Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 33

LIVE CASE

STUDY
GROUP 3
MIXED USE
LIVE CASE
STUDY

BAY
PRIDE
MALL
MARINE
DRIVE,
KOCHI
GROUP 3
AKHIL
ABIJITH
APARNA
EBIN
HIBA
JUMANAH
YOUNUS
LOCATION

KERALA, LANDMARK
INDIA
BROAD WAY MARKET
GOVT. LAW COLLEGE
CENTRE SQUARE MALL
ST. MARY’S CATHEDRAL
MARINE DRIVE
ERNAKULAM ACCESS

BY ROAD: KSRTC BUS STAND (1.4KM)


BY AIR: COCHIN INTERNATIONAL
AIRPORT
(34.5KM)
BY RAIL: NORTH RAILWAY STATION EKM
(7.8KM)
SOUTH RAILWAY STATION EKM
(2.4KM)
BAY PRIDE MALL, MENAKA, MARINE BY WATER: COCHIN PORT (9.1KM)
DRIVE, ERNAKULAM
BAY PRIDE MALL RESIDENCIAL
FLOORS
NO OF FLOORS:
BAY PRIDE MALL IS ONE OF THE FIRST 10
MIXED USE BUILDINGS IN ERNAKULAM,
COMES UNDER THREE OCCUPANCIES
COMMERCIAL &
OCCUPANCY A: RESIDENTIAL OFFICES
OCCUPANCY E: OFFICE NO OF FLOORS: 2
OCCUPANCY F: COMMERCIAL

THE BUILDING HAS A


TOTAL OF 12 FLOORS PROJECT DETAILS
AND ONE BASEMENT.
THE BASEMENT PROJECT NAME: BAY PRIDE MALL
ACCOMADATES THE RESIDENTIA
SERVICE ROOMS AND L LOCATION: SHANMUGHAM ROAD,
GENERAL PARKING. MARINE DRIVE, ERNAKULAM, KERALA,
INDIA
GENERAL PARKING AT
BASEMENT AND MAL PLOT AREA: .55 ACRES / 23,995.8 SQFT
RESIDENTIAL PARKING L
AT THIRD FLOOR
RESIDENTIAL
TOWER
A,B, C AND D ARE THREE
BHK APARTMENTS WHEREAS E IS A
TWO BHK APARTMENT.
THE BASEMENT AREA COMPRISES OF :

1.GENERAL PARKING 

2.RECEPTION FOR APARTMENTS/LOBBY 

3.MANAGER OFFICE 

4.SECURITY OFFICE 

5.HOUSEKEEPING 

6.PANTRY 

7.POWERROOM 

8.PUMPROOM 

9.WATERTANK - 65.000 LTS CAPACITY 

10.LEISURE ROOM 

11.CARLIFT 
GROUND FLOOR

THE ENTIRE MALL IS FULLY AIR CONDITIONED SYSTEM,


CENTRALSIED ONE.

THE COOLING PLANT DISTRIBUTES THE CONDITIONED


AIR TO THE OCCUPIED SPACES.

THE CORRIDOR AND RETAIL SPACES ARE SEPARATED BY


GLASS.

ENTRANCE WIDTH IS 4.5M.

THE GF IS 1.5M ELEVATED FROM THE GROUND LEVEL.

THE SPACES ARE ARRANGED LINEARLY ON EITHER


SIDES OF THE CORRIDOR.
FIRST FLOOR

THE RETAIL AND OFFICE SPACES ARE ARRANGED


ON EITHER SIDES OF THE ESCALATORS.
SECOND FLOOR

COMMON CONFERENCE HALL


GAS TANK ROOM
CENTRALISED GAS SYSTEM FOR
APPARTMENTS
POWER ROOM
INDOOR PLAY AREA
AC PLANT ROOM
SERVICES

AC plant room is for the


commercial and office space.
A central service core is provided
for the commercial and office
space.
• It consists of fire stairs and a
lift.
Fire safety systems
The main fire controlling systems are generated in
Sprinkler Fire extinguishers
the first level. • Installed below the Are provided on each
The dry riser is manually operated. ceiling. floor of the mall.
• It will automatically • A similar distribution
The small tank is connected to the wet riser.
is seen in the
The wet riser is automatically operated. spray water in case
• It is connected to the sprinkler on each floor. apartments also.
of fire.
Water supply Waste disposal
There are 3 tanks for the residential area. Waste disposal in apartments is through ‘bio
2 in basement and 1 over head. bins’.
Water tank capacity : 65,000 L Each apartments have a bio bin in which
1 water tank for commercial area. organic wastes are dumped.
• Water tank capacity : 10,000 L • The inorganic waste is dumped into the
garbage chute in basement floor.
SEWAGE
THE COMPLEX DOES NOT HAVE A
SEWAGE TREATMENT PLANT AND A
SEPTIC TANK. THESE SEWAGE LINE
DIRECTLY CONNECTS TO THE
TREATMENT PLANTS IN GREATER
COCHIN DEVOLPEMENT
CORPORATION HEAD QUARTERS.
THIS IS AS PER THE MARINE DRIVE
DEVOLPEMENT PHASE 1. THE
TREATED SEWAGE WATER IS UESED
FOR WATERING TURFS.

