(A) Introduction Ct01-LM

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 12

 Prime Mover

 Control Cabin/Console
 Tubing Reel
 Injector head
 BOP/Stripper
 Lifting Equipment
Dowell Worldwide Distribution - CTU’s
NAM 46
LAM 23
Africa 20
Europe 32
Far East 10
Mid East 17
R&D 1
Training 2

Total Units 151*


* most ctu’s worldwide
Coiled Tubing Applications
 Wellbore Cleanouts (Liquids,Nitrogen,Foam)
– Jetting/Motors (linear or rotary)
 Cementing
– Squeeze/Plugback
 Stimulation
– Selective/Non-Selective
 Sand Control
– Consolidation/Gravel Packing/Screens
 Nitrogen Injection
– Flow Initiation/Zone Evaluation
 Fishing or “StiffLINE” (non-wired)
– Downhole Flow Controls/Junk Retrieval
Coiled Tubing Applications
 Wired Services (CTL)
– Logging/Perforating/DSP
– Vertical/Deviated/Horizontal
 Completions (CTC)
– Velocity/External Upset/”SPOOLABLE”
– Artificial Lift/Remedial/CTD
 Drilling (CTD)
– New or Re-entry
– Completion Removed or Thru-tubing
– Vertical Deepening or Sidetracking
– Balanced or Underbalanced
Coiled Tubing Advantages
 Shorter Mobilization
 Quicker Rig-up
 Less Crew Required
 Live Wells
 Faster Trips
 Lower Environmental Impact
 Lower Costs
Dowell Commitment
 Recognized Technical Leader
 Develop “Next Generation” CTU
 Develop full job simulation capability
 Develop “Intelligent & Advanced” tool systems
– DSP
– CTDHA
– CTLH/SAFE/CIRP
– INFLATABLE PACKERS
– CoilCAT
 Formalized training and procedures
How Tubing Is Made

Weld surface finished and


WELD SURFACE FINISHED
heat treated
AND HEAT TREATED
In lineSEAM
IN-LINE seam WELDING
welding

Sheet Alloy
SHEET ALLOY

ROLLERS
Rollers PRESSING
pressing sheet into
SHEET INTO TUBE
tube
Pipe Section Criteria
 Good quality control
 Reasonable strength
 Ductility
 Corrosion resistance
 Field repairable
 Meets industry specs
 Cheap
Stress Strain Diagram

B
D

A PLASTIC REGION
C

STRESS (G)

ELASTIC REGION

STRAIN (E) E
Tubing Integrity Monitor

1.29"

1.27"
MAX
AVG 1.25"
MIN
1.23"

1.21"

absolute scale: ON 1.251" .080" PO


CoilLIFE
50

40

LIFE OF
COILED 30
TUBING %

20

10

0
0 2000 4000 6000 8000 10000

DISTANCE FROM DOWNHOLE END OF COILED TUBING - ft


Current life
Previous Life
+ Weld location
162:14

You might also like