Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 19

BHIKAJI CAMA

PLACE
SOUTH DELHI

RAJ REWAL & KULDEEP


SINGH

36 ACRES

2
SURROUNDING LAND USE

RESIDENTIAL

COMMERCIAL

MIXED-USE

INSTITUTIONAL

HISTORICAL

URBAN VILLAGE

SEVICES

https://cargocollective.com/eighty8/Urban-Design-Bhikaji-Cama-Place-New-Delhi
3
BUILT-OPEN RELATIONSHIP

BUILT

GREEN

SITE

https://cargocollective.com/eighty8/Urban-Design-Bhikaji-Cama-Place-New-Delhi
4
TRAFFIC MOVEMENT

PEDESTRIAN
TRAFFIC

VEHICULAR
TRAFFIC

https://cargocollective.com/eighty8/Urban-Design-Bhikaji-Cama-Place-New-Delhi
5
BUS STOPS

1. HYATT HOTEL
[1.1 Km]
2. HYATT HOTEL
(GAIL) [400m]
3. GAIL BHIKAJI
CAMA PLACE
[300m]
1 2
4. R.K. PURAM
3 7
CROSSING
[750m]

5 5. BHIKAJI CAMA
4
6 PLACE [300m]
6. BHIKAJI CAMA
PLACE [700m]

7. AFRICA
AVENUE [650m]

http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 6
ACTIVITY MAPPING

BUS STOP

PARKING

IPT PICK/DROP

STREET VENDOURS

PUBLIC AMENITIES

http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 7
FOOTPATH AVAILABILITY
FOOTHPATH
PRESENT

FOOTPATH
ABSENT

FOOTPATH
<1800mm

FOOTPATHS
PRESENT
86.6%
FOOTPATHS
PRESENT
79.0%

http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 8
MAJOR WALKABILITY ISSUES

http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 9
AMENITIES MAPPING

BUS STOP

DUSTBINS

TOILETS

http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 10
PEDESTRIAN PATHWAYS DO NOT PTOVIDE SAFE
AND UNIFORM ACCESS

NO KERB-CUTS & HIGH PEDESTALS FORCING OLD PEOPLE TO WALK ON THE MAIN ROAD

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
11
HUGE LEVEL DIFFERENCES IN PEDESTRIAN
PATHWAYS ALONG THE RING ROAD

PEDESTRIAN PATHWAYS HAVE LEVEL DIFFERENCES AND ARE HIGH WITH NO KERB-CUS

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
12
ARBITRARY STOPPING OF BUSES ANYWHERE
INSTEAD OF DESIGNATED BUS STOPS ENDANGERS
THE LIFE OF COMMUTERS

BUSES STOP ANYWHERE ON THE ROAD ENDANGERING THE LIVES OF PEDESTIRANS

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
13
DISCONTUNITY AND LACK OF MAINTENCE OF
PATHWAYS

DIRTY AND BROKEN PATHWAYS

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
14
DILAPIDATED PEDESTRIAN PATHWAYS

PATHWAYS IN NEED OF URGENT REPAIR

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
15
ENCROACHMENTS ON PEDISTRIAN PATHWAYS ON
MAHATAMA GANDHI MARG

WALKWAYS HAVE BEEN BLOCKED BY SIGNAGES AND PARKED CARS POSING AN ISSUE FOR
PEDESTRIANS

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
16
INTERNAL PEDESTRIAN PATHWAYS

THE PATHWAY IS REDUCED TO ONLY 300mm AT SOME PLACES WHICH IS NOT ENOUGH FOR
PEOPLE TO WALK WHICH INCREASES THE PEDESTRIAN TRAAFIC ON THE ROAD WHICH CAN
CAUSE ACCIDENTS

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
17
THE ROADS OVERFLOW WITH SEWAGE WATER
MAKING IT IMPOSSIBLE TO WALK

THE ROADS ARE UNEVEN WITH NO PROPER


DRAINAGE SYSTEM

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
18
BLOCKED STEPPED ENTRY

CARS BLOCKING THE WAY TO THE STEPPED ENTRY

https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012