SEWAGE PIPES IN BASEMENT SEWAGE PIPES CONNECTING


RESIDENTIAL AREAS
ELECTRIC SERVICES HVA
EACH COMMERCIAL AND OFFICE C SYSTEM HERE IS A WATER COOLED
THE
SYSTEM IN THE BASEMENT FLOOR.
SPACES HAS ITS OWN ELECTRICAL
THE COOLING TOWER WHICH EJECTS
UNIT. DIFFERENT POWERT SUPPLY
THE HEAT FROM THE BUILDING IS
UNIT IS PROVIDED FOR
LOCATED IN THE SECOND FLOOR. THE
RESIDENTIAL USE.
AIR HANDLING UNIT AND FAN COOL
UNITS IS CONNECTED TO THE CHILLER
IN THE BASEMENT. THE CHILLED AIR
FROM CHILLER IS CIRCULATED
THROUGHOUT THE BUILDING AND THE
COOLING TOWER EXTRACT AND EJECT
UNWANTED HEAT.

ELECTRICAL PLAN OF
BASEMENT
COMPARITIVE
ANALYSIS

Overview
LITERATURE CASE STUDY : LINKED HYBRID

Linked Hybrid project is a mixed use development in Beijing,


China, consists of eight 60m tall residential towers and a 35m
tall hotel structure interconnected by elevated public bridges.
Consists of an area of 2.4 million sq.foot (220,000 sq.meters)
By STEVEN HOLL ARCHITECTS

LIVE CASE STUDY : BAY PRIDE MALL

Bay Pride Mall is located strategically at Cochin Marine


Drive, facing the Arabian Sea. The Mall comprises of two
levels, ground and first levels set apart for an exclusive
upmarket commercial plaza with a total built-up area of
42,000 sq ft.
By ABAD BUILDERS
Kochi, India
Climate Info Beijing, China

 Beijing is 51m above sea level. The climate is cold and


 Kochi is 7m above sea level. The climate is tropical in Kochi.
temperate. When compared with winter, the summers have much
During most months of the year, there is significant rainfall in
more rainfall.The average annual temperature is 12.7 °C | 54.9
Kochi. The average annual temperature is 26.5 °C | 79.8 °F. The
°F. The annual rainfall is 566 mm | 22.3 inch.
annual rainfall is 2882 mm | 113.5 inch.
 July is the warmest month of the year. The temperature in July
 With an average of 28.2 °C | 82.8 °F, March is the warmest
averages 27.3 °C | 81.1 °F. At -3.7 °C | 25.3 °F on average,
month. In August, the average temperature is 25.4 °C | 77.8 °F. It
January is the coldest month of the year.
is the lowest average temperature of the whole year.

 The driest month is January. There is 22 mm | 0.9 inch of


 The driest month is January, with 4 mm | 0.2 inch of rain. In
precipitation in January. Most precipitation falls in June, with an
July, the precipitation reaches its peak, with an average of 170
average of 568 mm | 22.4 inch.
mm | 6.7 inch.
Zoning
LITERATURE CASE STUDY : LINKED HYBRID
 The site area being huge, the whole complex spans throughout the site
RESIDENTI providing generous public and circulation spaces.
AL  The structure consists of both vertically and horizontally zoned spaces.

MAL
L

GENERAL PARKING AT
BASEMENT AND
RESIDENTIAL
PARKING AT THIRD
FLOOR
LIVE CASE STUDY : BAY PRIDE MALL
 The site area is low, as the building is situated in Cochin
Marine Drive, which is practically a commercial gold
mine.
 Therefore the structure and its spaces are zoned
vertically is the most practical solution.
Structural Aspects

LIVE CASE STUDY : BAY PRIDE


MALL
 Basic Slab - Beam - Column construction
is used.
 Comparitively easy construction, keeping
the frame work economic
LITERATURE STUDY : LINKED HYBRID
 Structure stabilized by perimeter concrete
moment frame
 Core concrete shear walls for increased
stiffness.
 Diagonal bracings for resolving overhang
gravity loads
MATERIALS
LITERATURE STUDY LIVE STUDY
• GLASS,STEEL BRIDGES,CONCRETE SLABS • CONCRETE ,GLASS,ALUMINIUM PANELS

CONCRETE IS ECONOMICAL AND HARDEN MATERIAL.HIGH-TEMPERATURE RESISTANCE.


