AC Water

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 2

Lean Tracker No: Kaizen

Project Name: Admin building AC Condensed water collecting and effective


utilization.
Dept. : Plant Engineering
Date Completed : 8.09.2022
Member 1 E No: 10009337 Name: Pradeep M Dept: PE
Member 2 E No: 10000763 Name: Bhanuprakash K Dept: PE

Note : Max Team Members: 2 * GreenCo impact – conservation of


* PCD marking is mandatory
Productivity Cost Delivery Water Energy Material
Saving
73000L/Y
21630/Y
Problem Measures Taken Results
Admin AC condensed Provided the AC 1) Underground
water was getting Drain condensed water (borewell) water
collection tank and AC pumping reduced so
drain water line drop to reduction in Energy.
collection tank , and
2) Effective utilization
water will be pumped
of AC condensed
Automatically to Raw
water,
water tank when water
full in collection Tank.

Diagram / Photo
Before After

NA

HOD’s sign : Date:


Kaizen Format, Rev: R1, Date: 22-Jan-19
AC water collection/day in Liter 200
AC water collection/month in Liter 6000
AC water collection/year in Liter 73000
cost for Raw water/liter in rupees 0.3

Total cost saving/year by AC water collection 21629.9

Motor Capacity in KW 0.37


Motor LPH 750

Ammount of water to be lift to Raw water tank/day


in liter 200

time taken to lift 200 Liter water in hr 0.266667


power cunsumption/day in units 0.098667
power cunsumption/year in units 36.01333

power cost/year to lift 73000 liter in rupees 270.1

Kaizen Format, Rev: R1, Date: 22-Jan-19

You might also like