Professional Documents
Culture Documents
Operation Manual Zoomlion QY40
Operation Manual Zoomlion QY40
QY40/20-2006.
TRUCK CRANE QY40V
Truck model : ZLJ5370JQZ40V
Industrial mode : QY40V
Engine model : WD615.44
Engine No
TRUCK CRANE QY40V
Operation condition
• All the parts of mechanisms of the crane is in running – in condition in preliminary
period, so within the first 100 working hours, max.lifting load of the new crane must
not exceed 24 t (with 8 falls), and never work with Max.speed
• Supporting surface at working site should be firm and even and not sunk
• Operating crane should be stopped when wind force scale exceed 6 (13,8 m/s)
• The crane should be operated fault – freely.
Safety operation requirements
• When lifting, do not allow anyone to stand under the boom or on the rotating table
• Do not lift a load when somebody stand below. Do not allow anyone to stand on
lifting load.
• Never overload. Do not drag sideway or raise gradient an article. Prohibit lifting an
article buried in or frozen with the ground
• Never lift on the wheels. Do not travel with a lifting load. Set up the outrigger
before operation and adjust the level by level gauge, the tilt of the whole vehicle
should not be more than 1o
TRUCK CRANE QY40V
Safety operation requirements
• Prohibit telescope with a lifting load
• Prohibit lifting the same load under the condition that two cranes or more than two
cranes are simultaneously used
• The wire rope on the hoisting winch should be less than 3 rounds when lifting any
load.
• Never adjust the brake of the hoisting mechanism with a load
• When the load has been lifted for a long time the operator should not leave the
operator’s cab.
• If there is overhead electric lines nearby the working site, a certain distance
between the boom or boom + jib and the above lines should be kept as
stipulations issued by relative authorities.
• Operating should be done smoothly and slowly, never pull, push and charge over
abruptly
• Often watch the reading of the oil pressure gauge, and stop the machine
immediately to find out cause and remedy it if abnormality occur
TRUCK CRANE QY40V
Safety operation requirements
• Pay special attention to buzz sounded from the moment limiter when an actual
load is 90% of a rated load
• Stop operating when one of the following items occur
Overload or weight of a load is not clear.
A load will fall down due to unsecured or unbalanced banding and hung
A lining pad is not located between an edge of a load and the wire rope
A lifting load or a conducting signal can not be identified due to dark working
site.
Safety operation will be under the influence of a defective or damaged structure
or part, such as a faulty brake, a safe device or a damaged wire rope
Operator
• The driver with the certification
• The apprentices that have studied for more than half a year under the
supervision of the driver.
• The service and detection personnel for necessary operation.
TRUCK CRANE QY40V
Operator
• Labor supervisor assigned by higher level department
• The operator should conform to the following requirement
Good health, quick response
Eyesight (include rectify eyesight) should be more than 0,7 , not colour blindness
Listening can satisfy with working requirements
The driver and commander should possess the following requirements:
a) The driver of this machine must be familiar with this manual, operation principle,
structure, performance, function and adjusting and maintaining methods of this
machine.
b) Before operating, check the brake, the hookblock , the wire rope and the safety
devices and timely remedy it if abnormality is found
c) When operating focus attention and do not talk with other person. Normally only
respond to a signal from an operator appointed. But, a stop signal should be
responded to whether it is sent anytime by anybody. Refuse to execute if a
command is not conformed to the operation regulation. Stop operating if anyone
climb up this machine.
TRUCK CRANE QY40V
• Traveling specification
4. Min clearance…………………….………….……………..…0,281 m
Note
1. Above working condition is all with outrigger fully extended, never lift a load on the
wheels
2. Capacities above the thick line in the table are based on the boom strength the
others, on stability of the complete machine
3. The values in the table are the Max permissible values and include weight of the
hook block (the main hook block is 420 kg, the auxiliary :115 kg)
4. A working radius given in the table is a horizontal distance from the centerline of
the hook block to the axis of the slewing ring when the hook block is located.
5. When actual boom length is between two values, determine lifting capacity
according to bigger boom and radius
6. Rated lifting capacity should exclude the weight of clings and self weight of jib
(600kg) when boom is used with jib extended
TRUCK CRANE QY40V
TRUCK CRANE QY40V
The operator’s cab
1. All steel structure. Adopt modern streamline type style, all covered PVC decoration
material. Front window and roof window of the operator’s cab are double layered
integral arc window. Roof window is fitted with roller shutter, right, rear and left
side window adopt toughened glass with 5mm thickness. There is a coat hook at
back of right side moving window, and a tea cup support beside the seat. High
back chair, ergonomics design supply wide vision and comfortable operation for
the operator
2. There are wiper, electric control box, computer, etc. in the operator’s cab. You can
control the engine in the operator’s cab to adjust the accelerator. Heating device or
air conditioner can be fitted according to the requirements of the customers.