USES OF GLASS WILL REDUCE THE USE  ARTIFICIAL LIGHT DURING DAY TIME AND CAN VIEW
THE OUTER SPACES.
FACADE
LITERATURE STUDY LIVE STUDY

Created a focus by  passway.The large urban space in the center of the Front façade symmetrical .Created contrast in surface textures and color
project is activated by a greywater recycling pond with water lilies and
grasses in which the cinematheque and the hotel appear to float.
VIEWS
LITERATURE STUDY
The cinematheque is not only a gathering venue LIVE STUDY
but also a visual focus
to the area. The cinematheque architecture floats
on its reflection in the shallow pond, and
projections on its facades indicate films playing
within.
The first floor of the building, with views over
the landscape, is left open to the community.

Outer views were to the back water and to the city .Side
views were blocked by the neighbouring buildings.

BOTH PROJECT HAD GIVEN IMPORTANCE TO THE VIEWS TO


THE BUILDING AND FROM THE BUILDING.
APARTMENTS
LITERATURE STUDY LIVE STUDY
Four apartments occupy each
floor, so every unit is installed in
its own quadrant and has views in
two directions.  in size
from 74 to 150 square meters and
one to three bedroom.

Five apartments occupy in each


floor , with balconies to the room 
And workarea attached to the
kitchen.48 to 50 square meters.
Two to three rooms

THE WINDOWS OPEN ON TWO


ALLOWING CROSS VENTILATION.
CIRCULATION
LITERATURE STUDY LIVE STUDY

•     RESIDENCE 
         BASEMENT
           COMMERCIAL
           ACCESS TO COMMERCIAL
          ACCESS TO RESIDENCE  

SEPARATE ACCESS TO COMMERCIAL AND RESIDENCE WILL BE BETTER


TO THE DESIGN
SERVICES
LITERATURE STUDY LIVE STUDY
• A plumbing system recycles waste water for • There are 3 tanks for the residential area.
irrigation of green areas, while the large 2 in basement and 1 over head.
central reflecting pool functions as a retention Water tank capacity : 65,000 L
pond. With water becoming an increasingly 1 water tank for commercial area.
precious good in Beijing, the Linked Hybrid Water tank capacity : 10,000 L  .Rain water
objective is to reduce by 41% potable water collected from the roof and stored in 2 tanks in
use. basement ,used after filtered
• Different power supply unit provided • Different power supply unit is provided for
for each block. residential area and commercial
• Linked
, Hybrid makes use of a technique • The chiller air from chiller is circulated
throughout the building and eject unwanted
called displacement
heat.
ventilation, in which air that is slightly
below desired temperature in
a room is released from the floor.

REDUCE USE OF ENERGY CONSUMPTION IS SUGGESTED


INTERIOR
LITERATURE STUDY LIVE STUDY
Toughened glass has been
used, every part of the mall
is properly lit with led
lights .False ceilings used in
open areas

Glass and concrete slab


used 

USE OF DAYLIGHT IN INTERIOR WILL REDUCE THE USE OF ARTIFICIAL


LIGHTING.
STRUCTURE
•  The building is 12 storeyed with first 2 floors for commercial
purpose and the rest for residential along with a basement for
parking.

• STRUCTURAL DETAILS
• Slab - Beam - Column system has been used in the structure.
• Columns - Rectangular cross section.
STRUCTURE
• MATERIALS
• Concrete has been mostly used
for construction.
• Glass and Aluminium composite panels have
been used for the facades.

• Toughened glass panels are also used


in commercial spaces.
• Gypsum boards are used for false ceilings.
• Floors are being finished with ceramic tiles
as they are durable and easy to maintain.
STRUCTURE
• INTERIOR
• Toughened glass has been used for the shop facades.
• The interiors are well lit with LED lights and false ceilings
are used in open spaces.

• Escalators ,Stairs and Elevators


have been provided for vertical circulation.
• The entry and exit points are easily accessible.
• Shops and Office spaces are segregated properly.
• Central music system is provided for entertainment.

You might also like