PT CUPG - Cutting Room Pre-Installation Preparation VT-FA-iQ80
PT CUPG - Cutting Room Pre-Installation Preparation VT-FA-iQ80
2
CUTTING ROOM - Electrical Power Supplies :
5
CUTTING ROOM – Pneumatic Air Supplies :
6
CUTTING ROOM – Removal of Waste Air
7
CUTTING ROOM - Waste Box for Auto Cutter :
8
CUTTING ROOM - Overhead Rail :
9
CUTTING ROOM - Overhead Rail :
- The noise level of the cutter in normal operating condition is less than 75 dBA.
- Temperature ................................................................................................ 10 to 43°C
- Humidity.................................................................... 30 to 95 % without condensation
10
CUTTING ROOM - OPM Rail :
Need check ground floor flat or not ? and how many mm not flat 11
CUTTING ROOM – Overhead Rail & OPM Rail
Measurement
12
CUTTING ROOM - Unpacking and Handling :
13
CUTTING ROOM - Maritime packaging : 86" cutter in a
container
14
CUTTING ROOM – Machine Handling
15
CUTTING ROOM – Machine Handling
Example of handling by crane
16
CUTTING ROOM – Manual Spreading Alignment Laser Light
17