Devices in the operator’s cab refer to fig 5.2 . All steel structure. Adopt modern
streamline type style and toughed glass, it is fitted with sun shading board, wiper,
electric control panel and computer, etc. You can control the engine in the
operator’s cab. Electric control box panel refers to fig 5.2
TRUCK CRANE QY40V
Telescoping lever
Sequence
Adjusting lever
Slewing lever
Horn button
Pressure gauge box
Slewing brake pedal
Main and auxiliary winch lock
Accelerator pedal
TRUCK CRANE QY40V
7 6 5 4 3 2 1
1. Key switch
8 2. Enforcement release button
Operation of outrigger
After thee outrigger beams are extended completely, put the extending
and retracting select lever 1 back to neutral position
c)If use the 5th outrigger, put downward the 5th outrigger select lever 1
homely, extending the front outrigger by operating control select lever.
Operation of outrigger
a) Installation of rear right float : extract the inserting pin of the fixed outrigger float
before the rear right outrigger is extended, then pull the float to the vertical
poison with the vertical cylinder, and fix it by fixed inserting pin. Extract the
inserting pin of the fixed float when the rear right outrigger is extended homely
then rotate the float 45o and pull inside homely, then fixed inserting pin.
b) Installation of other three floats: extract the inserting pin of the fixed float before
the outrigger is extended, then pull the float to the vertical position with the
vertical cylinder, and fix it with fixed inserting pin. Extract the inserting pin of the
fixed float when the outrigger is retracted homely, the push the float inside.
TRUCK CRANE QY40V
Operation of outrigger
Note :
3. Once the 5th outrigger touches the ground, the extending should be
stopped. If the 5th outrigger is extended too much, the two front
outriggers will loose and can not burden any force, which is not allowed
to occur.
Hoisting mechanism
The hoisting mechanism consists of the
hydraulic motors, the winch reducer,
the brake, the roller clamping, the wire
rope over- lowering protection device,
wire rope and the main and auxiliary
hook blocks.
The hoisting mechanism includes main
and auxiliary winch. The structure of
the main and auxiliary winch is the
same (only the length is different), they
can be exchanged. The control levers
of main and auxiliary winch are the
same and in the operator’s cab (refer to
fig 5.1). The operation methods refers
to Fig 8.1
TRUCK CRANE QY40V
Hoisting mechanism
With the counterbalance valve in the
hoisting mechanism, the boom is not
only operated smoothly but also can be
stopped in any position.
The main winch is used with the boom.
The main winch is designed for duty for
the boom, while hoisting is done, the
length of the wire rope may be
insufficient with the boom length being
increased. Thus, adjust by changing
number of fall of the wire rope, and
when doing so, fit the height limit
weight. Auxiliary winch is used together
with jib or boom nose sheave.
TRUCK CRANE QY40V
Hoisting mechanism
Note:
a) Select the suitable falls of the wire rope according to the length of the lifting boom.
Do not lift if the hook is rotated due to the twisted wire rope
b) Under any condition, turns of the wire rope on the drum must be at least 3e
c) When a lifting load is away from the ground, give a pause to make sure that
safety is ensured and then raise this load continuously
d) When the load has not left the ground, do not do telescoping or derricking to lifting
a grounded load.
e) Do not abruptly move the control lever from” hoist up” to “hoist down” or from “
hoist down” to “hoist up”. While charging, fist, put the lever in neutral position,
then, operate after make sure that the drum is stopped, otherwise, the machine
parts will be damaged.
f) Lifting capacity includes weight of hook and clings
g) Never use high hoisting speed with load
TRUCK CRANE QY40V
Derricking mechanism: Push the lever forward to
• The derricking mechanism mainly serves lower the boom derricking
the function of increasing boom angle by
extending or retracting the two derricking
cylinders to charge working radius.
