NPI For Philips
NPI For Philips
NG
TPV: EVT Evaluation Meeting
OK
------------------ SIT Phase
TPV: SIT Pilot Run
System Integrated Test(30 days)
TPV QE: SIT Test To be continued
TPV Company Confidential 2004 2
Continued
OK
OK
Reject
TPV QA: OQA Sampling Inspection
Accept
4
Power reliability 25
4.1
ON/OFF cycling Test (5)
… √ √ √
… …
… … …
5 Environmental Test 40 √
6 Mechanical Test 85
* 6.5 Low Temperature Drop Test (5) √
… … … … … …
7 Hinge Test 30 √ √ √
8 Compatibility Test 40 √ √ √
9 Precision Test 40 √ √
10 Derating Test 40 √
11 Audio Test 20 √ √ √
12 ELT Test 20 √ √
13 EMC/TCO/(MPRII)/Safety 40 √
14 Safety Test 15 √ √ √
15 Open/Short Test 10 √ √
Total available scores( the item marked with"*" was not included) 555 345 475 360
EVT ≥75% ≤3
SIT ≥85% ≤1
MTBF
≥50000 N/A
(hours)
EVT ≥75% 0
Design producib
SIT ≥85% 0 TPV:IE/PE/ME Philips: RD
ility
SVT ≥90% 0
EVT ≥75% 0
Design repair
SIT ≥85% 0 Philips: CS Philips: RD
ability
SVT ≥90% 0
EVT ≥80% N/A
Design purchase
SIT N/A N/A TPV : MP Philips :RD
ability
SVT ≥90% 0