Basic Kaizen Tools
Basic Kaizen Tools
TOOLS
1. TARGET PROGRESS REPORT
2. STANDARDIZED WORK SHEET
3. TIME OBSERVATION SHEET
4. CYCLE TIME / TAKT TIME BAR CHART
5. YAMAZUMI (STACK) CHART
6. STANDARDIZED WORK COMBINATION SHEET
7. CAPACITY SHEET
8. KAIZEN PROPOSAL SHEET
9. KAIZEN NEWSPAPER
Using the Basic Kaizen
Tools
3
1 2
4
5 6
7
CATEGORY CURRENT TARGET DAY 1 DAY 2 DAY 3 DAY 4 FINAL RESULT % CHANGE
INVENTORY
WALKING DISTANCE
CREW SIZE
PRODUCTIVITY
REMARKS:
STANDARDIZED WORK SHEET DATE: _____/____/____
Process: __________________________ Approvals:
Part # ____________________________ Scope of
FROM:
Operation
Part Name: ________________________ TO:
SYMBOLS Quality Safety Standard Work Total Pcs of Std Takt Cycle Operators
NOTE: Takt Time, Work Sequence (same as numbers in “Step” column on Co BASIC
Check Precaution In Process Work in Process Time Time this op/line total
mbination Sheet), and numbers of Standard Work in Process must be known t
o define Standardized Work. Identify all safety concerns, points where quality DATA
must be verified (go/no-go) and numbers of pieces of standard work in proces 1/
sec.
s using the symbols to the right.
Page _____ of _____
TIME OBSERVATION SHEET
Date / Time: ___/____/____/_________________:________
Line / Process: __________________________________________________
Observed by: _____________________________________
10
11
12
13
14
15
1 2 3 4 5 6 7 8 9
Process
Cycle Time / Takt Time Bar
Chart (with
Cycle Graphing
Time / Takt Feature)
Time Bar Chart
1.2
1 T/T
0.8
0.6
0.4
Cycle Time
0.2
0
1 2 3 4 5 6 7
Before
After Process
Yamazumi (Stack) Chart
Yamazumi (Stack) Chart (Blank Chart)
Cycle Time
1 2 3 4 5 6 7 8 9
Process
Yamazumi (Stack) Chart (with
Graphing Feature)
Yamazumi (Stack) Chart
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6
1
0.8 T/T
0.6
0.4
0.2 Time
Cycle
0
1 2 3 4 5 6 7
Process
Operator _____ of _____
Waiting
Totals
Page ____ of ____
New / Revised as of (date): ___/___/___
Current Output
Authorizations: Part No. Line pieces
CAPACITY Part Name
Max Output
pieces
Per Day
Workers
Subtotal NOTE
Update times when improvements are achieved through kaizen, and detail reasons for improvement in “Remarks” column.
Total
KAIZEN PROPOSAL SHEET
Location Objective Date Operator
Before After
Problem Effects (cycle time / inventory / changeover time reduction,poka yoke etc.)
KAIZEN NEWSPAPER
TEAM: __________________________________ DATE: _______/_______/_______/___________
改
In recognition of your earnest efforts to learn
and practice kaizen during the [XXX] Kaizen
Workshop held at [XXX] factory during the
week of [Date], you have been granted this
善
license to practice kaizen daily in accordance
with the principles of Just in Time, Quality in
Station, Production leveling, and Production
Preparation.