Wireline Equipment

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 10

WIRELINE LOGGING AND PERFORATING UNIT

(a) Wireline logging truck (b) Drum & Logging Cable

1. All load supporting members must be


inspected periodically for indication of
corrosion, crack, deformation, missing
parts or other defect
2. High pressure hoses, pipings and tubings
must be inspected periodically
3. Insulation and resistance of logging cable
must be inspected periodically
4. All rotating part must be shielded
5. Electrical earthing device must work
properly
(c) Emergency Stop Engine
WELL LOGGING TOOLS
DOWNHOLE LOGGING TOOLS

 Weight indicator system must be


calibrated periodically
 Tools must have tags to show its status
( Ready, need service or damage)
PENGGUNAAN BAHAN RADIO AKTIF
PENGGUNAAN BAHAN PELEDAK
EXPLOSIVE AND RADIOACTIVE STORAGE

1. Explosive and Radioactive Sources must have Certificates


2. Explosive and radio active material must be kept in a save and remote location, far away from drilling
and residence area
3. Storage room and Cabinets must be inspected regularly

You might also like