ROUGH-CUT
CAPACITY
PLANNING
Capacity:
-manpower
-material
-machine
-tools
-transportation
(truck/MH)
-storage/
warehouse
-shopfloor
INTRODUCTION
• MRP activities do not consider capacity constraints
• A feasible MPS or known as an overstated MPS, which
causes the production flow to not run smoothly
• WIP (work-in-process) inventory is increasing
• Queue of raw materials, parts, sub-assemblies for
processing
• Leadtime increases, delivery time to consumers is
longer than it should be
INTORDUCTION
Many companies have an unstable MPS stability: how sensitive the MPS is to
schedule changes to forecast correction.
MPS, making capacity planning This relates to the determination of the
difficult safety stock policy
CASE STUDY: RCCP
Produk : X Lamp
Work station:
- Assembly - Plastic molding
- Oven - Socket assembly
- Base Forming
Lamps X
Base Socket
Shades
Assembly Assembly
Work
Center Jan Feb Mar Apr May Jun Jul
Lamp Assembly 1500 1500 1500 1500 1500 1500 1500
Oven 150 150 150 150 150 150 150
Base Forming 750 750 750 750 750 750 750
Plastic Molding 300 300 300 300 300 300 300
Socket Assembly 600 600 600 600 600 600 600
Total Requirement 3300 3300 3300 3300 3300 3300 3300
Total
Aug Sep Oct Nov Dec Hours
1600 1900 1900 1900 1900 19700
160 190 190 190 190 1950
800 950 950 950 950 9850
320 380 380 380 380 3942
640 760 760 760 760 7880
3520 4180 4180 4180 4180
BILL OF LABOR APPROACH - BOL (2)
Where:
• aik = time required by product k at the station
work i
• bkj = number of products k to be produced in
period j
BOL : 2 TYPES OF PRODUCTS, 2
MONTHS, 2 WORKSTATIONS
• If the number of products is more than one, the
standard time for each product in each
workstation must be known
• The required capacity for each workstation is
the sum of the requirements for all products
• A
BOL : 2 TYPES OF PRODUCTS, 2
MONTHS, 2 WORKSTATIONS
Bill of labor Master Schedule
Produk Month
P1 P2 M1 M2
Work Center Produk
WC 1 a11 a12 P1 b11 b12
RCCP
M1 M2
Work center
C11 C12
WC 1
WC 2 C21 C22
• A
EXAMPLE
Master Schedule
Bill of labor
Produk
Month
P1 P2 M1 M2
Work Center Produk
RCCP
Month
M1 M2 • C11 = (0.3 x 100) + (0.2 x 300) = 90
Work Center
WC 1 90 140 • C12 = (0.3 x 200) + (0.2 x 400) = 140
• C21 = (1.0 x 100) + (0.7 x 300) = 310
WC 2 310 480 • C22 = (1.0 x 200) + (0.7 x 400) = 480
The CPOF and Bill of Labor methods
assume that all components are
produced at the same time as the
production of the final product
RESOURCE
Resource profile is the most specific RCCP
PROFILE technique compared to the other two
APPROACH techniques
Total
Aug Sep Oct Nov Dec Hours
1600 1900 1900 1900 1900 19700
160 190 190 190 0 1820
800 950 950 0 0 8350
320 380 380 380 0 3642
640 760 760 760 0 7280
3520 4180 4180 3230 1900
RESOURCE PROFILE: MATRIX FORMULATION 2
PRODUCTS, 3 PERIODS, 3 LEAD TIME, 2
WORKSTATION
Time to Resource Profile MPS
Month
due date
2 1 0 1 2 3
Product Product
a112 a111 a110 b11 b12 b13
P1 P1
Work Center 1
2 1 0
Work Center 2
Time to Resource Profile MPS
Month
due date
2 1 0 1 2 3
Product Product
a112 a111 a110 b11 b12 b13
P1 P1
Work Center 1
2 1 0
Work Center 2
RCCP
Month
c11
a110 b11 a111 b12 a112 b13 a 210 b21 a 211 b22 a 212 b23
Work 1 2 3
c12
a110 b12 a111 b13 a 210 b22 a 211 b23 Center
c a110 b13 a 210 b23 c11 c12 c13
13 WC 1
c 21
a120 b11 a121b12 a112 b13 a 220 b21 a 221b22 a222 b23
c 22
a120 b12 a121b13 a 220 b22 a221b23 WC 2 c21 c22 c23
c 23
a120 b13 a 220 b23
EXAMPLE:
2 PRODUCT, 4 PERIODS, 2 LT, 2 WC
Bill of Labor
Week until due
Work Center Product 1 Product 2
1 0 1 0
A 20 0 15 0
B 0 30 0 25
Work Center A
1 0
P1 0 30
P2 0 25
Work Center B
EXAMPLE:
2 PRODUCT, 4 PERIODS, 2 LT, 2 WC
Time to Resource Profile
MPS
due date week
Product 1 0 1 2 3 4
Product
P1 20 0 100 200 250 100
P1
Work Center A
RCCP:
1 0 Product 1, week 1, WC1:
P1 0 30
= (0 x 100) + (20 x 200) = 4000
Work Center A
RCCP:
1 0 Product 1, week 2, WC1:
P1 0 30
= (0 x 200) + (20 x 250) = 5000
Work Center A
RCCP:
1 0 Product 1, week 3, WC1:
P1 0 30 = (0 x 250) + (20 x 100) = 2000
Work Center A
RCCP:
1 0 Produk 1, week 3, WC1:
P1 0 30 = (0 x 100) + (0) = 0
Work Center A
RCCP
week
1 0 Work 1 2 3 4
Center
P1 0 30 7750 6500 6500 0
WC 1
Work Center B
CPOF requires a little data, but
it is not suitable to be applied
when the product mix
composition changes
SELECTION
OF THE BOL is better in terms of
accuracy than CPOF, but only
RCCP when using up-to-date data
METHOD
Duty:
Calculate the capacity requirements for each work center during
2007.
Can the existing capacity meet the specified master production
schedule? If there is a lack of capacity, and the option to increase
capacity is only allowed with an overtime policy, what decisions
should be taken?