• Boom angles varies from -2o to 80o . With a
boom angle of -2o, Its more convenient to
erect the jib and repair the parts of the
boom nose. The control lever of the
derricking mechanism is located in the
operator’s cab. (see fig 5.1). The operation
method refers to fig 9.1
• With the counterbalance valve in the
hydraulic system, the boom is not only
operated smoothly but also can be stopped Push the lever backward to
in any position. raise the boom derricking
TRUCK CRANE QY40V
Derricking mechanism:
Note:
1. Operating should be very stable. While lifting a load, abruptly operating will result
in severe shock.
2. During lifting loads, lowering the boom, increases the working radius. And, at this
time, take care of avoiding over- turn caused by overload. The max radius should
be limited according to lifting capacity table.
3. Boom min. elevating angle should not be less than 20 o When boom telescopes
without load. (Elevating angle value can be read by angle indicator)
Slewing mechanism
Note
1. Smooth operate. Never stop of
changeover abruptly, which is
dangerous and should be avoided
2. When doing slewing, be extremely
careful for persons and obstructions
near the crane and sound the horn to
ensure safe operation.
3. Check slewing ring bolt after the first
100 hours’ working for safety. Make
sure that tightening torque should be
900 N.m .Then check again after 500 Slewing brake pedal
hours’ working.
TRUCK CRANE QY40V- Fig 12.1 Power transmitting diagram
Hydraulic Hydraulic
motor motor
Slewing Hoisting
gear winch
Hydraulic system
Main working circuit
introduction:
3. Derricking circuit :
Single pump working
displacement : 80 ml/r.
When derricking up, the Max.
system working pressure is
adjusted to 21 Mpa. The
balance valve is fitted on the
oil circuit on the derricking up
direction, which can prevent
the load from falling because
of stalling, can keep the load
in any position in the air
TO TANK 63 80
FROM PUMP 32
TRUCK CRANE QY40V
Hydraulic system
Main working circuit introduction :
4. Telescoping circuit :
Pump working displacement : 80 ml/r.
The boom has 5 section, the 2nd ,3rd ,4th
and 5th boom are telescoped by
telescoping cylinder and telescoping wire
rope. First let cylinder I extend to drive
the extending of the 2nd ,3rd ,4th and 5th
boom section. When the cylinder I
extends homely, let the cylinder II extend
to drive the extending of the 3rd ,4th and
5th boom sections. For the retraction,
cylinder II first, then cylinder II. The
balance valve and low pressure relief
valve are fitted in the circuit to ensure
stable and reliable stop during boom
retraction
TO TANK 63 80
FROM PUMP 32
TRUCK CRANE QY40V
Hydraulic system
Main working circuit introduction :
5. Slewing circuit :
Pump working displacement : 32 ml/r.
Fixed motor displacement : 28 ml/r.
All the slewing system can work stably.
Opening of slewing brake solenoid valve, to
let solenoid disengage, the brake close,
engage the solenoid valve, the brake is
started by the action of constant pressure
Thecontrol
slewingoil.brake solenoid valve control button is set on the panel, close the solenoid
valve can let the slewing of the superstructure par in lock condition.
When open the control button of the slewing solenoid valve, the superstructure part is in
float condition, which can realize the free centralization of the slewing to prevent the
boom from bending because of side force
The check oil add valve is fitted on the A, B pot of motor to prevent the damage of
slewing motor because that the oil in the circuit is absorbed emptily
TRUCK CRANE QY40V
Hydraulic system
Adjusting of hydraulic system
The relief valves are built in the hydraulic system for the outrigger, the telescoping,
the derricking, the slewing and the hoisting mechanisms to prevent the system from
overloading and to ensure safety operation. The relieve valve pressure of boom
derricking, derricking system are adjusted to 21 Mpa, the relieve valve pressure of
winch mechanism is adjusted to 20 Mpa. Pressure of the relief valves is set before
delivery and should not be arbitrarily adjusted under normal condition. If necessary
or when the relief valves are replaced, adjusting should be done by experienced
technician who is familiar with the structure of the hydraulic system and by the
sequence below.
Adjusting according to the following method:
1. Adjusting according the relief valves for the telescoping and the derricking
mechanisms. Loose the adjusting screw of the relief valve, move the telescoping
control lever to Max. derricking angle position and progressively tighten the adjusting
nut of the relief valve while watching the pressure gauge 1. Lock up the adjusting
screw as soon as the pressure is up to 21 Mpa.
