Final Presentation For Civil Engg
Final Presentation For Civil Engg
JAIPUR
DEPARTMENT OF CIVIL ENGINEERING
INDUSTRIAL TRAINING AT PWD J&K
SESSION 2022-23
NAME :ATUL KUMAR
SUBMITTED TO:-
Mr. MAHENDRA PRAJAPAT ROLL NO. : 19EGJCE004
DEPTT. OF CIVIL ENGG. YEAR : 4th
SEMESTER : 7th
ABOUT PWD DEPARTMENT J&K
Development of quality and extensive road network in Jammu
& Kashmir is vital, given the difficult topography, ecology and
weather conditions of the UT and limited scope for
development of alternate means of communication. A well-
developed network of roads is necessary not only for the
economic development of the UT but for its social and cultural
development. It is necessary and critical to exploit rich natural
wealth, to develop indigenous industries, to explore new
markets for farm products and to promote tourism.
PW(R&B) Department is mandated to develop a robust and
dependable road network in Jammu and Kashmir to all corners
of the UT. To this effect the Department has been focusing on
construction of new roads, maintenance and upgradation of
already existing roads, construction of bridges and culverts
and connecting habitations/ villages with the network of roads.
Major thrust is being given to the schemes providing
connectivity in difficult and inaccessible areas for equitable
development of all regions of the UT.
The Department also extends technical support to
other Government Departments and executes their
projects in case they assign construction to the
Department. It remains endeavour of the Department
to construct eco-friendly and cost-effective
government buildings adopting best evolved practices
and advanced modern techniques.
CERTIFICATE OF INDUSTRIAL TRAINING
INDUSTRIAL TRAINING
TOPICS:-
VARIOUS WORKS IN ROAD CONSTRUCTION:-
LINEAR MEASUREMENTS
LEVELLING
ESTIMATION OF MATERIAL REQUIRED
BITUMINOUS ROAD CONSTRUCTION IN JAMMU
ZONE
LINEAR MEASUREMENTS IN ROAD WORK
CHAIN SURVEYING:-
It is the branch of surveying in which distances are
measured with chain or tape and this process is called
is called "Chaining“.
TYPE OF TAPES:-
• CLOTH OR LINEN TAPE
• METALLIC TAPE
• STEEL TAPE
• INVAR TAPE
LEVELLING IN ROAD WORK:-
LEVELLING:-
• Levelling is the operation of determining elevation of
various points.
• Elevation is the height of a points above or below a reference
level called "Datum“
• BOMBAY HIGH IS THE NAME OF PLACE IN ARABIAN
SEA IT IS DATUM OF INDIA.
BASIC DEFINATIONS
BACK SIGHT:-
• BACK SIGHT IS FIRST STAFF READING TAKEN
AFTER SETTING PF INSTRUMENT ON A POINT OF
KNOWN ELEVATION.
• HEIGHT OF INSTRUMENT = R.L OF BENCHMARK +
B.S
FORE SIGHT:-
• FORE SIGHT IS LAST STAFF READING FROM
PARTICULAR SETTING OF INSTRUMENT.
• ELEVATION OF STAFF STATION =H.I –FORESIGHT
INTERMEDIATE SIGHT:-
• An Intermediate sight is defined as readings which are
taking just after back sight and before fore sight.
INSTRUMENT USED IN LEVELLING
DUMPY LEVEL :-
The dumpy level is an optical surveying leveling instrument
consisting a telescope tube firmly secured in two collars fixed by
adjusting screws to the stage by the vertical spindle.