BRIDGE

Proposal For Information and Communication


Technology Infrastructure
For HG-TECH CORP NEVIS
Overview
• Bridge is pleased to submit this proposal for
services to install structured cabling and other ICT
infrastructure to support HG-TECH CORP NEVIS
in achieving its goals of overseeing the IT
Operations and Security Infrastructure of the
Organization.
The Objective

1 2 3 4
Need #1: Design and Need #2: Provide for Two Need #3: Design and Need #4: Design and
Install Cabling to Support separate Internet propose costing and propose costing and
Data, Wi-Fi and Networks that can be installation for Electronics installation for Enterprise
Telecommunications shared or used Office Equipment Wi-Fi Network
Infrastructure Independently
1 2 3 4
Need #5: Design propose Need #6: Provide costing Need #7: Provide for Need #8: Design and
costing and installation for and installation for separate Voice and Data propose costing and
Secure Corporate Antivirus, Productivity Network installation for PBX
Computer Network with and Backup Software Telephone System
File Sharing
Solution

Recommendation #1: Based on walkthrough we have determined a


requirement for a total of 62 End Points combined for Data
transmission

Recommendation #2: The 62 End points will consist of 4 virtual


subnets so that the Access, Wireless, Printers and Management systems
are independent of each other.
Recommendation #3: We recommend use The Cable and Flow Internet Service
Providers with at least 50MB in bandwidth from each. We will provide a Load
Balancer to create a total throughput of 100MBs in bandwidth and provide fail over
services in case of internet outage.

Recommendation #4: We recommend the purchase of 45 desktop computers for


Offices and 2 laptops for meeting and conference rooms. We also recommend one
large main copier for general use and two small color printers for President and
Secretary General offices. Computers Equipment and Electronics are listed in
separate estimate attached.
Recommendation #5: We have proposed Ubuquiti Unifi Based
Enterprise Network consisting of 4 access points and one Wireless
Controller.

Recommendation #6: 2 Smart TVs to display advertisement at the


front desk, Projector and 2 Web Conferencing Cameras are
proposed based on walkthrough and drawings.
Recommendation #7: A Total of 47 Computers and 1 Server will be
recommend for the network and Antivirus, Microsoft Office 365 and
Cloud backup software will be installed on all. Estimates attached.

Recommendation #8: A Dell Server with 47 Clients in the domain is


proposed. Cost Estimates attached.

Recommendation #9: A PBX phone system with 5 phones is proposed


based on walkthrough and drawings.
Qualifications
• Bridge has a well-deserved reputation for quality services
because of our highly trained and experience staff as well
as excellent customer service developed over years of
working in the Business Community and tourism industry
serving management, staff, and guests alike.
• Bridge is an innovative firm that guarantees resolution to any
problem or “technical difficulties” in IT infrastructure &
operations to real world IT challenges. We create an effective
solution suiting your budget and catering to your technological
needs.
• Our team working on your project will consist of persons
with years of IT Industry experience working on building IT
infrastructure as well as Systems Administration and
Operations. Namely: Khalique Martin, Michelle
Hutchinson, Kevicia Gumbs and Kevin Jones.
• You can be sure that Bridge’s capabilities and proposed solution align with
HG-Tech Corp. needs for an effective and robust network, especially
knowing that we are uniquely qualified to address the current opportunity.
PRICING

 The installation will take the course of 10 days up until


completion and would be categorized in phases. At
bridge we strive to deliver the cleanest and most
effective install in timely manner saving you the
inconveniences of technical.
Phase and Duration

Phase Duration

Cable Installation 2 days

Hardware Positioning 3 days

Device Installation 2 days

Testing 3 days
Conclusion
We look forward to working with HG-Tech
Corp. NEVIS and supporting your efforts to
build a robust IT Network with state-of-the-art
infrastructure and equipment. We are
confident that we can meet the challenges
ahead and stand ready to partner with you in
delivering an effective IT Network Solution!