발표일 : 2022 年 11 月 05

(ISIR)
Initial Sample Inspection Report

QUALITY ASSURANCE TEAM


ECOCABLE

Rev.00 업무매뉴얼 1
1/21
Contents

Contents Subtopics Importance Status

1. History 0 9 100%

2. Work flow 0 9 100%

3. Manual 0 10 100%

4. Check Sheet 0 9 100%

Rev.00 업무매뉴얼 2
2/21
업무 매뉴얼 Revision 계획
◈ : 완료 : 계획 :
Revision
일 정 표
기 본 업 무 요 소 업 무
11 월 2월 4월 6월 8월 10 월 비 고

-ECO, drawing, program Engineering


1. Data reception level history, Sublist, Usage and ◈
Milestone.

2. Structure Analysis - ◈

-Inspection agreement and Inspection


3. Inspection agreement
standard ◈

-Control Plan, PQR, Material test


4. LP1 part verification
reports and Inspection report

-Reliability test reports and Inspection


5. LP2 part verification
report.

6. Process audit -Self-ssessment and audit results ◈

7. Assembly validation - ◈

-ECO, drawing, inspection agreement,


8. ISIR approval FMEA, IMDS, test planning, reliability ◈
test reports

9. Full CAPA check -CAPA analysis results ◈

Rev.00 업무매뉴얼 3
3/21
(ISIR) Creation
MANUAL
Rev. 00

QUALITY ASSURANCE TEAM

Rev.00 업무매뉴얼 4
4/21
- 목 차 -
1. History

2. Flow

3. Manual

Rev.00 업무매뉴얼 5
5/21
1. History

NO HISTORY DATE ELABORO REVISO APROBO

1 New Release 22.11.10 Yadira M Felipe R Gabriel M

Rev.00 업무매뉴얼 6
6/21
2. Flow

New Program

1 5
Data reception. LP2 part verification

2 6
No Customer Approved
Structure analysis Process audit
ISIR?

3 7 Yes

Inspection Agreement Assembly validation


9
Full CAPA check

4 8
LP1 part verification ISIR Approval

Rev.00 업무매뉴얼 7
7/21
3-1. Manual

업 무 내 용 상세내용

1. Data Reception

1.1 Technical data is received


through email from Kr team.
Documents included:
*ECO
*Drawing
*Program Engineering Level
history
*Sublist
*Usage
*Milestone

Rev.00 업무매뉴얼 8
8/21
3-1. Manual

업 무 내 용 상세내용

1.1 ISIR in QMS portal

1.1.1 the Initial Sample Inspection


Report is created in the QMS
portal for each new project.

1.1.2 The ISIR contains 8 steps


and these start from the
beginning of the project to the
mass production phase.

These two steps are


exclusive to projects for
divisions other than
Wiring.

Rev.00 업무매뉴얼 9
9/21
3-1. Manual

업 무 내 용 상세내용

2. Structure analysis

2.1 The first step is divided into


two parts, the first refers to the
master schedule

2.2 The second step refers to a


brief analysis of the structure of
the harness, in this step the first
quality findings found in the
already prepared samples are
recorded.

Rev.00 업무매뉴얼 10
10/21
3-1. Manual

업 무 내 용 상세내용

3. Inspection Agreement

3.1 The second step refers to the


harness inspection, the first part
asks the inspection agreement,
this document stipulates the
frequency of the reliability and
material test have to be perform
according to harness drawing.

3.2 The second part asks for the


Inspection Standard which
establishes all aspect that have to
be inspected in Visual inspection.

3.3 The third part establishes the


way to harness have to be
inspected by the Customer in
Incoming Inspection.

Rev.00 업무매뉴얼 11
11/21
3-1. Manual

업 무 내 용 상세내용

4. LP1 parts verification

4.1 The third step requests,


control plan, the first material
tests reports and inspection
report.

4.2 Also asks submit the Part


Quality requirement report its
results

Rev.00 업무매뉴얼 12
12/21
3-1. Manual

업 무 내 용 상세내용

5. LP2 parts verification

5.1 In LP2 phase have to be


perform a second verification

5.2 All the Reliability test report


have to be completed to submit
the documents in QMS portal.

Rev.00 업무매뉴얼 13
13/21
3-1. Manual

업 무 내 용 상세내용

6. Process audit
6.1 The fifth step refers to the audit
2/3rd Registration process, where the results of an
audit prior to the sixth step of the
ISIR are shown, The fifth step
refers to the audit process, where
the results of an audit prior to the
sixth step of the ISIR are shown,
this is divided into 3 parts, in the
first the corresponding harness part
Self-evaluation of numbers are recorded
partner company

6.2 In the second part, a self-


assessment is performed and the
self-assessment report is submitted

Comprehensive 6.3 The last part of the step


evaluation results corresponds to the results of the
integral evaluation, this part is
filled out by the client where he
issues the qualification obtained in
the previous audit

Rev.00 업무매뉴얼 14
14/21
3-1. Manual

업 무 내 용 상세내용

7. Assembly
validation

7.1 In the sixth step we can find


the part of the validation of the
harness assembly, where it is
verified that all the equipment
and tools necessary for the
harness assembly are available
and that it are in good condition.

Rev.00 업무매뉴얼 15
15/21
3-1. Manual

업 무 내 용 상세내용

8. ISIR Approval
ISIR approval
8.1 The penultimate step of the
ISIR is divided into three parts,
in the first we find the
compilation of documents and
requirements with which the
harness must comply in the SOP
stage

8.2 the second part we find again


the Inspection agreement
Inspection
agreement
8.3 In the last part, the reliability
test reports are attached in
accordance with the inspection
agreement of the second part of
step 7 of the ISIR

Rev.00 업무매뉴얼 16
16/21
3-1. Manual

업 무 내 용 상세내용

9. Full CAPA check


9.1 Finally, this step refers to the
results of capacity studies
resulting from the audit of step
#5.

This step concludes the Initial


Sample Inspection Report