TRUCK CRANE QY40V
Hydraulic system
Adjusting according to the following
method:
2. Adjusting the relief valves of the
hoisting mechanism. First, set up the
outriggers to make the crane in working
order. Then, loose the adjusting screw of
the relief valve for the hoisting mechanism,
Turn off the controlled oil pipe of the
hoisting reducer brake and plug the oil
pipe, move the hoisting control lever to
“raise” position and progressively tighten
the adjusting screw while watching the
pressure gauge 2. Lock up the adjusting
screw as soon as pressure is up to 20
Mpa, then assemble the control oil pot of
the winch reducer brake.
TRUCK CRANE QY40V
Hydraulic system
Adjusting of hydraulic system
Note:
1. Check cartridge of filter after 250 h working, clean or change if necessary.
2. Clean water or foreign matter from the bottom outlet oil pot of hydraulic oil tank once
every half month. Every year (or after 2000h working) change all hydraulic oil (prolong
change period if the oil doesn’t go bad). Shorten oil change period, when crane is
used in severely bad environment
3. All the valves in hydraulic system have been set before leaving the factory. Adjusted
pressure volume should not touch arbitrarily
4. Don’t weld on cylinders without authorization. Prohibit using cylinder as welding
ground conductor.
5. All pars, especially devices of hydraulic system should not adhere with oil and dirt, so
cleaning should be done after working.
6. Adjusting hydraulic system according to above mentioned requirements, other
methods should not be used
TRUCK CRANE QY40V
Electric system
General
This system, a single wire system with 24V DC and earth negative, consists of
chassis’ electric and superstructure’ electric.
Instruction of chassis electric refers to ZLJ5413 special purpose’chassis
operational manual.
Superstructure electric includes operator’cab electric, slewing table electric,
boom electric and moment limiter installation.
Superstructure electric and chassis electric are connected by the slip ring of the
center revolving joint
1) Superstructure power (AX1.1, AX1.2, AX1.3, AX1)
2) Superstructure start (AX3)
3) Rear outline lamp, boom nose lamp (AX2)
4) Superstructure extinction (AX4)
5) Loop outline lamp (AX5)
6) The 5th outrigger overpressure ring (AX6)
TRUCK CRANE QY40V
Power Starting Cab Waiting Fan Cab Wiper Rear Nose Warning Engine Solenoid of
supply switch lamp lamp wiper lamp lamp light stop brake slewing
Fig.13.1 Electric
diagram
TRUCK CRANE QY40V
Electric system
General
Superstructure electric
diagram refers to the following
diagram I to III
Superstructure electric
mainly includes : all kinds of
control switches, indicators,
wiper, horn, main and auxiliary
winch over winding device, three
turns over lowering device
moment limiter, heater and air
conditioner
TRUCK CRANE QY40V
Moment Temp
limiter limiter
Encoder Winding
rope rope box
Check after and connect Slow Mid High Fan Temp Indicator Fan
Fan Pressure
to switch 5 outrigger speed speed speed heater sensor lamp Indicator cooling
TRUCK CRANE QY40V
Moment limiter
Moment limiter is measuring device with electronic computer as main part, it can
reflect basic specifications of the crane in various conditions. When the actual load
reaches 90% of rated load, the pre-warning signal will sound, when reaches or exceed
the rated load, the warning signal will sound and all the operations in dangerous
directions will be cut (i.e telescoping, hook up, boom lowering), only the operations in
safety directions are permitted, thus to prevent turnover, boom folded and personnel
injury because of overload of the crane during operation and ensure normal and safe
operation of the crane. But the operator should not reply on the moment limiter
completely, should operate the crane according to the values in the lifting capacity
table. For details of it, see “Instruction manual of moment limiter”
TRUCK CRANE QY40V
The function and operation of safety device
Lifting height limiter
As the hookblock is raised up to a certain height, the height limiting weight is
connected by it, the limit switch turned on and the buzzer in the switch box sounded
to warn, indicator (No.1 in fig5.2) on. Simultaneously, raising the hookblock, extending
and lowering the boom are cut off and safety, ensured. At this time, only allow
lowering the hookblock or retracting or raising the boom (operating toward safe
direction) to disengage the limiting weight and to bring lifting back to normal. In
particular case, if slightly over-hoisting is needed, press enforcement button on the
side of instrument box and all the motions are restored to normal. Do so very carefully
so as to avoid an accident.
Safety device for derricking
In case of high- pressure hoses or oil pipes in the circuit for derricking cylinder being
broken or cut off, the counterbalance valve functions to block the working oil from the
lower chamber of cylinder so that no falling of the boom will occur, and safety , is
ensured.
