Project Overview:
The aim of the project is to
design an off-grid PV system that
is capable of powering a water
purification plant to meet USTF
dentistry college water demand.
PV panels shall be installed on
the roof nearby the existing RO
and its auxiliary filters.
The plant consists of an RO unit ,
a Softener and a UV filter.
Demand
In terms of water:
daily water consumption has been
estimated as: 13 hours * 60 gal/hr =
780 gallons/day
Total of 3900 gallons/week.
In terms of electricity:
total power ~ 1.1 kW and hence the
estimated daily Energy would be:
1.1*13= 14.3 kwh /day
Resource
PV panels
Selection
Number of PV panels was selected is (12 PV panels)
Solon SE (225 Wp 25 Volts) panel mono-silicon
based on:
1- energy requirement.
3- Price.
Storage options were defined
based on:
Storage 1- Compatibility
Options
2- Effectiveness
1. Buffer Tank w/o Batteries.
Limited warranty