Professional Documents
Culture Documents
Bhikaiji Cama Place
Bhikaiji Cama Place
PLACE
SOUTH DELHI
36 ACRES
2
SURROUNDING LAND USE
RESIDENTIAL
COMMERCIAL
MIXED-USE
INSTITUTIONAL
HISTORICAL
URBAN VILLAGE
SEVICES
https://cargocollective.com/eighty8/Urban-Design-Bhikaji-Cama-Place-New-Delhi
3
BUILT-OPEN RELATIONSHIP
BUILT
GREEN
SITE
https://cargocollective.com/eighty8/Urban-Design-Bhikaji-Cama-Place-New-Delhi
4
TRAFFIC MOVEMENT
PEDESTRIAN
TRAFFIC
VEHICULAR
TRAFFIC
https://cargocollective.com/eighty8/Urban-Design-Bhikaji-Cama-Place-New-Delhi
5
BUS STOPS
1. HYATT HOTEL
[1.1 Km]
2. HYATT HOTEL
(GAIL) [400m]
3. GAIL BHIKAJI
CAMA PLACE
[300m]
1 2
4. R.K. PURAM
3 7
CROSSING
[750m]
5 5. BHIKAJI CAMA
4
6 PLACE [300m]
6. BHIKAJI CAMA
PLACE [700m]
7. AFRICA
AVENUE [650m]
http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 6
ACTIVITY MAPPING
BUS STOP
PARKING
IPT PICK/DROP
STREET VENDOURS
PUBLIC AMENITIES
http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 7
FOOTPATH AVAILABILITY
FOOTHPATH
PRESENT
FOOTPATH
ABSENT
FOOTPATH
<1800mm
FOOTPATHS
PRESENT
86.6%
FOOTPATHS
PRESENT
79.0%
http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 8
MAJOR WALKABILITY ISSUES
http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 9
AMENITIES MAPPING
BUS STOP
DUSTBINS
TOILETS
http://uttipec.nic.in/upload/uploadfiles/files/DDA_Bikaji%20Cama%20Place_Presentation.pdf 10
PEDESTRIAN PATHWAYS DO NOT PTOVIDE SAFE
AND UNIFORM ACCESS
NO KERB-CUTS & HIGH PEDESTALS FORCING OLD PEOPLE TO WALK ON THE MAIN ROAD
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
11
HUGE LEVEL DIFFERENCES IN PEDESTRIAN
PATHWAYS ALONG THE RING ROAD
PEDESTRIAN PATHWAYS HAVE LEVEL DIFFERENCES AND ARE HIGH WITH NO KERB-CUS
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
12
ARBITRARY STOPPING OF BUSES ANYWHERE
INSTEAD OF DESIGNATED BUS STOPS ENDANGERS
THE LIFE OF COMMUTERS
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
13
DISCONTUNITY AND LACK OF MAINTENCE OF
PATHWAYS
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
14
DILAPIDATED PEDESTRIAN PATHWAYS
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
15
ENCROACHMENTS ON PEDISTRIAN PATHWAYS ON
MAHATAMA GANDHI MARG
WALKWAYS HAVE BEEN BLOCKED BY SIGNAGES AND PARKED CARS POSING AN ISSUE FOR
PEDESTRIANS
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
16
INTERNAL PEDESTRIAN PATHWAYS
THE PATHWAY IS REDUCED TO ONLY 300mm AT SOME PLACES WHICH IS NOT ENOUGH FOR
PEOPLE TO WALK WHICH INCREASES THE PEDESTRIAN TRAAFIC ON THE ROAD WHICH CAN
CAUSE ACCIDENTS
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
17
THE ROADS OVERFLOW WITH SEWAGE WATER
MAKING IT IMPOSSIBLE TO WALK
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
18
BLOCKED STEPPED ENTRY
https://www.slideshare.net/subhashvashishth/walkability-audit-bhikaiji-cama-place-nov-2012
19