Routine Load Shedding (Upto 8 HRS) Maj Elec Breakdown (More Than 8x HRS)
Routine Load Shedding (Upto 8 HRS) Maj Elec Breakdown (More Than 8x HRS)
Rev Per
Cat Month Recoms for BTS Op Time
Routine Load Shedding (Upto 8 Hrs)
• In case of routine load shedding, recom BTS op time is 24 hrs
Maj Elec Breakdown (More than 8x Hrs)
• If dual Genset is aval at site, then ensure 24 hrs BTS op time
• However, In case of Single genset, ensure min of 16 hrs BTS Op time
A >2 Mn • To utilize aval bty backup efficiently, 4G data Svcs only may be SW off from
0200 - 0600 hrs, while 2G/3G svcs will remain aval
• 1 hr rest for Genset, after cont running of 2 hrs
Recom POL Dumping
• Sufficient POL dumping for a month at Cat A sites must be ensured
considering avg load shedding/ Genset running of last 2x months
PROPOSED SOP - MIN POWER/ NW OUTAGES - BTS SITES
Rev Per
Cat Month Recoms for BTS Op Time
Routine Load Shedding (Upto 8 Hrs)
• In case of routine load shedding, recom BTS op time is 24 hrs
Maj Elec Breakdown (More than 8x Hrs)
• If dual Genset is aval at site, then ensure 24 hrs BTS op time
• However, In case of Single genset, ensure min of 16 hrs BTS Op time
B >1 Mn • To utilize aval bty backup efficiently, 4G data Svcs only may be SW off from
0000 - 0600 hrs, while 2G/3G svcs will remain aval
• 1 hr for Genset, after cont running of 2 hrs
Recom POL Dumping
• Sufficient POL dumping for a month at Cat B sites must be ensured
considering avg load shedding/ Genset running of last 2x months
PROPOSED SOP - MIN POWER/ NW OUTAGES - BTS SITES
Rev Per
Cat Month Recoms for BTS Op Time
Routine Load Shedding (Upto 8 Hrs)
• In case of routine load shedding, recom BTS op time is 18 hrs
Maj Elec Breakdown (More than 8x Hrs)
• If dual Genset is aval at site, then ensure 12 hrs BTS op time
• However, In case of Single genset, ensure min of 09 hrs BTS Op time
C >0.5 Mn • To utilize aval bty backup efficiently, 4G data Svcs only may be SW off from
0000 - 0600 hrs, while 2G/3G svcs will remain aval
• 1 hr for Genset, after cont running of 2 hrs
Recom POL Dumping
• Sufficient POL dumping for a month at Cat C sites must be ensured
considering avg load shedding/ Genset running of last 2x months
PROPOSED SOP - MIN POWER/ NW OUTAGES - BTS SITES
AJK 4 12
Cat A (2M+) 24 Hrs 24 Hrs 16 Hrs 0200 – 0600
GB 1 12
AJK 15 10
Cat B (1M+) 24 Hrs 24 Hrs 16 Hrs 0000 – 0600
GB 25 10
Cat C (0.5M+) AJK 30 08
18 Hrs 12 Hrs 09 Hrs 0000 – 0600
GB 69 08
Cat D AJK 33 06
18 Hrs 12 Hrs 09 Hrs - 0000 – 0600
(0.25M+) GB 94 06
Cat E (0.25M AJK 124 04
14 - 18 Hrs 12 Hrs 08 Hrs - 2200 – 0600
below) GB 108 04