TRUCK CRANE QY40V
Others
Maintenance
Gear oil
Note:
Exchange the oil if the gear oil is heavy polluted, though it doesn’t reach
exchange period
Often check oil lever, if it is below regulated volume, add oil.
Use recommended lubrication oil according to environment temperature,
unqualified or unsuitable adhesive lubrication oil will damage reducing
mechanism.
8 10
1 2 4 5 6
3 7
9
1 week
10 week
1 week
30 week 16
10 weeks
180 week 15 11
30 weeks 17 14 12
180 weeks 13
TRUCK CRANE QY40V
Maintenance
Replace standard of wire rope
1. When the broken wire rope of every strand is 10% (exclude the wire core)
2. When the diameter is more than 7% less than nominal diameter
3. When the wire rope is twisted
4. When the shape of wire rope is changed obviously, the wire core is
exposed, and is in birdcage shape and it corroded
Replace the wire rope when the above mentioned (1) to (4) phenomena occur.
5. When the wire rope is disengaged from pulley and is pulled tightly.
6. When the wire rope is damaged by the sparks
7. When the wire rope is damaged by the sparks of electric welding or air
welding.
8. When short circuit occurs
9. When the wire rope is effected by high temperature
When the above mention (5)to (9) phenomena occur, replace, replace the wire
rope or not according to damage degree.
TRUCK CRANE QY40V
Maintenance
Coat the lubrication grease
on the surface of the wire
rope
1. First clean the dust or used
grease on the surface of the
brush or cloth before coat
the lubrication grease on
the wire rope
2. Coat the lubrication grease on the surface of the wire rope evenly by the
brush or cloth. Don’t use the abandoned oil of machine oil because it has
acidity
3. Note: Never touch the wire rope at the front of the pulley by hand in
order to avoid the hand being cut by the wire rope when move the wire rope
by the hand
TRUCK CRANE QY40V
Troubleshooting during crane operation
Emergency method
No fault will occur if only correctly operate and serve this crane. In order to avoid an
accident in case of a trouble being developed in the hydraulic system, it is better to
take following measure to unload and then remedy it. Be careful when doing so.
When the derricking fails to lower: first, lower the lifting load on the ground, then
remove the fitting of oil pipe to the upper chamber of derricking cylinder and loose
the counterbalance valve and the lower chamber of derricking cylinder, and the
boom lowers while oil flows out slowly.
Troubleshooting
If fault occurs during lifting work, should investigate and analyze first to find out
real cause and adopt adequate methods. The normal troubleshooting refer to below
TRUCK CRANE QY40V
Trouble no
1. PTO is out of control
Cause
1. Pressure is insufficient
2. Air line blocked or leaked
3. PTO switch is out of control
4. Solenoid valve is blocked
Remedy
1. Raise pressure
2. Check and repair air line
3. Repair or replace
TRUCK CRANE QY40V
Trouble no
2. Oil line leaks
Cause
1. Fitting loosened
2. Seal part damaged
3. Pipe broken
Remedy
1. Tighten
2. Replace
3. Weld or replace
TRUCK CRANE QY40V
Trouble no
Oil pressure fails to raise
3.
Cause
Remedy
1. Add oil or check suction line
2. Adjust relief valve
3. Speed up engine
4. Repair oil line, especially valves, center revolving joint and
motor
5. repair
TRUCK CRANE QY40V
Trouble no Noise in oil line
4.
Cause
Remedy
Cause
Remedy
Cause
Remedy
1.Repair
TRUCK CRANE QY40V
Trouble no
7.
Outrigger will retract by itself while lifting is being done
Cause
Remedy
1.Repair
2.Repair the seal part of piston
TRUCK CRANE QY40V
Trouble no
8.
Pressure gauge inoperative
Cause
Remedy
1.Repair
TRUCK CRANE QY40V
Trouble no
9.
Pressure is too high or shocking occurs
when telescoping is being done
Cause
Remedy
1.Clean
2.Repair and lubricate
TRUCK CRANE QY40V
Trouble no
10.
Shocking occurs when boom
lowers
Cause
Remedy
Cause
Remedy
Cause
Remedy
Cause
Remedy
Cause
Remedy
Cause
Remedy
Lifting conduct
signal
Emergency stop
Place two forearms
horizontal in front of
the chest, extend the
five fingers, and let
the palm downward
and wave two
forearms to two
sides separately
TRUCK CRANE QY40V