Professional Documents
Culture Documents
(A) Introduction Ct01-LM
(A) Introduction Ct01-LM
(A) Introduction Ct01-LM
Control Cabin/Console
Tubing Reel
Injector head
BOP/Stripper
Lifting Equipment
Dowell Worldwide Distribution - CTU’s
NAM 46
LAM 23
Africa 20
Europe 32
Far East 10
Mid East 17
R&D 1
Training 2
Sheet Alloy
SHEET ALLOY
ROLLERS
Rollers PRESSING
pressing sheet into
SHEET INTO TUBE
tube
Pipe Section Criteria
Good quality control
Reasonable strength
Ductility
Corrosion resistance
Field repairable
Meets industry specs
Cheap
Stress Strain Diagram
B
D
A PLASTIC REGION
C
STRESS (G)
ELASTIC REGION
STRAIN (E) E
Tubing Integrity Monitor
1.29"
1.27"
MAX
AVG 1.25"
MIN
1.23"
1.21"
40
LIFE OF
COILED 30
TUBING %
20
10
0
0 2000 4000 6000 8000 10000