D E V E L O P M E N T O F FO OT PAT H A N D C YC L E T R AC K O N B H AU

PAT I L ROA D U N D E R T H E 1 5 T H F I N A N C E C O M M I S S I O N
Pune Municipal Corporation Pune
Road Department
Presentation on : – Development Of Footpath And Cycle Track On Bhau
Patil Road Under The 15th Finance Commission

TOTAL COST- 7,49,73,265/-

Date :01/08/2022

By : Executive Engineer – Gojare D.B.

Name of Work
DEVELOPMENT OF FOOTPATH AND CYCLE TRACK ON
BHAU PATIL ROAD UNDER THE 15TH FINANCE
COMMISSION
DEVELOPMENT PLAN PUMPING STATION

AMBEDAR CHOWK
AREA STATEMENT

Sr. No. Description No. L B D Quantity Unit

  Bhau Patil Road (30m Dp)            

1 Footpath/Paving Area 2 1050 2   4200 Sqmt

2 Cycletrack 2 1050 2   4200 Sqmt

3 Plantation Area- Road side 2 1050 0.5   1050 Sqmt

4 Plantation Area- Median 1 1050 0.6   630 Sqmt

        Total Area 10080 Sqmt


SUMMARY SHEET
Major items      
Sr No. Item Qty unit Amount
1Excavation & Dismantling 12615Cum 2607444.00
2Tranportion 5923Cum 2191510.00
3Earthwork 3002Cum 2746830.00
4Subgrade Material 1127Cum 2711109.00
5Bitumen Work 815Cum 8571677.00
6Concrete & RCC 860Cum 6605494.00
7Masonry Work 166Cum 1018203.00
8Plastring & painting Work 2528Sqm 1562358.00
9Steel & Structural Steel 16Mt 1736345.40
10Paving Work 6366Sqm 6607300.00
11kerbs, Devider & Tree grating 10676Per. No. 9164639.00
12Service Lines 9410Rmt 4730500.00
13Horticulture & Drip irr.     3408506.80
14Operation & Mentenance     2169422.40
    Total Of Major Items 55831338.60
    Miscellaneous 6982057.64
    Testing Charges 204485.00
    Total 63017881.24
GST (18%)+Royalty 11955383.68
 
    Total 74973265.00
Total Area-10080sqm Rate per Sqm 6231.48 Rs/Sqm
CYCLE TRACK

CYCL E TRACK
2MWIDE PARKING
2M WIDE

2MWIDE PARKIN
2M WIDE 2M WIDE
FOOTPAT 7MWIDE 7MWIDE FOOTPAT
H C A R R I A G W AY C A R R I A G W AY H

2M WIDE
G
N a m e O f Wo r k : - D E V E L O P M E N T O F F O O T PAT H A N D C Y C L E T R A C K O N
B H A U PAT I L R O A D U N D E R T H E 1 5 T H F I N A N C E C O M M I S S I O N
N a m e O f Wo r k : - D E V E L O P M E N T O F F O O T PAT H A N D C Y C L E T R A C K O N
B H A U PAT I L R O A D U N D E R T H E 1 5 T H F I N A N C E C O M M I S S I O N

2m Wide Cycle track Both side


BEFORE

AFTER
PUMPING STATION
SUSTAINABLE STRATEGIES USED

• Recharge pits S T O R M W AT E R M A N A G E M
• Drip irrigation system ENT
U S E O F S U S TA I N A B L E M AT E R
IALS
LANDSCAPING & U R B A NH E
AT ISLAND

R A I NG A R D E N & RECH
Sustainable ARGE PITS
material for paving

Permeable pavement to be used


in parking bays for reducing
heat islands

Planting buffer with


provision of drip
irrigation