Compaction Test 1 no test Ocean in house lab
2 Soil (FDD) 01-10-2022 Core Cutter 2 no test Ocean in house lab
3 STEEL(Fe-550D Jsw) 15-10-2022
4 WATER 15-10-2022
METHODOLOGY
VII METHODLOGY
Sl. No
DESCRIPTION APPROVAL DATE
1
REINFORCED CEMENT CONCRETE 29-09-2022
2
PILE CAP 29-09-2022
3
ANTI TERMITE 29-09-2022
4
INITIAL LOAD BY CYCLIC METHOD 29-09-2022
5
PILE INTEGRITY TEST 29-09-2022
6
7
8
9
CALIBRATION
CERTIFICATES ATTACHED TO THE MAIL
CALIBRATION CALIBRATION ON
S.NO DESCRIPTION MAKE RANGE/MODEL CERTIFICATE NO SRF NO/ SERIAL NO REMARKS
CALIBRATION DUE DATE VENDOR
DATE
TOPCON CORPORATION,
1 ELETRONIC TOTAL STATION JAPAN IM105 4207150254-0242 ZS007506 15-07-2022 14-07-2023 SOKKIA
2 SITE NOTES 4
09-09-2022
1.Methodology 08-09-2022
QOc1022ANA:11-616-1.jpg :
QOc1022ANA:1-413-1.jpg :
QOc1022ANA:1-967-2.jpg :
QSe922ANA:1-579-1.jpg :
QSe922ANA:1-401-2.jpg :
Q9/922ANA:1-179-1.jpg :
Q9/922ANA:1-500-2.jpg :
QSe922ANA:1-600-1.jpg :
QSe922ANA:1-755-2.jpg :
Prayer tower pilling work, it was observed in
P46 pilling bore activity work started without
survey checking and sign off, hence it is treated
Non- Prayer tower as non conformity.
QSe922ANA:1 Conformity Methodology pilling work Closed 08-09-2022 20:11Anandan G 09-09-2022 18:13
(NC)
QSe922ANA:1-806-1.jpg : Survey checklist not
signed off.
QSe922ANA:1-237-1.jpg :
Rebar not coverd with tarpaulin,
inspite of several follow-ups until
exposed condition only
Specificati
QAu822ANA:5 Observatio on Rebar at QAu822ANA:5-737-1.jpg : Closed 30-08-2022 21:39 Anandan 06-09-2022 16:50
n steel yard G
Deviation
QAu822ANA:5-426-2.jpg :
QSe922ANA:-295-1.jpg :
QSe922ANA:-998-2.jpg :
QAu822ANA:1-197-2.jpg :
QAu822ANA:-952-1.jpg : Double
knots double wire done. Compliance
image
Site Note - Non-Conformity (NC)
NewLife-CHN-Public Infrastructure-New Build-Design Peer review &
Project
Construction Management
Package Civil
Vendor Ocean Lifespaces India Pvt. Ltd.
QC Type Non-Conformity (NC)
QC Category Material Quality
Location Pile rebar cages at yard
Despite of several follow-ups until action not take,(partialy covered) Due
to the exposed condition and not properly covered with tarpaulin sheet. All
Description
tied GI Wires has been corroded. Hence its non conformity.
QOc1022ANA:11-616-1.jpg :
Corrective Action Stopped work & called contractor for correction
Preventive Action Proper site preparation
PILE REBAR CAGES AT YARD
STORED AND COVERD PROPERLY
CONCRETE QUANTITY ISSUES AND
CORRECTION
THEORE
PILE SIZE ORDER QTY TICAL Excess ACTUAL QTY balance
SL NO PILE NO DATE TIME AS informed by concrete as per REMARKS How to ensure whether the pile is complete
in m cum QTY ordered Qty CBRE CBRE
cum
• Audits must be done from time to time as a part of your quality management plan.
Checking, again and again, ensures that items or structures have been constructed
in the right manner. There may be cases that some discrepancies may be found,
this indicates correction. If you consistently check the work in progress, issues
would be highlighted early, allowing you to correct them now. If these checks are
made at the end, correcting t
• Lastly, if these checks get ignored, work remains substandard. Hence be very
cautious.hem would be impossible