Project Case - Smart Sewing
Project Case - Smart Sewing
Project Case - Smart Sewing
LEAN.ncpark@gmail.com
Objectives
Team / Resources
Condition - BEFORE
Procedures
Condition – AFTER
KAIZEN Metrics
Benefit Summary
Project Roadmap
Appendix
- Supported Data (Pictures, Videos, Graphs, etc)
OBJECTIVES
Project Timelines
I.T. teams
Production & QIP teams • Program & devices installation
• Especially related with IoT things
• Control WIP & Project Implementation
PRODUCTION • User training
• Review process (prod. leaders)
• CTQ process review ( QIP teams) &QIP I.T. • Communication w/ vendor
teams
LEAN Mechanics/
Engineering
Sewing Area
Visual Board
Stitching Automation
Collect Output
• Manual report Output on Visual boards
Stitching Regular • Collect Per Hours
PROCEDURES
User Control
Process Sewing
TT 37.50 MP 15
LOB – Before TCT 470.89 % LOB 83.7%
Pitch Time 36.85
Output
275 Prs
Change Over
519v2 to 608v5
768 prs/day
Ramp Up CO
608v5
Output
219 Prs
KAIZEN METRICS
PPH (Sewing/ C2B) 6.4 (PPH Sewing) 6.86 (PPH Sewing) 7.2 %
1.67 (PPH C2B) 1.74 (PPH C2B) 4.1%
RFT Next step Implementation
Lead Time 13.02 days 11.73 days 9.9% e.g 10K order
RFT system not implemented yet, due to we will upgrade from Barcode system to Touch Pad Monitor
BENEFIT SUMMARY
Desc. By Cell By Factory
Investment
Impact Increase Output : 768 prs/ day 852 prs/day Increase Output : 6480 prs/ day 7186 prs/day
(+10.9%) (+10.9%) (Base On Capacity Dec’21)
MLT reduce ± 9.9% MLT reduce ± 9.9%
Innovative Focus in biggest portion in C2B Labor count. (sewing in the biggest)
Stability & effective learning in stitching (covered : turnover & new workers training )
Applicable For all model in stitching line (pilot project in 2 different type of cell)
Effort Collaboration dept. : LEAN, Production, QIP, IT & Mechanics
Duration : 5 month plus (still on progress) since July 12th ,2021
Estimate Payback Period (per cell investment) = 5.26 months (based-on Indo’s Labor cost)
MLT IMPACT : Reduced 1.291 days (9.9%) * with assumption for 10K’s PO
T HANK Y OU
APPENDIX
APPENDIX
CHALLENGES
FINDING Suggestion
Issue
• Button install use a • Cable power installation
cable (not simple) (battery/wireless power suggestion)
• Disadvantages of battery
1. users could not know when they need to change battery
2. Dry cell battery : too expensive for factory
3. If use rechargeable Li-ion battery, concern on safety &
stability problem (due to can cause fire)
FINDING • If use
Issue Suggestion
• Inconsistent • Make a signal or “Alert/ Andon”
Operator use a
Bottom button.
Not Used
RFID + Andon +
color display
CHALLENGES
FINDING Suggestion
Issue
• Unstable • Discuss with factory (IT division) for upgrade
Connection spec connection device needed
Code of
Error
Upgrade RFID +
color display +
Andon (M/C, Quality,
Mt’l)
FINDING Suggestion
Issue
• Need manual • Remote ‘Change-over’ button
installation button
• Long time on
change button
position at change
over model
CHALLENGES
FINDING Suggestion
MT 510v3 Issue
• Show only one • Show data mix model running on the Visual
model data on the Data Report
Running
Mix Model
ML 574v2
Visual Data Report