The document summarizes emergency preparedness activities for four weeks in October. In the first two weeks, standard operating procedures and forms were created, fire alarm detectors were installed, and quotations for maintenance contracts were obtained. In weeks three and four, fire detection systems and equipment were tested, flammable materials were relocated, firefighting pumps were inspected, and fire extinguishers were maintained. Employee training on first aid and evacuation procedures also occurred.
The document summarizes emergency preparedness activities for four weeks in October. In the first two weeks, standard operating procedures and forms were created, fire alarm detectors were installed, and quotations for maintenance contracts were obtained. In weeks three and four, fire detection systems and equipment were tested, flammable materials were relocated, firefighting pumps were inspected, and fire extinguishers were maintained. Employee training on first aid and evacuation procedures also occurred.
The document summarizes emergency preparedness activities for four weeks in October. In the first two weeks, standard operating procedures and forms were created, fire alarm detectors were installed, and quotations for maintenance contracts were obtained. In weeks three and four, fire detection systems and equipment were tested, flammable materials were relocated, firefighting pumps were inspected, and fire extinguishers were maintained. Employee training on first aid and evacuation procedures also occurred.
The document summarizes emergency preparedness activities for four weeks in October. In the first two weeks, standard operating procedures and forms were created, fire alarm detectors were installed, and quotations for maintenance contracts were obtained. In weeks three and four, fire detection systems and equipment were tested, flammable materials were relocated, firefighting pumps were inspected, and fire extinguishers were maintained. Employee training on first aid and evacuation procedures also occurred.
Initiate SOP dedicated for the system Review the emergency action plan we have (FF-FA) and including SOPs & SOP and convert it to manual assembly point Approval cycle Filling SOPs Forms Forms Three forms were made to cover what needs to be checked internally Review offers for maintenance Complete installation of fire alarm contract & for gas detection detectors in labs area Three quotations for fire-alarm Fire detection system for gases systems Fire-Alarm maintenance contract used inside labs Compete installation of a repeater Review offer for repeater inside production area installation in security room Relocate all flammable materials to the Begin testing & inspection for fighting Three quotations for fire-fighting dedicated WH according the approved pumps weekly by HSE team the format maintenance contract flammable list Fire-fighting will be according to NFPA 25 Initiate a fire Assessment for the Maintenance will be conducted Begin filling the fire-extinguishers flammable Warehouse, needs two checklist and relocate them as per NFPA monthly. weeks from now 10 Install a hammer for breaking Evacuation procedure will be Evacuation the emergency doors glass conducted with civil defense
An advanced first-aid training for
First-Aid 15 employee from a certified Training for first aid for shift B personnel under 100 JD employees, drivers , & security